Loading...
HomeMy WebLinkAbout125 Pawkannawkut Drive Site Plan 3-LEGEND 100.0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 100 ---- EXISTING CONTOUR :! 1 98-391 6.3 6.3 5.6 6.35.7 SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED DESIGN FLOW: 3- BEDROOMS ( 1110 GPD) = 330 GPD USE A 330 GPD DESIGN FLOW DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 SEPTIC TANK: 330 GpD (2_) = 660 USE A 1500 GALLON SEPTIC TANK LEACHING: HORIZONTAL RE_IVFORCEMENT 2, ENGINEER SHALL STAKE FOOTING PRIOR TO POURING NTS �• N/A 1t 3.2 `.. 2 SIDES: OF WALL FROM BOARD OF HEALTH, 10, BOTTOM: 30 x 15 (.74) = 333 DEPOSITED 5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS TOTAL: 450 S.F. 333 GPD USE 2 ROWS OF 4 STANDARD INFILTRATORS WITH 3' STONE AT SIDES, 3.3' BETWEEN ROWS AND 2.5' AT ENDS BOARD OF HEALTH , MA APPROVED DATE LOT 7A N/F B. GREIG 7.2 EXISTING HOUSE 6 EXIST. DWELL. TO BE 7' REMOVED AND DISPOSED AT AN APPROVED SITE 6.9 F CE 7.4 RAt 154 7.5 72 o.' 7.2 0� RA11. FENCE6.6 7 7.7 x '• � 11 50 , 7.2� 5.6 5J. 1 v 1 7. S 1 -- m�- " 1 53' I \`` 7.8 - SCR. GAR PORCH 1 LOT 5A 7. 12,900 ) ( 1 (UPLAND) FENCE 7.4 / 7 x / QFj't SHED o 7 7. LOT 5A N/F W. DESTEFANO FIRST FLOOR MIN. ELEV. 12.0' SYSTEM PPOFILE -, ACCESS COVER TO WITHIN 6" OF FIN. GRADE (+)OT'0 SCALE) ACCESS COVER (WATERTIGHT) TO • 11.0 14.6 MINIMUM .75' OF COVER OVER PRECAST WITHIN 6' OF FIN. G'L?.QE , 9.25' - 29. SLOPE REQUIRED OVER SYSTEM e RUN ?(PE LEVEL2" DOUBLE WASHED PEASTONE 9.4't FOR I IRST 2' 0.75' MIN PROPOSEO 1500 - 8.5 GALLON SEPTIC-Af g,44' 8.69' TANK (H- 10 ) GAS 8.08 o , Mw 8AFFLE 8.32' 15' MIN ( 2 % SLOPE) \__6" CRUSHED STONE OR MECHANICAL � ' Ad COMPACTION. (15.221 [23) DEPTH OF FLOW 4 ( Z SLOPE) SL')PE) TEE SIZES: 3/4" TO 1 1/2" DOUBLE WASHED STONE INLET DEPTH = 10" OUTLET DEI'>TH a 14" .. . 7.5 LEACHING FOUNDATION- 14' SEPTIC TANK 12' - D' BOX 9' FACILITY I D x � c 0 z USE ADJ. WATER ELEV. AT 2.5' (TIDALLY INFLUENCED) 5' REMOVAL + OF UNSUITABLE SOIL REQUIPED Z AROUND PERIMETER OF SYSTEM DOWN TO Z SUITABLE SOIL LAYER. REPLACE W?TH CLEAN MEDIUM SAND. ENGINEER TO INSPECT AND CERTIFY REMOVAL + C i, , 1 6.1 7. !, C PN,fED 6 27 y'r DRIVE (REMOVE) 1' -PROP. CONCRETE RETAINING WALL AT ELEV. 8.5' t , 3�11 1 ,•b -"F-- WATER GATE ELEV NGVD 6^� -------------------- PROPOSED DRIVEWAY , 6.2 - TQ 6.4, 6.9 i i ' 6Q N PROP. DWELLING 7.5 MIN. FIRST FLOOR ELEVATION = 12.0' I EXISTING HOUSE 6.9 TEST HOLE LOGS ENGINEER: ARNE H. OJALA, PE WITNESS: AMY VON HONE, RS DATE: 3/3/99 PERC. RATE _ < 2 MIN/INCH CLASS I SOILS P# ELEV. 1 6.4' LOAM FILL 12" PROP. DWELL. = 1778 SF (13.8% COVERAGE) WITH PROP. DECK = 439 SF (17.1% COVERAGE) EXIST DWELL. = 1929 SF (14.9% COVERAGE) WITH EXIST. PATIO = 408 SF (18.1% COVERAGE) SAND FILL 72 OBS. WATER - 0.4' PEAT 120" 1 -3.6' C MS 144" 1 -5.6' 6. NOTES; 1. DATUM IS NGVD 6 MIL POLY VINYL AND MASTIC MUNICIPAL WATER IS AVAILABLE EL. 8.5' ! 1011 - ON INSIDE OF RETAINING WALL x DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 LEWIS REQUIRED INSPECTIONS AND CERTIFICATIONS POND CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. 1. ENGINEER SHALL INSPECT WHEN REQUIRED EXCAVATION IS - j (6) #3 BARS CONT. FOR COMPLETE. LOCUS HORIZONTAL RE_IVFORCEMENT 2, ENGINEER SHALL STAKE FOOTING PRIOR TO POURING NTS �• 3. ENGINEER SHALL INSPECT FOOTING AND REBAR PRIOR TO POURING 1t 3.2 `.. 2 EL. 6.3' OF WALL FROM BOARD OF HEALTH, 10, 4. ENGINEER SHALL INSPECT WHEN CLEAN FILL HAS BEEN PROPERLY # 3 BARS 16" O.0 FOR VERTICAL DEPOSITED 5. ENGINEER SHALL INSPECT AND CERTIFY SEPTIC COMPONENTS TO COMMENCEMENT OF WORv. REINFORCEMENT AFTER INSTALLATION 12. ? ENGINEER SHALL CERTIFY TO YARMOUTH HEALTH DEPARTMENT THAT THE RETAINING WALL AND SEPTIC SYSTEM HAVE 6" BEEN INSTALLED IN SUBSTANTIAL COMPLIANCE WITH THE APPROVED PLAN. 4.3' BASE EL. - SAND&GRAVEL FILL COMPACTED CONC. RET. WALL (NTS) ASSESSORS MAP 25 PARCEL 28 ZONING DISTRICT: R-25 YARD SETBACKS: FRONT = 30' SIDE = 15' REAR = 20' PLAN REF. - FLOOD ZONE: Al2 ELEV, 12 NOTES; 1. DATUM IS NGVD SPIE LOCUS MUNICIPAL WATER IS AVAILABLE � I 1 x DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 LEWIS SOUND POND CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. NANTUCKET 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE LOCUS MAP SCALE: NTS 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT ASSESSORS MAP 25 PARCEL 28 ZONING DISTRICT: R-25 YARD SETBACKS: FRONT = 30' SIDE = 15' REAR = 20' PLAN REF. - FLOOD ZONE: Al2 ELEV, 12 SITE PLAN OF #125 PAWKANNAWKUT DRIVE IN THE TOWN OF: (SOUTH) YARMOUTH PREPARED FOR: BONNIE BROWNING 20 p 20 40 60 SCALE: 1" = 20' DATE: JUNE 21, 2001 REV 3/25/02 (HSE) 11t 0{ $o ARNE �G 7So� ARNE H. yG WA' A Ty.' Y OJALA r`, CIVI i, No. Zr 34A oT 792 3f qF No. ' T, 4[ LAN, SS70NG� ARNE H. OJAL , P.L.S. DATE off 508-362-4591 fax 506 362-9680 I down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675 NOTES; 1. DATUM IS NGVD 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH, 10, CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE I0CATION OF ALL UNDERCRCJND & OVERHEAD L,TiUTiES PRIOR TO COMMENCEMENT OF WORv. 11. PUMP AND REMOVE EXISTING SEPTIC SYSTEM 12. DRYWELLS/TRENCHES REQUIRED FOR ROOF RUN-OFF SITE PLAN OF #125 PAWKANNAWKUT DRIVE IN THE TOWN OF: (SOUTH) YARMOUTH PREPARED FOR: BONNIE BROWNING 20 p 20 40 60 SCALE: 1" = 20' DATE: JUNE 21, 2001 REV 3/25/02 (HSE) 11t 0{ $o ARNE �G 7So� ARNE H. yG WA' A Ty.' Y OJALA r`, CIVI i, No. Zr 34A oT 792 3f qF No. ' T, 4[ LAN, SS70NG� ARNE H. OJAL , P.L.S. DATE off 508-362-4591 fax 506 362-9680 I down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675