HomeMy WebLinkAbout32 Sachem Path - Septic Design 4BENCHMARK
TOP OF FOUNDATION
ELEV. - 100.00
(ASSUME'D)
N
prili
PLUMBING
7�ABE RAISED
IUCD RE -PIPED BY
LICENSED PLUMBER
AS NEEDED
Z
IL
0
4" CAST IRON PIPE
(OR EQUAL) MINIMUM
PITCH 1/4" PER FT.
ELEV. = 9aa?
ELEV. 96.75_
SEWAGE
4" SCHEDULE 40 PVC PIPE
FT. MINIMUM FROM CELLAR MIN. PITCH 1/8" PER FT.--, CLEAN SAND
IUM FROM SLAB OR CRAWL SPACE 2" LAYER OF
2" PRESSURE PIPE 1/8' TO 1/2"
150 PSI MINIMUM ELEV. 10143 MA WASHED STONE PVT
CONCRETE _96.35 1 3 MIN.
COVERS3' MAX. z CU. FT. OF
ONCRETE
nen � ... _ EL 98.4.3 m NCHOR
PUMP SWITCHES DETAIL
tits_ A18uu HLI K
HORIZ
TEXTURE
COLOR
ELEV. = 6" SUMP ELEV.
98_30
6"
J. :; _
LOAMY SAND
1OYR5/2
---
UNSUITABLE
33"
8
FLOW LINE
IOYR5/6
NO
ELEV. 95.951
50'
Cl
-98.5D-
_
NO
_ -�9_•
ELEV. = 93.87 ALARM ON
PUMP CHAMBER CALCULATIONS:
,o'
58"
C2
& GRAVEL
10YR6/8
NO
ELEVATION 00,0
DISTRIBUTION
ELEV. =
4 HIGH CAPACITY INFILTRATORS
10YR8/4
NO
GARBAGE DISPOSAL UNIT NO
1
g _
VOLUME PER CYCLE 825 GAL/CYCLE /7.48 GAL./CU. FT. = 11A3_ CU. FT./CYCLE FINAL SPOT ELEVATION 00.
MIN. GAS
TOTAL ESTIMATED FLOW
ELEV. AT ALARM ON
TO SCALE ELEV. AT PUMP ON
91.44
VOLUME OF WATER IN PIPE X 0.00694 X Z5
_ FT, 0_55 CU. FT. FINAL CONTOUR
SOIL TEST LOCATION �
3/8" DRILL BOX
97.Q,1'
WITH STONE IN AN
9-'S�-
z
a'
LEV. = 93.42 PUMP ON
ELEV. AT PUMP OFF
BAFFLE
a
BOTTOM OF INSIDE PUMP CHAMBER
BOTTOM OF OUTSIDE PUMP CHAMBER
HOLE
TO BE WATER TESTED
STORAGE CAPACITY ( 330_ GAL/DAY /7.48 GAL./CU.FT. 34.67 CU.FT./FT. _ 1.27 FT. TOWN WATER -W-i�W
/
11' X 38' X 10' TRENCH FORMAT ON
_1500
SOIL CLASSIFICATION - 1 -
WELL MIW29
_t27 REQUIRED -2,W- PROVIDED
CATCH BASIN®\
\-/
t4
DESIGN PERCOLATION RATE <_S5__ MIN./IN.
WEST YARMOUTH, MASS
ELEV. 98•'5_0_
GAS LINE
C
�
M.
V)
EFFLUENT LOADING RATE Q,j� GAL./DAY/S.F.
(TO BE PLACED ON FIRM BASE)
1n
ZONE A
LEACHING AREA 74 SO. T.
11'(28.5'+9.5')+(28.5'+20.5')2(10/12)
CR/9IG R SHORT; P.R
CHECK 3/4" TO
1 1/2"
SOIL ABSORPTION
INDEX 9.6
BUOYANCY CALCULATIONS:
ELEV. = 93.08 PUMP OFF
474 X 0.74
RESERVE LEACHING CAPACITY _ 1h[A GAL/DAY
508- P. 0. BOX 1044
1500GALLON SEPTIC TANKH2O
1000 GALLON PUMP CHAMBERHIO
SOUTH DENNIS, MASS.
398-8311 02660
VALVE WASHED
STONE
SYSTEM JTI:M /SAS1
(SAS)
WEIGHT OF WATER DISPLACED
ADJUST 2.8 1 2
(94-92.25)(10.5X5.67)(64LBS/CF)- 6,668 LBS.
t0�'
DATE APRIL 2002
DAwi�
BE PLACED ON FIRM SE)
WEIGHT OF TANK PER MANUFACTURER 8240
1.
ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
7.3
EXCESS WEIGHT TO OFFSET FLOTATION
TITLE 5 AND THE TOWN RULES AND REGULATIONS FOR THE SUBSURFACE
f
2985
REVISED 1
SOIL TEST
DATE OF SOIL TEST 3J-271?
SOIL TEST DONE BY CRAIG R.P..
WITNESSED BY �lyy11EEN
OBSERVATION HOLE 1 ELEV.= 96.6
PERCOLATION RATE < 2 _ MIN./INCH AT _52=64 INCHES
DEPTH
HORIZ
TEXTURE
COLOR
MOTT.
