Loading...
HomeMy WebLinkAbout188 Pawkannawkut Drive Sewage Disposal System DesignSOIL TEST PIT DATA: 11/22/99 SEPTIC TANK DETAIL: 1,500 GALLON DISTRIBUTION BOX DETAIL: NOT TO SCALE SOIL ABSORPTION SYST M I� I NOT TO SCALE GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE NOT TO SCALE NO. OF OUTLETS: cJ I 30'1 PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL. TEST PIT #5 TEST PIT #6 5.8' 5.4' EL. GRD. EL, NOTES: 1. SEPTIC TANK SHALL BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, CNF SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. REINFORCED CON FINISHED GRADE 00 0 000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 o 0 0 0° °0° °0 °° PASS No. 50 SIEVE °o° o°o GIRD. GW. EL. 2.5' ADJ. GW. EL 2.5' ADJ WITH . 2. SEPTIC TANK TO WITHSTAND H-10 LOADING TEES TO BE CENTERED UNDER MANHOLE COVER. TAN UNLESS UNDER. DRIVES20 REMOVABLE I-� 2• WALLS NOTES: OVERI I ° ° ° 4 UNI 0°0 C oo T IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- 0 " LOAMY SAND 1.5Y 2/1 0 " LOAMY SAND 10YR 2/1 i 814"LOAMY TRAVELED WAYS, WHEREIN'H LOADING . ,,y •.,y ; , 1. DIST. BOX TO WITHSTAND H-10 LOADING a EXISTING U71UTY SYSTEM IN SERVICE. S THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 50" 1 ' E SAND 2.5YR 5/1 1' E 13" LOAMY SAND 2.5YR 5/1 1 E SAND 10YR 5/6 SHALL APPLY. 3. ALL PIPE CONNECTIONS AND CONCRETE 2-24" DIA CONCRETE MANHOLE CONSTRUCTION SHALL BE WATERTIGHT. y;,y t t;,y PVC g,� UNLESS UNDER PAVEMENT, DRIVES OR T TRAVELED WAYS WHEREIN H-20 LOADING 4" PVC o PIPE o° TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, tL °° ct 0 i TO THE START OF CONSTRUCTION. 0 o 0 0 0 B LOAMY SAND 10YR 5/6 B "LOAMY 2 2 29 COVERS WITH METAL HANDLES BROUGHT I_ SHALL APPLY. 1 °o0 0 0 00 0 0. 0 0 0 0 0 0 0 0 ° O n o 0 0 0 0 0 0 0 a 0 0 0 0 0 ] EL = 3.0 - 33" - -33" 4. FILL ALL UNUSED KNOCKOUTS WITH TO 6" FROM FINISH GRADE MORTAR. T 15 0 0 0 0 0 0 657 ROUTE 28, (UNIT 6) WEST YARMOUTH, MA 02673 (508) 778-8919 3' EL = 3.0'_ 3 h 6" !' 8" 2. PROVIDE INLET TEE OR BAFFLE WHERE OUTLETS 1 35' 88 - PAWKANNAWKUT DRIVE S. OUTH - //x /� 1 rr TEE TO BE UNDER .,,5 +. y.... SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR 'e•=e°"arte'ra PLAN MEW - A PI og CIVIL y HAM aEU PREPARED FOR: V/210 -L 4, MED SAND 10YR 6/6 4' MED SAND 10YR 6 6 C / M.H. OPENING 12 MIN, - 3" COVERN• ret< no°' •Q arae+ o 'r IN PUMPED SYSTEM. �$ o � L MASSACHUSETTS