Loading...
HomeMy WebLinkAbout80 Pompano Road - Site & Sewage PlanT.O.F. AT EL. 56.5 SEPTIC PROFILE ACCESS COVER TO WITHIN 6" OF FIN. GRADE (NOT TO SCALE) ACCESS COVER (WATERTIGHT) TO 54WITHIN 6" OF FIN. GRADE.5 MINIMUM .75' OF COVER OVER PRECAST 5¢ 1• wI RUN PIPE LEVEL 52.5' %FOR FIRST 2' TEE 51.25'j2jjBAFFLE!50.67' 50.5' :•:' ' 02.5% SLOPE) �__6" CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [2]) DEPTH OF FLOW = 4_— (1 6 % SLOPE) TEE SIZES: INLET DEPTH = 10" OUTLET DEPTH = 14" FOUNDATION— 10' SEPTIC TANK LOT 2% SLOPE REQUIRED OVER SYSTEM 53.0' 2" DOUBLE WASHED PEASTONE 3/4" TO 1 1/2" DOUBLE WASHED STONE Z 2' D' BOX 6 1 LOT 53 OmPAIN \ NAIL BENCHMARK ELEV 50.0' IF RESERVE UTILIZED, ENGINEER TO INSPECT SOILS AND CHECK BREAKOUT ELEVATIONS (RE—GRADE IF NECESSARY) 98-257 N LEACHING FACILITY 3' MAX. 50.0' TEST HOLE LOGS ENGINEER: D.A. OJALA, SE WITNESS: AMY VON HONE, RS DATE: 7/22/98 PERC. RATE _ < 5 MIN PER INCH CLASS 1 SOILS P# N/A D SIDES ELEV. ELEV. o� 47.17'52.6' 0• Q 52_2' 0" A A LS LS 7" 1OYR 3/2 6" 10YR 3/2 LEGEND 100.0 PROPOSED SPOT ELEVATION 100xO EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 100 — EXISTING CONTOUR BOARD OF HEALTH 4 MA PROVED DATE off 508-362-4541 fax 508 362-9880 I down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675 SITE AND SEWAGE PLAN OF #80 POMPANO ROAD IN THE TOWN OF: YARMOUTH PREPARED FOR: BRIAN AND SUSAN INMAN 20 0 20 40 SCALE: 1" = 20' DATE: AUGUST 18, 1998 �N Of PTAH OF MRI 1- M ARNE s AW ARNE H. H c^ GALA S OJALA C""IL v No. 26348 oe N' D9k14 cm �s�Ory4f 'VP 21 ;? AL ARNE H. OJALA> E., P.L.S. DATE B B ASSESSORS MAP PARCEL LS LS ZONING DISTRICT: R-40 24" 1OYR 6/4 50.6' 24" 10YR 6/4 50.2' YARD SETBACKS: 6.97' FRONT = 30' Cl SIDE = 6'* Cl M/F REAR = 20' M.S. 72" 2.5Y 6/4 PLAN REF. —207/57 (1966) 40.2' top perc ®72" C2 FLOOD ZONE: C 2.5Y 7/4 LS * OWNER'S RESPONSIBILITY TO CONFIRM ZONING SETBACKS WITH 120" 2.5Y 6/4 TOWN OFFICIALS PRIOR TO BUILDING C3 MS 120" 42.6' 144" 2.5Y 6/4 40.2' NOTES: NO WATER FOUND NOT ALLOWED 1. DATUM IS APPROXIMATED FROM DENNIS QUAD SEPTIC DESIGN: (GARBAGE DISPOSER IS ) F ------. --.AVAp_ABI DESIGN FLOW: 6 BEDROOMS ( 110 GPD) _-330_ GPD 2. MUNICIPAL WATER is USE A330_GPD DESIGN FLOW 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 10 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H- SEPTIC TANK: 330 , GPD ( 2 ) — = 660 5. PIPE JOINTS TO BE MADE WATERTIGHT. USE A 150_0_ GALLON SEPTIC TANK 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS, ENVIRONMENTAL CODE TITLE V. LEACHING: 2(25 + 12.83) 2 (.74) = 112 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE SIDES: USED FOR LOT LINE STAKING. 25 x 12.83' (.74) = 237 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. BOTTOM:- 9. EAD OR CONCEALED WITHOUT COMPONENTSBEBACKFILLED TOTAL: 471 S.F 349 GPD NAND PERMISSION OBTAINED BY BOARD USE (2) 500 GAL. ACME OR EQUAL LEACHING FROM BOARD OF HEALTH. CHAMBERS WITH 4' OF STONE ALL AROUND 10. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE UTILITIES PRIOR LOCATION OF ALL UNDERGROUND & OVERHEAD TO COMMENCEMENT OF WORK, LEGEND 100.0 PROPOSED SPOT ELEVATION 100xO EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 100 — EXISTING CONTOUR BOARD OF HEALTH 4 MA PROVED DATE off 508-362-4541 fax 508 362-9880 I down cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouth, ma 02675 SITE AND SEWAGE PLAN OF #80 POMPANO ROAD IN THE TOWN OF: YARMOUTH PREPARED FOR: BRIAN AND SUSAN INMAN 20 0 20 40 SCALE: 1" = 20' DATE: AUGUST 18, 1998 �N Of PTAH OF MRI 1- M ARNE s AW ARNE H. H c^ GALA S OJALA C""IL v No. 26348 oe N' D9k14 cm �s�Ory4f 'VP 21 ;? AL ARNE H. OJALA> E., P.L.S. DATE