HomeMy WebLinkAbout142.7C30G - Elevations and First Floor PlanELEVATION: E
1/2"=1'-O'
14' DEEP NATUR
WOOD CABINET
24' DEEP NATUR
WOOD CABINET
ELEVATION: F
1/2'=1'-O'
ELEVATION: D
ELEVATION: C
241 DEEP NATUR,
WOOD CABINET
EXISTING PRIVACY FENCE
F—EXISTING PAVED WALK
EXISTING EXTERIOR STEPS
CASEWORK NOTES:
1) ALL NEW CABINETS SHOWN ON ELEVATIONS
'C' THROUGH 'F' SHALL BE PAINTED -COLOR
TO BE SELECTED BY THE ARCHITECT.
2) ALL KITCHEN CABINET HARDWARE SHALL
MATCH EXISTING. ALL OTHER HARDWARE
SHALL BE SELECTED BY THE ARCHITECT
3) ALL NEW CABINETS SHOWN ON ELEVATIONS
'C' AND 'F' SHALL HAVE ADJUSTABLE SHELVING.
CABINETS SHOWN ON ELEVATIONS 'D' AND 'E'
SHALL HAVE SHELF AND POLE ARRANGEMENT
FOR SINGLE AND DOUBLE HANGING. FINAL
ARRANGEMENTS TO BE SELECTED BY THE ARCHITECT.
FIRST FLOOR PLAN:
1/4'=T -O'
DOTES:
1) ALL ELECTRICAL AND MECHANICAL FEATURES DISTURBED BY
THE NEW WORK SHALL BE RELOCATED IN A MANNER APPROV_P
BY THE ARCHITECT.
2) RELOCATE THE RETURN AIR GRILLE AND DUCT AS DETERMTNEP
IN THE FIELD BY THE ARCHITECT
REVIEWED FOR BUILDING AND ZONING CODE COMPLI-
ANCE, ERRORS OR OMMISSIONS DO NOT RELIEVE THE
APPLICANT FROM THE RESPONSIBILITY OF 'AS BUILT"
COMPLIANCE.
DATE: /0—/—/S— /�2
BUILDING OFFICIAL
ELEVATION: E
1/2'=T -O' A-1
ELEVATION:
PROJECT NO.:
REVISIONS:
PROJECT TEAM:
RCHITECT
De-m;t G. BROWN
MAIM STREET-UPBT 3
ARMCUTHPORT, MA
02676
2-3460
A�
OfTh
Eno
E
r.11
AM, AO
oft
V
QrO
/
O
L\/L
STAMP
REDAY
�G\t
G. V40 Fcl
jA
Th' O F 0SSP
/
TITLE
FIRST
FLOOR PLAN
DATE
26 JUNE 2045
DRAWN BY:
PGB
SCALE:
AS NOTED
DRAWING NO.:
ELEVATION: D
ELEVATION: C
241 DEEP NATUR,
WOOD CABINET
EXISTING PRIVACY FENCE
F—EXISTING PAVED WALK
EXISTING EXTERIOR STEPS
CASEWORK NOTES:
1) ALL NEW CABINETS SHOWN ON ELEVATIONS
'C' THROUGH 'F' SHALL BE PAINTED -COLOR
TO BE SELECTED BY THE ARCHITECT.
2) ALL KITCHEN CABINET HARDWARE SHALL
MATCH EXISTING. ALL OTHER HARDWARE
SHALL BE SELECTED BY THE ARCHITECT
3) ALL NEW CABINETS SHOWN ON ELEVATIONS
'C' AND 'F' SHALL HAVE ADJUSTABLE SHELVING.
CABINETS SHOWN ON ELEVATIONS 'D' AND 'E'
SHALL HAVE SHELF AND POLE ARRANGEMENT
FOR SINGLE AND DOUBLE HANGING. FINAL
ARRANGEMENTS TO BE SELECTED BY THE ARCHITECT.
FIRST FLOOR PLAN:
1/4'=T -O'
DOTES:
1) ALL ELECTRICAL AND MECHANICAL FEATURES DISTURBED BY
THE NEW WORK SHALL BE RELOCATED IN A MANNER APPROV_P
BY THE ARCHITECT.
2) RELOCATE THE RETURN AIR GRILLE AND DUCT AS DETERMTNEP
IN THE FIELD BY THE ARCHITECT
REVIEWED FOR BUILDING AND ZONING CODE COMPLI-
ANCE, ERRORS OR OMMISSIONS DO NOT RELIEVE THE
APPLICANT FROM THE RESPONSIBILITY OF 'AS BUILT"
COMPLIANCE.
DATE: /0—/—/S— /�2
BUILDING OFFICIAL
ELEVATION: E
1/2'=T -O' A-1
ELEVATION:
PROJECT NO.:
REVISIONS:
PROJECT TEAM:
RCHITECT
De-m;t G. BROWN
MAIM STREET-UPBT 3
ARMCUTHPORT, MA
02676
2-3460
A�
OfTh
Eno
E
r.11
AM, AO
oft
QrO
rrO�
O
STAMP
REDAY
�G\t
G. V40 Fcl
No. 1878 "s
EAST DENNIS.
0 MASS. rJy
$F,?
Th' O F 0SSP
TITLE
FIRST
FLOOR PLAN
DATE
26 JUNE 2045
DRAWN BY:
PGB
SCALE:
AS NOTED
DRAWING NO.: