Loading...
HomeMy WebLinkAbout32 Sachem Path - Septic Designa TOP OF FOUNDATION ELEV. _ 100.0 (ASSUMED) em PLUMBING TO BE RAISED AND RE -PIPED BY LICETISED PLUMBER AS NEEDED A EM 4" SCHEDULE 40 PVC PIPE 20 FT. MINIMJM FROM CELLAR MIN. PITCH 1/13" PER FT. CLEAT SAND 2" LAYER OF 10 FT. MINIMUM FROPI.SLAB OR CRAWL SPACE 1/8 1" TO 1/2" 0 FT. MINIMUM 2- PRESSURE PIPE WASHED STONE 150 PSI MINIMUM ELEV. = 107.43 MA 99.43 MIN. VENT PUMP SWITCHES DETAIL CONCRE ° _98.25 COVERS 3' MAX. z 1 CU. FT. OF 988E (. EL 98.4 ' ANNCHORTE 11 4" CAST IRON PIPE HORIZ TEXTURE COLOR MOTT. OTHER e o A LOAMY SAND 10YR5/2 NO UNSUITABLE1 33' B (OR EQUAL) MINIMUM 10YR5/6 NO ELEV. 95-851 50 Cl 2'0" LEVEL 10YR7/6 NO - ,_ _ - 1D� e ELEV. = 83.10 t0YR6/6 NO 06' C3 PITCH i/4" PER FL L Al J c ELEV. = 6" SUMP ELEV._ 98_30 _ , _ EV: = 93 87 ALARM ON FLOW LINE -gam- �p 1 DIS IION ELEV. 4 HIGH CAFI�ACITY INFILTRATORS a 1 -ELEV. 98- _ 10" MIN. iRIBU �/ 3/8" DRILL BOX _ 7,93_ WITH STONE IN AN i 4• LEV. =93.42. PUMP ON 14 GAS HOLE 11' X 38' X 1�' TRENCH FORMATION � WELL MIW29 ELEV. 98 73 - £LEV. _ BAFFLE 98_50_ _ a TO BE WATER TESTED ( TO BE PLACED ON FIRM BASE) 1n ZONE A INDEX 9.6 ELEV. = 93.08 PUMP OFF -1- r SOIL BSORPTION __ L 3/4" TO 1 1/2" ADJUST 2.82 10' ELEV. = o CHECK WASHED STONE� SYSTEM (SAS) 1 3 DATE OF SOIL TEST /27102 SOIL TEST DONE BY CRAIG R. SHOR�P. - WITNESSED BY-.LNN.MS)1JSEEPL_ OBSERVATION HOLE 1 ELEV.=- 9e a ororni ennui PATP < 2 MIN./INCH AT 1Z-§4 INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 6' A LOAMY SAND 10YR5/2 NO UNSUITABLE1 33' B LOAMY SAND 10YR5/6 NO ELEV. 95-851 50 Cl Fl SAND 10YR7/6 NO 58' C2 gMEDIUTA kAGRAVEL t0YR6/6 NO 06' C3 FINE SAND 10YR8/4 NO OUTLET 9_Z93 L VALVE (TO BE PLACE ON FIRM PZ( F) �V��� WATER ENCOUNTERED AT 6-8 ELEV. _ �1$_ 14 INCHES ��J,pryf-st- MYERS MHV 4 OR 5 19 INCHES 1500 GALL UMP USGS PROBABLE WATER TABLE ELEV. - 931 24 INCHES (OR EQUAL) OBSERVED WATER TABLE (03 / 27 /02 ) ELEV. _- (94.4 MAX.) 29 INCHES SEPTI TANK 34 INCHES CHAMBER BOTTOM OF TEST HOLE ELEV. =a _ _.._LEGEND: DESIGN CALCULATIONS 3 1000 GALLON PUMP CHAMBER CALCULATIONS: EXISTING SPOT ELEVATION 00„0 _ SEPTIC TANK NUMBER OF BEDROOMS NO _ EXISTING CONTOUR ----00---- GARBAGE DISPOSAL UNIT 96_25_ REQUIRED FLOW PER CYCLE .:25 X _3'x'4 = 8$,$ GAL./CYCLE FINAL SPOT ELEVATION 0 TOTAL ESTIMATED FLOW ELEV. AT INVERT INLET VOLUME PER CYCLE 83'8 GAL/CYCLE /7.48 GAL./CU. FT. - 11.03 CU. FT./CYCLE FINAL CONTOUR ( 110 GAL/BR./DAY X �3 BR.) 9,'14_ GAL./DAY SEWAGE DISPOSALS TEM PROFILE ELEV. AT ALARM ON 93.87 VOLUME OF WATER IN PIPE 3.14 X 0.00694 X --- FT. O.SS CU. FT. SOIL TEST LOCATION O REQUIRED SEPTIC TANK CAPACITY _15A9_ GAL. 93.4TE_ UTILITY POLE -�- 1500 GAL. NOT TO SCALE ELEV. AT PUMP ON TOTAL MINIMUM VOLUME PER CYCLE 11.6$ CU. FT. ACTUAL SIZE OF SEPTIC TANK ELEV. AT.PUMP OFF 92.2b_ DISCHARGE -11.58 CU. FT. / 34.67 CU.FT./FT. _ _ 0.3 FT. (1000 G.S.T.) TOWN WATER -WSW SOIL CLASSIFICATION --1-- BOTTOM OF INSIDE PUMP CHAMBER 92 00_ STORAGE CAPACfTY 0730_ GAL/DAY /7.48 GAL./CU.FT./34.67 CU.FT./FT. 9�- FT. CATCH BASIN®j DESIGN PERCOLATION RATE <�5_ MIN./IN. BOTTOM OF OUTSIDE PUMP CHAMBER _t27- REQUIRED x..56- PROVIDED GAS LINE EFFLUENT LOADING RATE -1.7.1._ GAL./DAY/S.F. CLEAN OUT C� LEACHING AREA 474 SQ. FT. CESSPOOL C.P. Q 11'(26.5'+9.5')+(26.5'+20.5')2(10/12) LEACHING CAPACITY (AREA X RATE) _1_ GAL./DAY 474 X 0.74 BUOYANCY CALCULATIONS: RESERVE LEACHING CAPACITY ALA_ GAL./DAY 1500GALLON SEPTIC TANKH2O 1000 GALLON PUMP CHAMBERH10 x WEIGHT OF WATER DISPLACED WEIGHT OF WATER DISPLACED NOTES: ES: (94-92.25)(10.5X5.67)(64LBS/CF) 688 LBS. 5255 LBS. (94-92x8 8x4.83)(84) 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. WEIGHT OF TANK PER MANUFACTURER _ 11.480 WEIGHT 00 TANK PER MANUFACTURER 8240 TITLE 5 AND THE TOWN RULES AND REGULATONS FOR HE SUBSURFACE EXCESS WEIGHT TO OFFSET FLOTATION 4,812 EXCESS WEIGHT TO OFFSET FLOTATION 2985 2 AISPLL oOVERSSALF 0 SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF HE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. VEN nTLE b & mil B.O.H. VAMANCM PEOUFS1 4. ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL DC MORTARED iiv PLi+i.c.• 0 SECTION 15.103 (3)(8) USE OF USGS FOR MAX. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH • N0� GROUNDWATER. 2.6 REQUIRED DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT 1S TO SEE 65 A 1.3' VARIANCE REQUESTED. OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. i N N SECTION 15212(8) DISTANCE BETWEEN BOTTOM 6, UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR OF S.A.S. &GROUND WATER 5' REQUIRED. IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS A 1.0' VARIANCE REQUESTED. PRIOR TO COMMENCING WORK ON SITE. ! 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS COMMENCING ON ITE. ANYi T c SITE TTTIH O BE BROUGHT TO OR O 5 5 SE ATTTEN71ON OF OHE DESIGN ENGINEER VARIATION IMMEDIATELY. LO 54 PUMP 8. PARCEL IS IN FLOOD ZONE __B AR£A�10100t Sf. BOX CHAMBER 9. LOT IS SHOWN ON ASSESSORS MAP _?3_ AS PARCEL 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER, AND { 1� FOR A MINIMUM OF 5 FEET FROM AROUND THE SOIL ABSORPTION SYSTEM. AND BE REPLACED WITH SAND AS SPECIFIED IN 31 CMR 1 255• { ) 1 �MWN d A E ED 0 5. 3 t SEPTIC Jl ��� � es �• `Y-Yvh.�z. (I.E. TITLE S) IF ENCOUNTERED BELOW S.A.S. PIPE INVERT. TANK 5� 36 a�. Y f 11. EXISTING SEPTIC SYSTEM TO BE PUMPED AND FILLED WITH SAND s MN' • *�•�th OF OR REMOVED. OgpIG 9C�rGe, •"f' f farpll 1'"" 12. SEPTIC TANK k PUMP CHAMBER TO BE WATER PROOF BY MFR (IPX). �' o SHORT °r' > Im EnsnHc X29 W DRELLWO w r-ASPHALrDmMwJ "Y1' -°,1•' X01 �' '- �'' APPROVED: BOARD OF HEALTH `X, EXWSrNsO BE , ; y , r OEO p.�0 #2287 DATE AGENT PROPOSED SEPTIC DESIGN FOR JAMES MORSE 32 SACHEM PATH VEST YARMOUTH, IHSS CR M� SXORT, P.K 235 GREAT 80XTER44ROAD 508- 96-8311 SOUTH DENNIS, MASS. 02661 1DATE SCALE 1 " = 20' APRIL 11, 2002 REVISED JOB NO. 12-943 LOCATION MAP REVISED I SHEET 1 OF 1 0 2002 CRAIG R. SHORT,