S DATE: JULY 12, 2000 COMP, DESIGN: K. HEALY CHECK: D. CRISPIN C 5' 1 5' 1 -_ 66" __ 64" RAISE M.H W� 4" 10'-6' SEWER BRICK - - ' ' <e'` �' ` 2" 3. FIRST TWO FEET OF PIPE OUT OF DIST. � BOTTOM 0 LEVEL/ ---,O BOTTOM STABLE BASE L 6" MIN. 3/4" TO BOX TO BE LAIC LEVEL 1 1/2' CRUSHED LOAM &SEED DIST /l// RB /// AREAS '11117777777777777 6' 6' 10'-0' do MORTAR 12' CROSS-SECTION STONE BASE 4. ALL PIPE CON D CONCRETE 3' MAX. C MPACTED FILL, 36" MAXIMLJ 2"MI 1MUM NORMAL WATER LEVEL CON8 SHALL BE C2 8, C2 PRECAST SEPTIC TANK 10 3` 14• .. INLET TEF 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. T30 0° ° ° °ODppO DENISITY GH o 0 �o 0° 000 3" YER g' MED SAND tOYR 6/2 9' MED SAND 10YR 6/2 �- a 4'-9` W-2' 4'-6" :� 5'-4` 4'-0" MIN- w s� ow e• C 1/2' 15 1/2" 30" OQ 24" 000POLYETHYLENE EFFEC. CO O INFILTRATOR 305 I 0 0 0 O REMOVEPEASTONE UNSUITABLE MATERIAL FOR INDICATES 10' 10 120" - - _ nET TEE z ='I LIQUID DEPTH 'S CO„ e V-6' DEPTH 1 0 LEACHING tJ0 CHAMBER O O 5' A IF APPLICABLE AROUND 120" p_ OBSERVED EL = (-4.2r EL = (-4.6) PRECAST DIST. 1 `47" O �47" 11' 11' GROUND WATER :::. e- BOX- 3/4' 1 1/2- INDICATES` -d`'::. -B.+'..-:<-:.:: e�: :-: :'. e..�:-. Vie_:::e _ 50" WASH STONE ,2' 11 �- ESTIMATED BOTTOM ON LEVEL STABLE BASE s°"Pga 3- SEASONAL HIGH DATE: DATE: GROUND WATER 11/22/1999 11/22/1999 PLAN VIEW Ua 6" Mt N. 3/4' TO ��� CROSS-SECTION VIEW u�d� t 1/2` STONE 7 1/2 PLAN VIEW - C.B. OAK CROSS-SECTION OF HA BER TEST BY: TEST BY: INDICAT INC. THE BSC GROUP, INC. PERC. ES - ' y' ; i r THE BSC GROUP, �+�� A 12 ELEV 10' WITNESSED BY: Vr1TNESSED BY:,f� AMY VON HONE / KELDA WELSH AMY VON HONE / KELDA WELSH ,. Y ;'' ' j ��� ,, . DESIGN IT RIA: PERC. RATE: PERC. RATE: N/A MIN./INCH 2 MIN./INCH o�<v r / ,~--� �{ '. /<v \. 1,500 '' r �; �r / `, / GAL f rn DESIGN FLO INDICA" S SOIL EVALUATOR SOIL EVALUATOR UNSUITABLE MATERIAL / ��� PROPOSED q ,`�r ,� r / 0 OSED " •" SEPTIC ' 4, 4 PV / I C TANK i r "' /� 5 OM 4 BEDRO MS AT1 0G.P.B. D 440 G / P.D. MICHAEL PETRIN MICHAEL PETRIN ,'�'1 f' `` DWELLING ' / - / ' SOIL CLASS: SOIL CLASS: NOTE; r«« 1 1 TO THE PROXIMITY TO / ,d' i ��� ''7 T.O.F t 3. IMIT OF DUE TIDAL INFLUENCE HIGH o E' r' ;'" 0J ��-' DECK EXCAVATION • ^ '' . 