Loading...
HomeMy WebLinkAbout34 Pine Street Title 5 Site PlanTOP AT EL. 52.6' SYSTEM PROFILE ACCESS COVER TO WITHIN 6- 12F FIN; GRABE <NDT To- SCALD % ACCESS COVER (WATERTIGHT) TO MINIMUM 75` OF COVER OVER' / T 50.0 ---LOT% (EXIST) PROPOSED1,500 / GALLON. SEPTLC 48.0' TANK (H- 10 ) GAS BAFFLE 47.38'•7.21' YIN ( 2 % SLOPE) �_6' CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 C23) DEPTH OF FLOW = 4' (-2-'/ SLOPE) (-L-;' SLOPE) TEE SIZES INLET DEPTH = 10" OUTLET DEPTH 14" .. FOUNDATION- 30' - SEPTIC TANK 19' 01-240 2' S8 14' 3/4' TO 1 1/2' DOUBLE WASHED STONE D' BOX 3 LEACHING FACILITY ,-49.9 --- + 50.0 /cle 50.4 BENCH MARK CTR. OF C.SASIN () ELEV. = 49.8 (ASSMD QUAD) n IE�lsu tf3 13 D. FLA,j1GA4 AT 5 {'ce, $ \ M. joALMv_P l S INSTV0 � ` 50.5 V P.a TO / LOT- 4 23,302± Q. FT. / 0.53± CRIES /+ EXIST. DWELL. / G / G,p �F 50.9 �', _ R �� Oli)/ 51.6 + 48.1 9 51.0 50.4 g0' ' A9�+-,3 b8 / 45.0 a3 a a5.0 \ a +4 . 1& + 45.3 99 rn + 45.7 +4 y Ot a O0. 4 48 + 49. + 50.6 47.7' 0 TEST HOLE LOGS ENGINEER: RICK JUDD, RS PRECAST WITHIN 6 OF FIN. GRADE 2% SLOPE REQUIRED OVER SYS EM DATE: 10/3/01 PERC. RATE _ < 2 MIN/INCH I CLASS SOILS P# RUN PIPE LEVEL 2' DOUBLE WASHED PI / .. � SL 5" ICYR 4/2 F06t FIRST 2'. LFS 50.0 ---LOT% (EXIST) PROPOSED1,500 / GALLON. SEPTLC 48.0' TANK (H- 10 ) GAS BAFFLE 47.38'•7.21' YIN ( 2 % SLOPE) �_6' CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 C23) DEPTH OF FLOW = 4' (-2-'/ SLOPE) (-L-;' SLOPE) TEE SIZES INLET DEPTH = 10" OUTLET DEPTH 14" .. FOUNDATION- 30' - SEPTIC TANK 19' 01-240 2' S8 14' 3/4' TO 1 1/2' DOUBLE WASHED STONE D' BOX 3 LEACHING FACILITY ,-49.9 --- + 50.0 /cle 50.4 BENCH MARK CTR. OF C.SASIN () ELEV. = 49.8 (ASSMD QUAD) n IE�lsu tf3 13 D. FLA,j1GA4 AT 5 {'ce, $ \ M. joALMv_P l S INSTV0 � ` 50.5 V P.a TO / LOT- 4 23,302± Q. FT. / 0.53± CRIES /+ EXIST. DWELL. / G / G,p �F 50.9 �', _ R �� Oli)/ 51.6 + 48.1 9 51.0 50.4 g0' ' A9�+-,3 b8 / 45.0 a3 a a5.0 \ a +4 . 1& + 45.3 99 rn + 45.7 +4 y Ot a O0. 4 48 + 49. + 50.6 47.7' 0 TEST HOLE LOGS ENGINEER: RICK JUDD, RS AMY VON HONE, RS WITNESS: DATE: 10/3/01 PERC. RATE _ < 2 MIN/INCH I CLASS SOILS P# ELEV. 2_ 0" 54-. Ap SL 5" ICYR 4/2 Bw 5' LFS 10YR 6/6 32„ 47.5' h I LOCUS sl®L LOCATION MAP NTS ASSESSORS MAP 123 PARCEL 145 EL. 40.2' C LMS 70% GRAVEL D U QQZ �1 5 2 1v / 1OYR 6/8 120" 40_2' NO WATER ENCOUNTERED NOTES: SEPTIC DESIGN: <GARBAGE DISPOSER IS NOT ALLOWED ) 1. DATUM IS APPROXIMATED FROM QUAD DESIGN 'FLOW: _3- BEDROOMS (110 GPD) = 330 GPD 2. MUNICIPAL WATER IS EXISTING USE A 330 GPD DESIGN FLOW 3. MINIMUM PIPE PITCH TO BE 1/8' PER FOOT. SEPTIC (TANK: 330 GPD ( 2 ) = 660 4. DESIGN LOMIDII'iG r-urc rLL PREC,iST UNITS TO BE A"I'SHO" 2' 5. PIPE JOINTS TO BE MADE WATERTIGHT. USE A 7500 GALLON SEPTIC TANK 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, LEACHIN ENVIRONMENTAL CODE TITLE V. 2(30 + 983) 2 (.74) = 118 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT SID_SI, TO BE USED FOR ANY OTHER PURPOSE. - x .(.) = 218 BOTTOM: 30 983 74 8, PIPE FOR SEPTIC SYSTEM TO SCH, 40-4' PVC, TOTAL; 454 S.F. 336 GPD 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT 4 HIGH CAPACITY INFILTRATORS WITH 3.5' INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED USE L FROM BOARD OF HEALTH. STONE SAT SIDES, 2.5' AT ENDS AND 14" UNDER 10. PUMP & REMOVE (OR FILL W/CLEAN SAND) EXISTING SEPTIC SYSTEM LEGEND 100,0 PROPOSED SPOT ELEVATION 100x0 EXISTING SPOT ELEVATION 00 PROPOSED CONTOUR - 100 -EXISTING CONTOUR DATE BOARD OF HEALTH , MA OF 508-362-4541 Fax 508 362-9880 down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 ruin st, yarmouth, ma 02675 TITLE 5 SITE PLAN OF 34 PINE STREET IN THE TOWN OF: YARMOUTH(PORT) PREPARED FOR: MARJORIE PALMER[ 30 0 30 6,0 90 SCALE: 1" = 30' DATE: OCTOBER 10, 2001 ARNE H. OJALA, P.E., P.L.S. DATE