Loading...
HomeMy WebLinkAbout91 River Street - Schedule of ElevationsSTANDARD NOTES 1) THIS PLAN IS FOR THE INSTALLATION OR REPAIR OF A SEPTIC SYSTEM, AND IS NOT INTENDED FOR SURVEYING OR ZONING PURPOSES, 2) ALL INSTALLATION PROCEDURES AND MATERIALS SHALL CONFORM TO 310 CMR 15.000, THE STATE ENVIRONMENTAL CODE, TITLE 5, AND THE TOWN OF _ �RNjD�"�j�___ SUBSURFACE DISPOSAL REGULATIONS. 3) NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE OF AVAILABLE PROPERTY INFORMATION WITH RECORDED DEEDS OR ZONING REGULATIONS. 4) TOWN WATER SERVICES THIS PROPERTY. 5) THERE ARE NO KNOWN PRIVATE WELLS ON THIS PROPERTY OR WITHIN 100' ❑F THE PROPOSED SOIL ABSORPTION SYSTEM. 6) ALL COVERS OF SYSTEM COMPONENTS SHALL BE BROUGHT TO WITHIN 12' OF YINISHED GRADE, WITH ONE COVER OF THE SEPTIC TANK BROUGHT WITHIN 6' OF GRADE, 7) ALL SYSTEM COMPONENTS SHALL REMAIN ACCESSIBLE FOR INSPECTION, NO STRUCTURES SHALL BE LOCATED DIRECTLY UPON OR ABOVE THE COMPONENT ACCESS LOCATIONS, WHICH WOULD INTERFERE: WITH THE PERFORMANCE, ACCESS, INSPECTION PUMPING OR REPAIR. 8) NO DRIVEWAY, PARKING OR TURNING AREA, OR OTHER IMPERVI❑US AREA SHALL BE LOCATED ABOVE A SOIL ABSORPTION SYSTEM, EXCEPT WHEN VENTING HAS BEEN PROVIDED. 9) SEPTIC TANKS, GREASE TRAPS, DOSING CHAMBERS AND DISTRIBUTION BOXES SHALL BE PLACED ON A 6' STONE BASE TO ENSURE STABILITY AND PREVENT SETTLING. 10) OUTLET DISTRIBUTION LINES SHALL REMAIN LEVEL FOR A MINIMUM OF THE FIRST TWO FEET OF THEIR LENGTH, 11) ALL SYSTEM COMPONENTS SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10' OF DRIVEWAYS OR PARKING OR TURNING AREAS, IN WHICH CASE H-20 COMPONENTS SHALL BE USED, 12) ALL BUILDING SEWER LINES SHALL HAVE AN INNER DIAMETER OF 4' AND SHALL BE CAST-IRON OR SCHEDULE 40 PVC, 13) THE DEPTH TO THE TOP OF ALL SYSTEM COMPONENTS SHALL NOT EXCEED 36, UNLESS VENTING HAS BEEN PROVIDED, 14) IN THE AREAS OF EXCAVATION, EXISTING GRADES SHALL BE REESTABLISHED UNLESS NOTED AS PROPOSED CONTOURS. 15) IF SOILS ARE ENCOUNTERED DURING THE EXCAVATION FOR THE SOIL ABSORPTION SYSTEM, WHICH DIFFER NOTABLY FROM THE DEEP OBSERVATION HOLE LOG, CONTACT THE ENGINEER BEFORE PROCEEDING. 16) CONTRACTOR TO VERIFY ALL UNDERGROUND UTILITIES, TOP OF FOUNDATION EL — 1I.ZI INVERT EL 10-5`0 INVERT EL BOTTOM EL I 34'* I (10' MIN) (,ear (rEa) SZT NAIL- PINE Y .S gg794O% e , j3 , Existing Cesspoo,Ss fo be Pumped and AVd Sew 5 (lee) I (lsv / W (z7) Y) 2( Ob (12e) ,16' `(lee) pe to be relocetedpr flee)(�Ex. _ Wood" .