Loading...
HomeMy WebLinkAbout43 Route 6A - As Built (06)GENERAL NOTES 1- ALL WORK SHALL CONFORM TO: MSBC MASSACHUSETTS STATE BUILDING CODE ACI AMERICAN CONCRETE INSTITUTE CRSI CONCRETE REINFORCING STEEL INSTITUTE 2- ALL CONCRETE SHALL HAVE MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 4000 PSI. ALL CONCRETE SHALL CONTAIN 11" GRAVEL. ALL CONCRETE THAT IS EXPOSED TO FREEZING SHALL CONTAIN 6% AIR ENTRAINMENT. 3— THE CONTRACTOR SHALL NOT ADD MORE WATER TO THE CONCRETE MIX THAN PRESCRIBED BY THE MIX DESIGN. THE CONTRACTOR SHALL USE VIBRATORS TO CONSOLIDATE THE FRESHLY PLACED CONCRETE. 4- REINFORCING STEEL SHALL BE UNCOATED AND HAVE A MINIMUM YIELD STRENGTH OF 60 KSI. 5- A 6 MIL POLYETHELENE VAPOR BARRIER SHALL BE PLACED UNDER ALL INTERIOR SLABS PER MSBC 1905.1. 6- SOIL SHALL HAVE A MINIMUM BEARING CAPACITY OF 2 TSF. ALL BACKFILL SHALL BE GRANULAR MATERIAL THAT IS PACED AND COMPACTED IN 6" LIFTS. ALL SOIL SHALL BE PROOF ROLLED PRIOR TO FOOTING OR SLAB CONSTRUCTION. C�- 7— ALL FLOOR JOISTS SHALL BE 9"" AJS 20 JOISTS @ 16' SPACING. ALL JOISTS SHALL BE FLUSH FRAMED TO DOUBLE 131, VSL GIRTS. 8- SIMPSON CONNECTION HARDWARE: BC5 POST CAP FOR TOP OF 4x4 POSTS ITT39.5 JOIST HANGERS MIT49.5 DOUBLE VSL GIRT HANGERS 9- SEE ARCHITECTURAL DRAWING FOR ALL INSULATION DETAILS. 2x4 TREATED SILL J_ 8"MIN 8" WIDE x 3'-9" HIGH UNREINFORCED FOUNDATION WALL III 2"x8" EMBED ANCHOR BOLTS @ 6' MAX SPACING AND WITHIN 12" OF CORNERS Q4 MIL POLY VAPOR BARRIER -i 4" THICK UNREINFORCED CONCRETE FLOOR SLAB 8"x20" UNREINFORCED FOOTING J"x16" LONG DOWELS @ 18" SPACING SECT 3" CLEAR DOUBLE 92" VSL HEADER BILCO DOOR PER ARCH DRAWINGS GRAVEL BED AND PERFORATED PVC DRAIN PIPE PITCHED TO 1 SUMP HEIGHT OF 8" THICK WALLS TO SUIT 8" THICK UNREINFORCED CONCRETE FOUNDATION WALL 4" THICK UNREINFORCED CONCRETE FLOOR SLAB 8"x20" UNREINFORCED FOOTING 3" DIA CONC FILLED STEEL LALLY COLUMN j IlT8"x30"x30"FOUR $"x24" LONG COLUMN FOOTING REBAR EACH WAY SECTION TYPICAL AT ALL F COLUMN FOOTINGS 10" THICK FOUNDATION - WALL BEYOND SECTION �`J $" HOR REBAR PROVIDE 8"x18"x18'=— EL BARS AT ALL WALL CORNERS DETAIL G TYPICAL AT ALL CORNERS SIMPSON ITT 39.5 JOIST HANGER CONTINUOUS 2x4 TREATED SILL 4 MIL POLY VAPOR BARRIER INSTALL END JOIST TIGHT TO POCKET DRILL 2" DIA VENT HOLES IN MIDDLE OF WEB AT 32" SPACING EXTEND 4" T&G PLYWOOD SUBFLOOR TO WALL SHEATHING AS SHOWN-- 9"" AJS 20 = FLOOR JOIST @ 16" SPACING AJS BLOCKING PANEL @ 32" SPACING 2x4 TREATED SILL ANCHORED TO WALL WITH 1 O HILTI NAILS @ 24" SECT CAST 3""x9"" POCKET IN TOP OF FOUNDATION WALL AS SHOWN EXTEND 4" T&G PLYWOOD SUBFLOOR TO WALL i SHEATHING AS SHOWN 92" AJS 20 FLOOR JOIST @ --__ 16" SPACING 2x4 TREATED SILL ANCHORED TO WALL WITH 10d HILTI NAILS @ 24" 10" THICK CONCRETE WALL 2"CLEAR SIX $" HORIZONTAL REINFORCING BARS POSITIONED AS SHOWN $" VERTICAL REINFORCING RODS AT 10" SPACING BENT AS SHOWN 4" THICK UNREINFORCED CONCRETE SLAB 4 MIL POLY VAPOR BARRIER 2x6 TREATED SILL 2"x8" EMBED ANCHOR BOLTS @ 6' MAX SPACING AND WITHIN 12" OF CORNERS 2x6 TREATED SILL 8" MIN J J a DAMP f PROOFING z a 0 z 0 _-1 w IIT Ld C 0 �- C) 1. J"x16" LONG DOWELS TO MATCH VERT BARS 8"x24" UNREINFORCED' CONCRETE FOOTING GRAVEL BED AND PERFORATED PVC DRAIN PIPE PITCHED TO SUMP SECTION A tit W w d Lu Lu z Y 5 U z O w 2 U � U U � U W < U U) tf = 0- C c m O E L u) G o o N C6 c ca a m r r n vi C u i C to o >, = c a•+ °° a W N C'7 L d' t0 J DRAWN BY JCS SGALt 1 "=1'-0' 2 -13 -OF S-3 tf = 0- C c O L i C6 , v W R a Q C'7 d' DRAWN BY JCS SGALt 1 "=1'-0' 2 -13 -OF S-3