1 BOX ; EE NOTES E "'-� "'' / REQUIRED S PTI ; TA K: L.,.A.R. L.T.A.P,. GROUND W9ATEREADJUSTMENT 4p� J, y� . -, h��`C' �`a r 5 & 6 440 X 200' = 880 G L. 0.74 G.P.D./SQ.FT. p 74 G.P.D./SQ.FT. TO BE SET AT 2.5' N.G. V.D. �� p r- �'� 66 v •9 J 20' i '� A, LOT Z /' o G MIN { TP 4 SEPTIC TAN P OVID D: = 1500 G L. DATUM: LA `✓ �. �� ) ARAGE '✓ "r 120E I VERTICAL DATUM: N.G.V.D. W v ,Q,040+S.F.-WETLAND. \\�"' ''42,240±' S.F. UPLAND 3t ; it - % I r SIZE OF LE CHI JG FACILITY REQUIRED BENCH MARK USED: TOWN OF YARMOUTH, MON. #8 6.29 N.G.V.D. 48,2801 S. F. TOTAL AREA /` �r ,. _ Zvi �� "--.- B.H , x� 1 ��� DESIGN PERC. RA <2 MIN./ INCH BENCH MARK SET: TOP OF CONCRETE FOUND, ELEV. 5.92'. •. 11, >nWWnWWn .�/ ;:DR+RVEWAY :: I i� - Q i PROAO 3.7 S755gzp" \�ll['1 N. LONG TERM A CE RA 0.74 G.P.D S.F. PROFILE: NOT TO SCALE \ �- Sr<� t'��� W �'CoQ l I �`" j I ; o 1•�� SIZE OF LEP. HI G FACILITY PROVIDED: EL -A Ti1 TOP FOUNDATION COVERS TO WITHIN FIRST PIPE LENGT - C A t�S�NWNO p15 fURgAKCE 'OJT::. _ - -�� \.�� / ___ :-o: 42.0' _ '---_� °-' '� ,'.`. .:..: -..�.. - - :: O '' 6" OF FINISHED GRAD TO BE SET LEVEL i .� _ A$ r ♦��, 0 O ::::: EME S�- ; _ I P 1 EL= 5.0' FOR M. N. 2' _ r*i 440 GRD 0 74 PD/SF FINISH GRADE e I 1g MN I L.-tt.5 I - - -1 40.9' ,1' 31' P -3p �� ''- li ii ♦ :i:`1:ig` / j/ `� , 700 ,� LEACHING CHAMBER - - - f �� :.-:: :: �. �� -.. 1 i77,t 10 9 GRA 5.3 }! 5 D= O USE HIGH DE JSIT P❑LYETHYLEN L AC INC CHAMBERS sGH d 3:1 ERV}oUS :. .„ASEMENT� �\: /;,f f /2/?t;A 12'X2 X35' `'IDEWALLI = '(12'435') X 2 = 18 MAX .B 1=p rcl✓GWttY^ / -. jt 4 4, B❑TTDM 2' 35' = 42 .' 1=G eI=C 1-E DIST. BO ^') r -' ., 5' SEPERATION �< .. ;' Q O' `,. •�' : . ,!'� 1 .� - ``�♦. 1 608 S.F 608 S,r X 0, 4 Fi D/Sr = 450 1500 GALLON.. /r S ..: 80'+5'4 - 1 F PD SEPTIC TANK I s DRYV.'ELL FOR ♦t� �"' : 4r -___ 1 ��I� RD t 6' STONE BASE j ADJUSTED GROUNDWATER J ROOF RUNOFF �� i ` ♦N♦t �Qu vi 6.5 5 T_3 _ ROPOSEb r IS INVERT ELEVATIONS' Il.,ln n"+1 11 _ - - n6POSED ��1 ?18' - ��� c 39,9561 S. . 4 BEDROOM ,° ♦,•♦\N� DWELLING PR BEDROOM IT4 IEDROGM �3 0 0%0> UPLAN -..,LrO '_1/ +tDWELLING. LOC IN ORMATION a\Tu.0- ' f ._ • _ __ 0.8 DF 16.0'l { iO tnr", `_ BOX 51 N O CURRENT u"i ,,,. n. 3: „` CHANDLER BOSW O TH TOP OF FOUNDATION 16,0' A _ a ! ti' - '� ' --_ n "pt r 4" INVERT AT BUILDING 10.27 B ' v0 500 , Q , W,r t { r i' ^ - "' / r -`� GAL �A i GAL r k , 5.0 i a/ h �1 " SGP , DEED REFS EN! E: BOOK 10,389 PAGE I BOOK 12,466, PACE 024 014 4" INVERT AT SEPTIC TANK (IN) 10.07' C pV SEPTI ^ ��' / % I ,� , , ' 2 r U TAT' ' c? TANK ! ;", a PLAN REF REN :E: BOOK 