HomeMy WebLinkAbout440 Higgins Crowell Road - PV Solar Layout- - - - - - - - - - - - - - - - - - - - - - ----------------------------------------------------------------- - - - - - -
YAU W11HlZ)INVGK 1 LK37-- _
__________________________________________________________________________________
j T 750kVA PAD MOUNT TRANSFORMER [. -> FULL CLEARING ZONE (WITHIN FENCE LINE)',
NO CLEARING BUFFER ZONE `. �.,�.. -, , ., ,v..,.,.., — DE
F / CLEAR CUT U U
RISER POLE WITH CUTOUTS <" _
AND LIGHTNING ARRESTORS 4'—_--------
-------------
- ----- _...
C A STUMP GRA
i
TO NATURAL CONTOURS
I WOOD CHIP AND MULCH BED FINISH
i
/-------------------------------------------------------------------------------------------------------------------------
------------------------------------------------------
UNDERGROUND ELECTRICAL AND TELEPHONE-------
--------------------------
GATE ENTRANCE/'GA
- TE ENTRANCE'
r 50,,. .
r _ I
4 ----------------------------------------------------
----------- —
______________________________________________—___------------- -------------- ---------- ---C-----------.. 8' BLACK VINYL FENCE
k
-----------------------------------------------------------
----------- ------------- ---------- ---------
-----------
------------
,
OVERHEAD ELECTRICAL AND TELEPHONE ' ..
r
I
1
-------------------------- --------- ("
8' BLACK \'iNS'L FENCE i -------
,POLE WITH 3 -POLE GANG OPERATED UTILITY A.C. DISCONNECT
------
'r•" PROPOSED POLE WITH PRIMARY METER AND CUTOUTS -
a
I 's�
EI'ILE CORY
----------------------
GENERAL NOTES:
ALL DESIGNS ARE SUBJECT TO FINAL
STRUCTURAL ANALYSIS AND
CONSTRUCTION LAYOUT
ALL MOUNTINGS, INVERTERS AND
RACKING SYSTEMS ARE SUBJECT TO
CHANGE TO AN "OR EQUAL"
MANUFACTURER IN ORDER TO
ACCOMMODATE THE SUGGESTED
CONSTRUCTION SCHEDULE
180° FROM NORTH
- 2,970 SUNTECH STP290-24ND PANELS
- 300 PITCH ON SCHLETTER
FS -2V MOUNT
- 861,300 WATTS
COORDINATES: 41°40'26.54"N, 70°14'41.8211W
PV ARRAY ACREAGE: 3.21 ACRES
TREE ACREAGE REMOVAL SHADED IN
GREEN (REPRESENTS A +/- 150' TO
PREVENT SHADING): 2.82 ACRES
TOTAL TREE ACREAGE REMOVAL:
3.98 ACRES
9
REVISED LAYOUT
09-06-13
8
REVISED LAYOUT
08-06-13
7
REVISED LAYOUT
04-17-13
6
REVISED LANDSCAPING
04-04-13
5
REVISED LAYOUT BACKROUND
03-29-13
4
ADDED BERM DETAIL
03-26-13
3
GENERAL REVISION
11-27-12
2
GENERAL REVISION
05-01-12
1
GENERAL REVISION
02-08-12
REVISIONS:
N
OF Aqt.
W E a� R i06
Gam`
FARRIER
&303&d
q
9TE
BROADWAY ELECTRICAL CO. INC.
`+ 295 FREEPORT STREET
BOSTON, MA 02122
617-288-7900 FAX: 617-288-4169
Ci email: bwyCbroadelec.com
OWNER
BROADWAY
RENEWABLE
., STRATEGIELLC
S
STREVIEW€D FOR SUILDIN(S AND ZONING CODE COMPLI-
ANCE, ERRORS OR OMI'88IONS DO NOT RELIEVE THE
7
PROJECT:
5 TWO ROWS OF THUJA GREEN APPLICANT FROM THE RESPONSI6!LITY ILT' CVEC
' PARTIAL CLEARING ZONEI0' COMPLIANCE
t € - TREES REMOVED (CU' TO GRADE) ARBORVITAE 6' - 8' TALL, SPACED DATE: DENNIS-YARMOUTH
- EXISTING VEGETAT I IN LESS 10' APART ALONG FENCE LINE
DISTRICT THAN 8 FT. TO REM,IN AS IS . _... .. ..... _ SCHOOL DISTRICT
BUI DING OFFICIAL
MARGUERITE
f
W-
I - SMALL SCHOOL
= -..
OTICH
DRAWING TITLE:
An as built plan must be
-' submitted to this department
prior PV SOLAR LAYOUT
or any fivr##I f 001`1*14d n.
p
^
. _ `.� f r • .: -
A44 DRAWING NUMBER:
tl .
JOB No: NSTAR 2168
n DATE: 10-28-11
_._
PV®
.: DRAWN BY: MID
CHECK BY: LAF
L
SCALE: 1:40