Loading...
HomeMy WebLinkAbout125 Pawkannawkut Drive Site Plan 2LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION o- 100 PROPOSED CC :TOUR 100 --- EXISTING CONTOUR 5. 98-391 6.3 6.3 ,+ 5.6 6.35.7 SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ) DESIGN FLOW: ?_ BEDROOMS ( 110 G1,D) = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD ( 2 ) = 660 USE A 1500 GALLON SEPTIC TANK LEACHING_ N/A SIDES: - BOTTOM: 30 x 15 (.74) = 333 TOTAL: 450 S.F. 333 _GPD USE 2 ROWS OF 4 STANDARD INFILTRf,TORS WITH 3' STONE AT SIDES -3.3' BETWEEN ROWS AND 2.5' AT ENDS BOARD OF HEALTH , MA APPROVED DATE FIRST FLOOR MIN, ELEV. 12.0' SYSTEM PROFILE -- , ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO 11.0' 10.6 MINIMUM .75' OF COVER OVER PRECAST r WITHIN '3" OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM c . RUN PIPE LEVEL 2" DOUBLE WASHED PEASTONE /FOR FIRST 2` PROPOSED 1500 . GALLON SEPTIC $.44' 71 LOT 7A N/F B. GREIG 7.2 EXISTING HOUSE 6.9 EXIST. DWELL TO BE 7� REMOVED AND DISPOSED 6.9 AT AN APPROVED SITE CE RPI 7.4 154 7.5 72 F6µCF�.6 7.2 .�� �T7' o RAIL_7 7.7 10.6' i 50 ' 6. 7.2 5.6 53 1 v 6 1 7� 1 -tri 1 O ,q , 1 i 7 1 CAR .3 \ 7.8 1 53'\ ��---PORCH LOT 5A 7.2 12.900 SFt /1 ' (UPLAND) 1C V, / 7 N1 x' y 7.5 0 Q5 SHED 7 EXISTING HOUSE LOT 5A N/.: W. DESTEFANO :.* _ SLOPE)BA FFLE MIN SLOPE)O' TEE 7 n„ INLLT U011II OUTLET DEPTH - 14" -- FOUNDATION- 14' SEPTIC TANK 12' D' BOX 9' "0 X 5' REMOVAL OF UNSUITABLE SOIL REQU' zED AROUND PERIMETER OF SYSTEM DOWN 0 Z SUITABLE SOIL LAYER. REPLACE WITH CLEAN MEDIUM SAND. ENGINEER TO INSPECT AND 6 2 CERTIFY REMOVAL + T C 6.i 7. ', (� ; PAVED -"'-- DRIVE 6.2I, (REMOVE) 41' PROP. CONCRETE RETAINING WALL AT ELEV. 8.5` 1� CID CD I u 6.Q �4 , 8 , ;�•, N H A 1, ,3-� WATER GATE 1 ELEV - 6.81' ----- l NGVD V, 643 1 PROPOSED DRIVEWAY ... 6.2.6.0' 6.4 11 Im Q 6.0} - PROP. DWELLING MIN. FIRST FLOOR ELEVATION = 12.0' 6 MIL POLY VIN([ A �ID MASTIC EL. 8.5' 1 10 ON INSIDE OF R= AIHING WALL (6) #3 BARS C )N'.. FOR HORIZONTAL Rf.lf FORCEMENT EL. 6.3' #3 BARS 16" O.C. FCR VERTICAL REINFORCEMENT 6" 4.3' E ``SE EL. SAND&GRAVEL FILL COMPACTED CONC. RET. WALL (NTS) ''79] .25' 1 0.75' MIN 7.5' LEACHING FACILITY x 5' x z a f c V 0 a USE ADJ. WATER ELEV. AT 2.5' (TIDALLY INFLUENCED) TEST HOLE LOGS ENGINEER: ARNE H. OJALA, PE WITNESS: AMY VON HONE, RS DATE: 3/3/99 PERC. RATE _ < Z MIN/INCH CLASS I SOILS P# ELEV. n" 1 6.4' 12" .. y, ur 1 IIN �\ ' �. SAND FILL 72" 03S. WATER 0.4` -. U PEAT t t, 120" OA11 JA lGGI411 No 2 01!% -3.6 C V°F MS 144" -5.6 PROP. DWELL. = 1778 SF (13.8% COVERAGE) WITH PROP. DECK = 439 SF (17.1% COVERAGE) EXIST DWELL. = 1929 SF (14.9% COVERAGE) WITH EXIST. PATIO = 408 SF (18.1% COVERAGE) L V V V 6.l 1.11 11 SCALE: NTS ASSESSORS MAP 25 PARCEL 28 ZONING DISTRICT: R-25 YARD SETBACKS: FRONT = 30' SIDE = 15' REAR = 20' PLAN REF. - FLOOD ZONE: Al2 ELEV. 12 NOTES: 1. DATUM IS NGVD 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9, COMPONENTS NOT TO'BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR 11. PUMP AND REMOVE EXISTING SEPTIC SYSTEM 12. DRYWELLS/TRENCHES REQUIRED FOR ROOF RUN-OFF SITE PLAN OF #125 PAWKANNAWKUT DRIVE IN THE TOWN OF: (SOUTH) YARMOUTH PREPARED FOR: BONNIE BROWNING 20 0 20 40 60 SCALE: 1" = 20' DATE: JUNE 21, 2001 REV 3/25/02 (HSE) off 508-362-4541 lux 508 362-98W I down cape engineering, inc. CIVIL ENGINEERS LAND STJRVEYORS 939 main st. yarmouth, ma 02675 N o �4Y�Ir:ttylj\t y, ur 1 IIN �\ ' ANNE H.H. 4� U �c"i OJA I_A `•� t t, OA11 JA lGGI411 No 2 01!% No. 3 192: REQUIRED INSPECTIONS AND CERTIFICATIONS V°F �//�/0Z-, 1. ENGINEER SHALL INSPECT WHEN REQUIRED EXCAVATION IS Al L.S. DATE COMPLETE. 2. ENGINEER SHALL STAKE FOOTING PRIOR TO POURING 3. ENGINEER SHALL INSPECT FOOTING AND REBAR PRIOR TO PO'U?'NG OF WALL 4. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS BEEN PROPEtLY " DEPOSITED 5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS AFTER INSTALLATION ENGINEER SHALL CERTIFY TO YARMOUTH HEALTH DEPARTMENT VAT THE RETAINING WALL AND SEPTIC SYSTEM HAVE BEEN INSTALLED IN SUBSTANTIAL COMPLIANCE WITH THE APPROV':r) PLAN. off 508-362-4541 lux 508 362-98W I down cape engineering, inc. CIVIL ENGINEERS LAND STJRVEYORS 939 main st. yarmouth, ma 02675 t t, off 508-362-4541 lux 508 362-98W I down cape engineering, inc. CIVIL ENGINEERS LAND STJRVEYORS 939 main st. yarmouth, ma 02675