181, PAGE 125 4" INVERT AT SEPTIC TANK OUT 9.82 D (OUT) i' �+ Q 5 6 4 '� r,o 4" INVERT AT DIST. BOX (IN) 9.72 E 2� / i I / N fl , ' 5' 4.7 70• /� , / x� ; r ; , 4.G BOOK 489, PAGE 7 4" INVERT AT DIST. BOX (OUT) 9.55' F y \ M,; n ° !c`' � +., ' f � ' �' i ' \ ; r r Q ' \. , r 85.3 ASSESSOR PA M CE �• 3: t9 39,40,4,.1,45.1 '' / Q i 20' ! ' y lam' ( r + TP 6 \\\ X' RESIDENTI Z VE: "R-25" INVERTS AT LEACHING FACILITY: ; , -�1 MIN __�: t ` ~i' p , t SE A CS: FRONT 30 4, '''`- __ , ��LIMIT OF �_, 1`t - o^ �~ �.<_ ' r PREVIOUSLY I SIDE 15' -a REAR 15 !IC �z rrII , 4" INVERT AT BEGINNING w OF LEACHING CHAMBER 9.5' G �Po EXCAVAMIT TION// HOUSE �� PERMITTED �`'� P' LIMIT tOF _ x_10 SEE NOTES -� AHOUSE it I �� /` 28' / "I^111�� �� MINIMUM .,U... LOT ZE: 5,000 S, �� II', 2 JA S u 1 1 4 20 ELEVATION AT BOTTOM EXCAVATIO L__-_ r 11.5 .YW.ELL FOR 5 & 6 '. r -`' SEE NOTES•`V + '`� • 0 RUNOFF -�0 •"• miklimUM F Ota ; GE: 'F^' ,,,u OF LEACHING CHAMBER 7.5 H OOF rn I , / 5 Fr:6 80.52 > ey 0 � DRYWFLL � R � %.�� � v> 0 N80*1" OF NOFF ' 4 - J , ROOF RU _ TE -IN• e, 1 i OVERLAY IS )ICT- NONE ADJUSTED C� /:/oc � r _ .._ _. _.. - -4 `,, - - j ESER Rq IE. __ '. I .�m �L 2.5 J d � ,..._ -. f , . ,_ �. G`�� - � � o, LOCUS ,N. N❑ SCALE .GROUNDWATER _ � ,. ,� _ L - , �_6 ' - VARIANCES REQUESTED' VAR Q 16 4 __ _ �` 1p'k 0' pRrMARY In ' i2 N 4.7 I' , S.A. - , DRYWELL FOR _�-"' NONE BENCHMARK -_____ O l ROOF RUNOFF - _ ! ♦ 11 n s / . 0 r LEGEND TOP OF CONCRETE o LI ,1 OFf1,500 r a 45.5' v BOUND, ELEVATION ., 20' � `� t 1 � � EX VATION GAL ♦ / 28 Ai"d TREET v 0o • NNOTES: = 5.92 N.G.V.D. SEE NOTES SEPTIGMIN> t !�♦r ' �� a�, 1 �, . PRE -CONSTRUCTION ;• a o? `.•� 79.5 m D D z 1.) EDGE OF BORDERING VEGETATIVE WETLANDS (BVW) DELINEATED BY NORMAN W. HAYES , PWS AND APPROVE BY THE YARMOUTH CONSERVATION COMMISSION AT A MEETING ON DECEMBER 2, 1999. 4.7 t! .� •5 & 6 TANK : _� Apt �,.♦ p .y ,t GRADE N80•15•41"p, �? t♦' - o r 2.) THE LOT SHOWN HEREON WAS CREATED VIA AN APPROVAL NOT REQUIRED (ANR) PLAN BY THE BSC GROUP INC. R POST ROUGH FLOOD ZONE .- �%0 1 9 � � x Il D N z _ SIGNED BY THE PLANNING BOARD ON MARCH 1, 2000. X 0.6 FILL GRADE Ail. ELEV 10' O t♦''� PROPOSED'. tt.6-tt� ♦`` z D m m 3 THE ENTRE LOT FALLS WITHIN THE FLOOD ZONE Al2, ELEVATION 1000' N.G v D tt♦t - 4 BEDROOM ', i tt♦/ ♦+` -�- PROPOSED FINISHED r' ' t�♦ DWELLING % tom'-' ��♦`` I^ N Z > I C m 4.) THE HOUSE IS SUBJECT TO FINAL ARCHITECTURAL DEIGN AND THE FOOTPRINT MAY VARY. GRADE tt jO�ARAGr- T.O.F 13.1' t�'� ♦``♦ `" LOCUS c DR• 5.) ADJACENT SITE FILLING IS UNDERSTOOD TO OCCUR PRIOR TO TRANSFER OF TITLE, THEREFORE NO FILL EASNENTS 3 4' 123 t 6t�tR U S• SN QR ARE REQUIRED. �Il�llall®Il�ll�lla 11 All-Ilall �Ilellall�ll U�11 ,� 1, ;..