HomeMy WebLinkAbout13 Railway Bluffs Site and Sewage PlanT.O.F. AT EL. (7-13 _ _ - - SEP IC PROFILE
ACCESS COVER TO WITHIN 6' OF,FIN. GRADE (NOT TOSCAW TEST HOLE .LOGS -
ACCESS COVER"(WATERT1GFfty Or•
ENGINEER: h`. D�' c
_.i
" 1!o t< INIMUM .75` OF COVER OVER PRE WITHIN 6' OF FIN. GRADE - '
i
f %- � -7 a 2% SLOPE REQUIRED OVER SYSTEM
o <o
It
WITNESS:
iJr >'�4�L SLS•
RUN PIPE LEVEL 2' DOUBLE WASHED PEA
STONE
FOR FIRST 2' DATE:
PR
I OPOSED eco / L
+/ GALLON SEPTIC- _ �! ,. �- 5r +._-_3. PERC.: RATE M1 I tj
1u=J TANK (H- 10) T ! ((rTOP_.OF PERC. AT
( .. BAFFLE
„
P 13! CLASS I�! SOILS P#
(_$ SLOPE)6' CRUSHED STONE OR MECHANICAL
COMPACTION. (15.221 (2])
DEPTH OF FLOW I 1�
TEE SIZES: (_% SLOPE) 1.w. (_X SLOPE) 3/4' TO 1 1/Y DOUBLE WASHED STONE v a 2
INLET DEPTH -
I OUTLET DEPTH =� - _._ _ _.._._C\
I •
' FOUNDATION— 51 — SEPTIC TANK Zv' D' BOX'>j I LEACHING
FACILITY
fig R-19gc
N �cGc%'b� plO� wl to
A•`lur-I o�rv'c5T�r1• �� I� �O 35 A6�T.
6. s ,-J/r- Ka Lzovlko. BOTTOM T.H.# I
0
'moo • r6 /F��
1 -
�
LOCATION. ,MAP NO SCALE
ASSE§SORS MAP I& PARCEL
CURRENT, ZONING DISTRICT:
SETBACKS:
FRONT =
SIDE
REAR- _
FLAN REFERENCE. ".
FLOOD p U is
FE S 2005
BY—
fwrrar-t
�o I..te-TES• NOTES:
O �/ .v.� � E✓EV. �-2F'i,T I�j.3' .. ,
f� KEEP 1^'j E F` SEPTIC DESIGN:
Sj �% (WBAGE DISPOSER IS 1. DATUM IS _JAG oO _ iz►� ZZ
9 / isr � oF� PEa-,�Er�r-mF= -�� AWs�r�O ) '
L9rr-Svr5 0 /P rp ��� 1� �o,Js- DESIGN FLOW: _±_ BEDROOMS (JL,Q GPD) =44-o GPD 2. MUNICIPAL WATER IS.-r�I�Tr14
USE A -±4v GPD DESIGN FLOW, 3. MINIMUM PIPE PITCH TO. BE 1/8", PER FOOT.
Y.o � � f
AM, ArPP�° �% �'.�r F �R 4 SEPTIC TANK: �.o GPD (Z ��p GALLONS 4. DESIGN LOADING FOR ALL PRECAST, UNITS TO BE 'AASHO H- 10
` \ I.
Ems:• .,s•� 3 -USE. A Ls_oQ GALLON SEPTIC TANK
i�Oi�E \ 5. PIPE JOINTS TO BE MADE`WATERTIGHT. '
LEACHING: 6. CONSTRUCTION. DETAILS ,TO BE IN ACCORDANCE WITH MASS.
ENVIRONMENTAL- CODE TITLE .V.•
Pl`fGt` �1R� E;SIDES: �Fo. + 3 Y 7. THIS PLAN"IS FOR -•PROPOSED WORK ONLY AND NOT TO BE
f 5 , (�j = Ih3 GPD USED FOR LOT LINE STAKING.
4cS �./ / BOTTOM: �•Z5 X �i.¢ 3 (� Zlc 3 GPD 8. PIPE FOR StPTIC` SYSTEM TO SCH 40-4" PVC:'
�J Io TOTAL: SSI S.F. GPD N_
3a5 Vis/ �(�%EeoJaTVN> 9. COMPONENTS NOT TO BE:,' BACKF,ILLED OR 'CONCEALED WITHOUT
1h� 5 1rifYlCl�•tt2r<efi I�le'vfy,� oQ1x INSPECTION BY BOARD. OF HEALTH AND. PERMISSION OBTAINED
IZ`4r Ar3�1r. .1 r FROM BOARD OF HEALTH.
/ I r t tvI 3 =TI'o, lE arr EiJI.cE�S Z' o r .G y��� 10. CESSPOOLS • TO BE PUMPED AND FILLED WITH CLEAN SAND OR
o
��(E 0 I-to�S� No 54fl,�Te va�er— REMOVED•AS NECESSARY..,
IQ
-, LEGEND - -..:
I
100.0 PROPOSED SPOT ELEVATION�� Q?Osc
100x0 EXISTING SPOT ELEVATION S1 TE AND .?EWAGE,,PLAN
OF
Q 100 PROPOSED CONTOUR I
� a
100-- EXISTING CONTOUR
.IN THE TOWN''OF:
t ,..
4 r �\ -� Q i r� EXISTING TREE
�kl�yt� �a ►%toy T',�-
N \ PREPARED FOR:
-
�" BOARD OF HEALTH
ED O
APPROVED
I e (DATE ,
of ,, SCALE: - �=-L— DATE: O
dr 5W x2-
fox b0E I
1yF. \ D�• bl v c.Tls r.[. t�� 5-r'nrc La I ,,.� J362 -MMM
EO
down Cape engineering, inc.
rW
IFjCIVIL: ENGINEERS' ARNE
LLAND SURVEYORS �v, dN o
T n 939 main st.::yarmouth, 'ma, 02675
-Ilk
O17 #j 4V -3417 jam. ✓ F �
AR OJALA, vo - DATE
,