Loading...
HomeMy WebLinkAbout134.47.1 - Proposed Septic Design (2)LEGEND: EXISTING SPOT ELEVATION *0.0 EXISTING CONTOUR----00---- FINAL SPOT ELEVATION FINAL CONTOUR G SOIL TEST LOCATION UTILITY POLErQ, TOWN WATER -WSW CATCH BASIN GAS UNEC G CESSPOOL CLEANOUT - C.O. FA TOP CF FOUNDATION 99.IELEV. = 93_00 1 � 9 • 99.1 -------- i i 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM FROM SLAB OR CRAM_ SPACE CLEAN SAND CONCRETE COVERS 7iNSPECTION PORT 4" SCHEDULE 40 PVC PIPE LOAM AND SEED MIN. PITCH,1/8" PER FT. 2' LAYER OF 1/8" TO 1/2- 6 11 IA WASHED STONE / g rJO 4" CAST IRON PIPE 6 MAX. 6„ " 9200 MAX. VENT 96.3 rr - SCAB ELEV. _90.50 L Cl�� j(9�) `,n 31 8y . 94.6 LOi26 95.1= `- - LIQUID .! ! ! EP -.H 41,726.3 t SF. G 4 5 FEET 6 FEET 7 FEET 221'x- 8 FEET / 1500 GAT �K / SEP PC 0 / apl ECK g1, • 95.0 / � t o � / / ,, PROPOR10A� d BEOO90.4 gOiL PORCH / / or 90 ._ /-� LIMITRDIG r / SOIL r / TEST 2 94.8 \ / / 9 '�/ 11 •95.5,' / 9 3 // �� (OR EQUAL) MINIMUM HoRal TEXTURE COLOR MOTT. - 0-6 A LOAMY SAND 10YR2/1 80.75 AKIN• NOT REQUIRED - PITCH 1/4" PER FT. B LOAMY SAND 10YR64/3 1. ALL WORKMANSHIP AND MATERIALS SHALL ROOTS - C1 LOAMY SAND z BE BROUGHT TO 57 COBBLES 45-120 C2 FINE SAND 2.5Y6/4 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE 84-132 C4 COARSE SANDI 2.5Y6/4 FLOW LINE 89.00 a -ELN. F,?.50 10" -t - MN. 1 ELEV. 89.00 2p 0 LEVEL ° ° 0 t0• ° E_EV. _!'.,,Zra_ I GAS ELEV = 89 67 6" SUAAP ELEV. _ _F.8.50_ o = ._ .._.._ v� ° ELEV. _87_$7 i BAFFLE . ---- DISTPIBUTION ELEV. ! BOX _e�_ (TO BE:PLACED0"J FIRE+�BASE) TO BE WATER. TESTED (6 �1 H,IGH CAPAC/IYINF/L IRAIORS N^1N S70NE z_ 1500 GALLON IF MORE THAN ONE OUTLET lh' A.N N' X 43' X 10 ' lPfNCH FORYAPON � •27 (TO BE PLACED ON FIRM BASE) S01 ABSORPI om N WELL N A SEPTIC TANKZONE (70 TO 1 1/2' CLEAN $ I JTE[ i (SAS) INDEX DOUBLE WASHED STONE ADJUST FREE OF FINES & SILT USGS PROBABLE WATER TABLE ELEV. _ SE!"rAGE DISPOSAL SYSTEM STEM PPOs ry ILE OBSERVED WATER TABLE ( / / ) ELEV. = �_- NOT TO SCALE BOTTOM OF TEST HOLE ELEV. = SOL TEST NUMBER DESIGN CALCULATIONS BEDROOMSOF Y4_ DATE OF SOIL TEST APRIL 15_2 -ML_ GARBAGE DISPOSAL UNIT NO SOIL TEST DONE BY S4_EETSER ENGINEERING TOTAL ESTIMATED FLOW WITNESSED BY _Q,_ELA HjEaLY _`- ( 110 GAL/V'R./DAY X 4 BR.) --440_ GAL./DAY REQUIRED SEPTIC TANK CAPACITY -r°0_ GAL. 0"M1lAit�;`� HOLE 1 ELEV.