Loading...
HomeMy WebLinkAbout13 Railway Bluffs Site and Sewage PlanT.O.F. AT EL. (7-13 _ _ - - SEP IC PROFILE ACCESS COVER TO WITHIN 6' OF,FIN. GRADE (NOT TOSCAW TEST HOLE .LOGS - ACCESS COVER"(WATERT1GFfty Or• ENGINEER: h`. D�' c _.i " 1!o t< INIMUM .75` OF COVER OVER PRE WITHIN 6' OF FIN. GRADE - ' i f %- � -7 a 2% SLOPE REQUIRED OVER SYSTEM o <o It WITNESS: iJr >'�4�L SLS• RUN PIPE LEVEL 2' DOUBLE WASHED PEA STONE FOR FIRST 2' DATE: PR I OPOSED eco / L +/ GALLON SEPTIC- _ �! ,. �- 5r +._-_3. PERC.: RATE M1 I tj 1u=J TANK (H- 10) T ! ((rTOP_.OF PERC. AT ( .. BAFFLE „ P 13! CLASS I�! SOILS P# (_$ SLOPE)6' CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 (2]) DEPTH OF FLOW I 1� TEE SIZES: (_% SLOPE) 1.w. (_X SLOPE) 3/4' TO 1 1/Y DOUBLE WASHED STONE v a 2 INLET DEPTH - I OUTLET DEPTH =� - _._ _ _.._._C\ I • ' FOUNDATION— 51 — SEPTIC TANK Zv' D' BOX'>j I LEACHING FACILITY fig R-19gc N �cGc%'b� plO� wl to A•`lur-I o�rv'c5T�r1• �� I� �O 35 A6�T. 6. s ,-J/r- Ka Lzovlko. BOTTOM T.H.# I 0 'moo • r6 /F�� 1 - � LOCATION. ,MAP NO SCALE ASSE§SORS MAP I& PARCEL CURRENT, ZONING DISTRICT: SETBACKS: FRONT = SIDE REAR- _ FLAN REFERENCE. ". FLOOD p U is FE S 2005 BY— fwrrar-t �o I..te-TES• NOTES: O �/ .v.� � E✓EV. �-2F'i,T I�j.3' .. , f� KEEP 1^'j E F` SEPTIC DESIGN: Sj �% (WBAGE DISPOSER IS 1. DATUM IS _JAG oO _ iz►� ZZ 9 / isr � oF� PEa-,�Er�r-mF= -�� AWs�r�O ) ' L9rr-Svr5 0 /P rp ��� 1� �o,Js- DESIGN FLOW: _±_ BEDROOMS (JL,Q GPD) =44-o GPD 2. MUNICIPAL WATER IS.-r�I�Tr14 USE A -±4v GPD DESIGN FLOW, 3. MINIMUM PIPE PITCH TO. BE 1/8", PER FOOT. Y.o � � f AM, ArPP�° �% �'.�r F �R 4 SEPTIC TANK: �.o GPD (Z ��p GALLONS 4. DESIGN LOADING FOR ALL PRECAST, UNITS TO BE 'AASHO H- 10 ` \ I. Ems:• .,s•� 3 -USE. A Ls_oQ GALLON SEPTIC TANK i�Oi�E \ 5. PIPE JOINTS TO BE MADE`WATERTIGHT. ' LEACHING: 6. CONSTRUCTION. DETAILS ,TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL- CODE TITLE .V.• Pl`fGt` �1R� E;SIDES: �Fo. + 3 Y 7. THIS PLAN"IS FOR -•PROPOSED WORK ONLY AND NOT TO BE f 5 , (�j = Ih3 GPD USED FOR LOT LINE STAKING. 4cS �./ / BOTTOM: �•Z5 X �i.¢ 3 (� Zlc 3 GPD 8. PIPE FOR StPTIC` SYSTEM TO SCH 40-4" PVC:' �J Io TOTAL: SSI S.F. GPD N_ 3a5 Vis/ �(�%EeoJaTVN> 9. COMPONENTS NOT TO BE:,' BACKF,ILLED OR 'CONCEALED WITHOUT 1h� 5 1rifYlCl�•tt2r<efi I�le'vfy,� oQ1x INSPECTION BY BOARD. OF HEALTH AND. PERMISSION OBTAINED IZ`4r Ar3�1r. .1 r FROM BOARD OF HEALTH. / I r t tvI 3 =TI'o, lE arr EiJI.cE�S Z' o r .G y��� 10. CESSPOOLS • TO BE PUMPED AND FILLED WITH CLEAN SAND OR o ��(E 0 I-to�S� No 54fl,�Te va�er— REMOVED•AS NECESSARY.., IQ -, LEGEND - -..: I 100.0 PROPOSED SPOT ELEVATION�� Q?Osc 100x0 EXISTING SPOT ELEVATION S1 TE AND .?EWAGE,,PLAN OF Q 100 PROPOSED CONTOUR I � a 100-- EXISTING CONTOUR .IN THE TOWN''OF: t ,.. 4 r �\ -� Q i r� EXISTING TREE �kl�yt� �a ►%toy T',�- N \ PREPARED FOR: - �" BOARD OF HEALTH ED O APPROVED I e (DATE , of ,, SCALE: - �=-L— DATE: O dr 5W x2- fox b0E I 1yF. \ D�• bl v c.Tls r.[. t�� 5-r'nrc La I ,,.� J362 -MMM EO down Cape engineering, inc. rW IFjCIVIL: ENGINEERS' ARNE LLAND SURVEYORS �v, dN o T n 939 main st.::yarmouth, 'ma, 02675 -Ilk O17 #j 4V -3417 jam. ✓ F � AR OJALA, vo - DATE ,