Loading...
HomeMy WebLinkAbout10 Pine Grove Cemetary Site PlansTOP OF FOUNDATION HORIZiE 10 FT. 1tiN11RUy FROM WOR CRAWL SPACE CLEAN SAND MOTT. OTHER � 101,2 10 FT. MINIIUTA yr. R - CONCRETE LOAM AND SEED COVERS 4• SCHEDULE 40 PVC PIPE Y LAYER OF YIN. PITCH 1/B• PER <"f. 1/8' TO 1/2• �33 r� WASHED STONE IFI YA/L N TTREQUIRED 4• CAST IRON PIPE z 1 CU. FT. OF (OR EQUAL) MINIMUM 3 CONCRETE PITON 1/4• PER FT. y 90 ANCHOR - FLOW LINE 10*dELEV. MIN. 7 L�0�•L • ELEV_ cIJ.0 ��o• 7 •10• :.3 e o ` = c%K S t / -7. ELEV GAS FI EV. - �ia•9 6• SU P ELEV. n J o� il J • o ECrI ELEV.: eAFFLE DISTRIBUTION EJEV. y HIGH caPASM W ATNATORS WITH °� __ BOX 6•� z QUID OUTLET (TO BE PLACED ON FIRM BASE) TO BE WATER TESTED t t X % `3 TRENCH FORMATION s FEET 14 INCHES 19 INCHES 5OO GALLON IF MORE THAN ONE OUTLET (TQ BE PLACED ON FIRM BASE) SOIL ABSORPTION WELL ZONE 7 29INCHSS �aiES SEPTIC TANK 3/4' TO 1 1/2• CLEAN SYSTEM (SAS) tNDJU Ap,Lt15T 6 � DOUBLE WASHED STONE FREE OF FINES a SILT USGS PROBABLE WATER TABLE ELEV- SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATERTABLE (� T/EST /HOLE EEIEV- -8zs�- NOT TO SCALE AR K 3 ,,Ar �K �,��.00 {� r •4 \6 /' 3 c � , ��5ft v 15 iI �r Vi \ � L CA ad' ov I Io p P� fop of STIFKe- {jke t SOIL TEST DATE OF SOIL TEST .1406UST !LP -2. D SOIL TEST DONE By EB�N.Sr1ZfEE81f1.G WITNESSED BY 99.6 OBSERVATION HOLE 2 ELEV.- 59'�� OBSERVATION HOLE T- ocorry arms RSTF 4;% — MIN./INCH AT ._./10— INCHES PERCOLATION RATE —. --r1-- MIN./1NCH AT _-&Y— INCHES DEPTH HORIZiE COLOR MOTT. LOR MOTT. OTHER 0 �oyRaJ�y/bY�G/��rE,�,5yogj� R R IYRl �33 33 YA/L ,y AJO WATER ENCOUNTERED AT ELEV. - LEGEND: EXISTING SPOT ELEVATION OOxO E)aSTNG CONTOUR----00---- FINAL SPOT ELEVATION 0. FINAL CONTOUR ® SOIL TEST LOCATION she UTILITY POLE -0- TOWN WATER —W"� CATCH BASH GAS UNE CLEAN OUT C.8 CESSPOOL C.P. T "0 WATER ENCOUNTERED AT /•22ELEV. DESIGN CALCULATIONS NUMBER OF BEDROOMS 0 GARBAGE DISPOSAL UNIT —�— TOTAL ESTIMATED /n �r x 4L BR.1 AyVQ GAL/DAY L PARCEL IS IN FLOOD ZONE L �pI s• I 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL -/;Z�?_' •' ----� REVISED T. 0. D13, 5 APPROVED: BOARD OF HEALTH K1 gt9 IL AGENT DATE PROPOSED SEPTIC DESIGN FOR �p,rr/AL[7 �v�l��va •. PRO ECT LOCATION L bT I /D DFF S7gTioy Acle, So. yAR�La�3" - SOUTH DE 15, MASS. 02660 J I� j�L 398 3922 �J SCALE °A.SE r PrEHtmR 7.2000 1 0'2 d s Moe No. y9D9-DD PO I —� SHEET / OF LOCATION MAr i 02000 SYtEETSER ENGINEERING MIT-i E COLOR MOTT. OTHER �oyRaJ�y/bY�G/��rE,�,5yogj� "0 WATER ENCOUNTERED AT /•22ELEV. DESIGN CALCULATIONS NUMBER OF BEDROOMS 0 GARBAGE DISPOSAL UNIT —�— TOTAL ESTIMATED /n �r x 4L BR.1 AyVQ GAL/DAY L PARCEL IS IN FLOOD ZONE L �pI s• I 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL -/;Z�?_' •' ----� REVISED T. 0. D13, 5 APPROVED: BOARD OF HEALTH K1 gt9 IL AGENT DATE PROPOSED SEPTIC DESIGN FOR �p,rr/AL[7 �v�l��va •. PRO ECT LOCATION L bT I /D DFF S7gTioy Acle, So. yAR�La�3" - SOUTH DE 15, MASS. 02660 J I� j�L 398 3922 �J SCALE °A.SE r PrEHtmR 7.2000 1 0'2 d s Moe No. y9D9-DD PO I —� SHEET / OF LOCATION MAr i 02000 SYtEETSER ENGINEERING MIT-i