� ' (12e9) --Frame 1O'Arb, (re e) Proposed S,b00gel _Barn _g- " _ - ;y pacl l Septic Tank _ ( 01% (8) lee ) Oz .: Ex., Md. .,a St D -Bos 3 0( ) (lee) "' " - 0 - a 0 0 Pie,rr* r_ ! e Proposed neer outlet a'2 pipe location J .q UP #w/1 p (� .,Tt<p (reel ryse) EL ; 1-3.L' �� crw.d B/r J Prnposed Leaching Facility rat N BI i77"5O" g Four 4' z 8' 500 gal ( ) O 18276• Leaching Cbembers (or equip) (q Qwl 3' stone on sided 4' on ends NI D yY SSrREE,'(Ise) Public Rlght �M 1'K. tN U Of � l4,ZZ Scale: .1" = 20' LIQUID LEVEL `10• t--►izzUU 14'11. Ga 5 3a4F1e� 04 auk Ia+- 6' STONE BASE EXISTING GROUND SURFACE EL INVERT EL 10-10 INVERT ESL 7't D -BOX APPROX SURFACE EL I Z .5- 11.7-1 5 14 - TOP EL MIN P' LAYER DOUBLE COASNcED 1/8'- L2' STONE �= 2' •••• EFFECTIVE •••• SIDEVALL L 3/4'- 1 1/2' DOUBLE WASHED STONE Na Vtr n►T S ZZ�c�v I r C D INVERT.EL INVERT EL 4' 1a t I SCHEDUL—E OF ELE\/ATI❑NS TOP OF FOUNDATION 13.3± FT INVERT OUT FOUNDATION 11_ ZI_FT INVERT Nam __1Q'S0_FT mmm OUT SEPTIC TANK (MINIMUM = DESIGN FLOW x 200%) INVERT MMD INVERT OUT D -BOX ___}A_ l_FT INVERT AT LEACHING FACILITY ___9 (e Z. FT TOP OF LEACHING FACILITY _-ll_� Z FT BOTTOM OF LEACHING FACILITY Z % FT GROUND SURFACE OVER LEACHING FACILITY MR GSl9EWRIl AlZcA �'PSoT'Tom 142tnt f)v TAi2 INVERT.EL INVERT EL 4' 1a t I SCHEDUL—E OF ELE\/ATI❑NS TOP OF FOUNDATION 13.3± FT INVERT OUT FOUNDATION 11_ ZI_FT INVERT INTO SEPTIC TANK __1Q'S0_FT INVERT OUT SEPTIC TANK (MINIMUM = DESIGN FLOW x 200%) INVERT INT❑ D -BOX INVERT OUT D -BOX ___}A_ l_FT INVERT AT LEACHING FACILITY ___9 (e Z. FT TOP OF LEACHING FACILITY _-ll_� Z FT BOTTOM OF LEACHING FACILITY Z % FT GROUND SURFACE OVER LEACHING FACILITY TEST HOLE DATA DEPTH (In.) �IcViZ�Y,> t2- �loyF. Ll A60 34 TEST HOLE DATEi 7 Z,6 SOIL EVALUATOR, Bicho r�1. Ca r WI'i R WITNESSED BYE on Com./�It 11 a� PERC RATEt L Z ♦ n In SOIL SURVEY DESIGNATION, Cower, GEOLOGIC MATERIAL, OLJ+04Sil P la ir1 DEFTO TO STANDING WATER] i Zq DEFTH TO WEEPING WATER, ^I /A EST EASONAL HIGH GROUNDWATER, EL=Z•'7S ELEV (ft,) �11,$) CCA , s� �l♦S� 32' �.6 BOTTOM EL'2-7 -7 EL BOTTOM OF TEST HOLE OR ESTIMATED HIGH GROUND WATER DESIGN DATA NUMBER OF BEDROOMS GARBAGE GRINDER DESIGN FLOW (110 GAL/BR/DAY x NUMBER OF BR) SEPTIC, TANK CAPACITY CN - 7_10 GAL (MINIMUM = DESIGN FLOW x 200%) LEACHING AREA SIDEWALL -D D_SF (2 SIDEWALLS x __Z___FT x _ 4Q_FT) + C2 ENDWALLS x __.2_-_ _FT x __LO _FT) BOTTOM +00—SF (__I O _FT x __ __FT) ,ff LONG TERM ACCEPTANCE RATE _�l_-7! T_GPD/SF LEACHIINL-r ARE10.'0E!6k&rI Ckp4 jrf ___ 4D_ GP'D GSl9EWRIl AlZcA �'PSoT'Tom 142tnt f)v TAi2 / . a « - •.. ,?.. • PROJECT LOCATION itF 4 =_:•,:if_:• o '2,� K� ASSI?,3SOR3 MAP 0 LOT a .... a APPI,ICAMI` STREETrco.n �,�E „ S; Cu5 Mr. John Curleg Jr. 91 River Street Bass River, MA T- %= I A w% PREPARED BY.- B B Lend Services Cape -Tech Environmental W Old Yaic Street P.a Boz 1611 South Yarmouth mA aI Bmwster, AfA aWM (508) 598--MR1 Far A94 -OW (eO@J 899 -* 98H Lll^�M^~'`3a oro %SI 0_D SCALE' 1" = 20' DATE August 8, �t�996 Locos MAP ::]-E ^ REV DWG. NO.. T1007 FSJN= I OF 1