=90 40 ACTUAL SIZE OF SEPTIC TANK 1500_ GAL. PERCOLATION RATE <2M!N./INCH AT 84 - INCHES SOIL CLASSIFICATION I DEPTH HoRal TEXTURE COLOR MOTT. OTHER 0-6 A LOAMY SAND 10YR2/1 626.33 X 0.74 ROOTS 6-14 B LOAMY SAND 10YR64/3 1. ALL WORKMANSHIP AND MATERIALS SHALL ROOTS 14-45 C1 LOAMY SAND IOYR5/8 BE BROUGHT TO 57 COBBLES 45-120 C2 FINE SAND 2.5Y6/4 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE DESIGN PERCOLATION RATE 5_5_ MIN./IN. EFFLUENT LOADING RATE 9,74- GAL./DAY/S.F. LEACHING AREA 621.33 SO. FT. (11X48)+(59X2X10/12) 10YR2/1 LEACHING CAPACITY (AREA X RATE) _45148 GAL./DAY 626.33 X 0.74 B LOAMY SAND RESERVE LEACHING CAPACITY 43._40 GAL./DAY NOTES: 24-40 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE, 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE, 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE -- - - - - - --"-USED -UNDER OR WITHIN 10 FT. OF DRIVES OR _PARKING AREAS. NO WATER ENCOU`:TERED AT 120" ELEV._ BO 49 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE, OMM- VA1104 HOLE 2 ELEV=91.90 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH PERCOLATION RATE _25L._2__ M!N./INCH IN C4 HORIZON DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. v DEPTH HORIZ TEXTURE I COLOR MOTT. I OTHER 0-8 A LOAMY SAND 10YR2/1 ROOTS B-24 B LOAMY SAND 10YR4/3 ROOTS 24-40 C1 LOAMY SAND 10YR5/8 SCALE 1 _ 20, 5`o COBBLES 40-65 C2 FINE SAND 2.5Y6/4 65-84 C3 SANDY LOAM 2.5Y5/3 LOCATION MAP 84-132 C4 COARSE SANDI 2.5Y6/4 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE.. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION IS TO BE BROUGHT TO THE ATTEN NOF THE DESIGN ENGINEER IMMEDIATELY. B. PARCEL IS IN FLOOD ZONE 0 9. LOT IS SHOWN ON ASSESSO _ MAP 134 AS PARCEL 47.1 10. ALL UNSUITABLE MATERIAL S.' _ E REK40VED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255:(3). 11. A NEGATIVE GRADE OF 3/4" PER FOOT AWAY FROM THE FOUNDATION SHALL BE MAINTAINED FOR A MINIMUM OF 15'. 12. A VARIANCE OF 6.8' IS REQUIRED FOR THE TOP OF. FOUNDATION TO BE LESS THAN 2' ABOVE THE HIGH POINT IN ROAD. NO WATER ENCOUNTERED AT _ 13?"_ ELEV. = _8_20 / 1 _ / 96.9 / /' /' • 103.4 A 102.83(✓ r TAvd \ 1 IJ"` .jj `p s 0-60 i`r`102.2 "1 /P� Za, / / I �1 ; t 6 mew ACW= lOLSO' APPROVED: BOARD OF HEALTH f 100.7 - • � DATE AGENT C. se 92`tiF �0 %�a%tr�' ROTE '6P � 200 �s�DA.TEJULY PROPOSED SEP i7C DESIGE � DL�MMOR 1 REMATY SUS LOC. V0 ROUE V ISO A26 YARMOU1 , MASS. S ,'2 51 R!-. EAT TEUn=RN , ! •s 508- P. O. BOX 713 398-3922 SOUTH DENNIS, MASS. 026E0 22, 2004 SCALE 1 _ 20, JOB NO. ,5747-00 REVISED LOCATION MAP REVISED S4'EET 1 1 OF 1 C. se