-..:-.: 11�11� O _ 6J BEFORE THE LOT IS FILLED THE AREA OF THE SEPTIC AND RESERVE IS TO RE EXCAVATED AND INSPECTED 3Y TH NOTE; 5 &-6. t 't t / BOARD OF HEALTH AND THE BSC GROUP, INC., THEN BACKFILLED WITH MATERIALS NOTED IN GENERAL o _ 7.) SITE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE ORDER OF CONDITIONS ISSUED FOR LOT 3 BY THE YARMOUTH CONSERVATION COMMISSION ON AUGUST 3, 2000. � - SCALE 20 FEET - ¢ / ♦ `♦`'. / R VER -EA BSC to: 8.) DRYWELL LOCATIONS SHOWN ON THIS PLAN ARE APPROXIMATE. SIZE AND ELEVATION OF EACH DRYWELL 0 10 20 40 FT. N ! / ti`•:: - / TO BE D£TERM,NED BASED ON ACTUAL HOUSE DIMENSIONS. a : ., �LOOD`ZONE DRY'4I FOR /' j�j' _y ♦ i �,.,. ,„e,i�"rr- ELEV lO' it N NANTUCKET N E SOUND , - -- - REVISIONS NO. DATE DESCRIPTION 1. 8/16/00 B.O.H. ISSUE 2. 12/11/00 B.O.H. COMMENTS 3. 11/20/01 & REVISE GRADING 4. 1/12/02 BLD. INSP. REQ. GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 4D OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL. 6. REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FOLLOW -I-.0 SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 'a OF No. 4 SIEVE" SHALL PASS No. 100 <,, % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT G" No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING U71UTY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL 1-808-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 7 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARRAGF GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING FACILITY. , ,The BSC Group, Inc. m � 1 657 ROUTE 28, (UNIT 6) WEST YARMOUTH, MA 02673 (508) 778-8919 PROJECT TITLE: SEWAGE DISPOSAL SYSTEM DESIGN l LOT 3 88 - PAWKANNAWKUT DRIVE S. OUTH aL�OF, �y6 LISA A MAC()ONALD og CIVIL y 40134 p '°'po FGr5TER6��"� v �Cfr PREPARED FOR: V/210 -L THOMAS & DONNA FLYNN 4 LORI COURT PI 1 TSFiELD MASSACHUSETTS 01201 DATE: JULY 12, 2000 COMP, DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: K. HEALY FIELD: P.H. / A.D. FILE NO. 4818800/8188SEP1.DWG DWG NO. 5179-12 SHEET 1 017 t JOB N0. 4-8183.01