OTHER
6"
A
LOAMY SAND
1OYR5/2
NO
UNSUITABLE
33"
8
(OR EQUAL)
SEPTIC TANK CHAMBER
IOYR5/6
NO
ELEV. 95.951
50'
Cl
FLONAEMYYpSAND
AdEDIUAd SAND
1OYR7/6
NO
_ -�9_•
SEPTIC TANK
PUMP CHAMBER CALCULATIONS:
LEGEND:
EXISTING SPOT
58"
C2
& GRAVEL
10YR6/8
NO
ELEVATION 00,0
106'
C3
FINE SAND
10YR8/4
NO
1500 GALL MYERS MHV 4 OR 5
AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255: (3)
mVAR1ANCE
•,�
UMP-
Y *` %
(I. E. TITLE 5) IF ENCOUNTERED BELOW S.A.S. PIPE INVERT.
;'`'QLSN Ft l,y�1
(, SHORY
931
11.
12.
WATER ENCOUNTERED AT __B.B ELEV. o1.H
(OR EQUAL)
SEPTIC TANK CHAMBER
�'t
USGS PROBABLE WATER TABLE ELEV.
OBSERVED WATER TABLE ( 03 / 27 /02 ) ELEV.
-
=.� _ (94.4 MAX.)
APPROVED: BOARD OF HEALTH
NCI
1000 GALLON
BOTTOM OF TEST HOLE ELEV.
_ -�9_•
SEPTIC TANK
PUMP CHAMBER CALCULATIONS:
LEGEND:
EXISTING SPOT
DESIGN CALCULATIONS
'
ELEVATION 00,0
#2287
NUMBER OF BEDROOMS 3
96.25
REQUIRED FLOW PER CYCLE .25 X _,' _ X2,5 GAL./CYCLE EXISTING CONTOUR ----00----
GARBAGE DISPOSAL UNIT NO
ELEV. AT INVERT ET
AL SYSTEM PROFILE
g _
VOLUME PER CYCLE 825 GAL/CYCLE /7.48 GAL./CU. FT. = 11A3_ CU. FT./CYCLE FINAL SPOT ELEVATION 00.
TOTAL ESTIMATED FLOW
ELEV. AT ALARM ON
TO SCALE ELEV. AT PUMP ON
91.44
VOLUME OF WATER IN PIPE X 0.00694 X Z5
_ FT, 0_55 CU. FT. FINAL CONTOUR
SOIL TEST LOCATION �
( 110 GAL./BR./DAY X �_ BR.) -,331- GAL./DAY
FOR
9-'S�-
CYCLE
TOTAL MINIMUM VOLUME PER CYCLE 1],'>fD CU. FT.
AN
REQUIRED SEPTIC TANK CAPACITY GAL
ELEV. AT PUMP OFF
DISCHARGE _J_1 CU. FT. / 34.67 CU.FT./FT. _ _ 0.33 FT. (1000 G.S.T.) UTILITY POLE --C-
_1509_
ACTUAL SIZE OF SEPTIC TANK GAL.
BOTTOM OF INSIDE PUMP CHAMBER
BOTTOM OF OUTSIDE PUMP CHAMBER
=3.25_
93•�
STORAGE CAPACITY ( 330_ GAL/DAY /7.48 GAL./CU.FT. 34.67 CU.FT./FT. _ 1.27 FT. TOWN WATER -W-i�W
/
_1500
SOIL CLASSIFICATION - 1 -
bf rC £4 w.c�-s
_t27 REQUIRED -2,W- PROVIDED
CATCH BASIN®\
\-/
DESIGN PERCOLATION RATE <_S5__ MIN./IN.
WEST YARMOUTH, MASS
GAS LINE
C
�
EFFLUENT LOADING RATE Q,j� GAL./DAY/S.F.
CLEAN OUT
CESSPOOL C.P.0
LEACHING AREA 74 SO. T.
11'(28.5'+9.5')+(28.5'+20.5')2(10/12)
CR/9IG R SHORT; P.R
LEACHING CAPACITY (AREA X RATE) -.SSL GAL./DAY
235 GREAT WESTERN ROAD
BUOYANCY CALCULATIONS:
474 X 0.74
RESERVE LEACHING CAPACITY _ 1h[A GAL/DAY
508- P. 0. BOX 1044
1500GALLON SEPTIC TANKH2O
1000 GALLON PUMP CHAMBERHIO
SOUTH DENNIS, MASS.
398-8311 02660
WEIGHT OF WATER DISPLACED
WEIGHT OF WATER DISPLACED
rc�+
NOTES:
(94-92.25)(10.5X5.67)(64LBS/CF)- 6,668 LBS.
(94-92)(&5x4.83x64) 5255 LBS.
DATE APRIL 2002
DAwi�
(WEIGHT OF TANK PER MANUFACTURER 11.480
WEIGHT OF TANK PER MANUFACTURER 8240
1.
ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
EXCESS WEIGHT TO OFFSET FLOTATION 4,812
EXCESS WEIGHT TO OFFSET FLOTATION
TITLE 5 AND THE TOWN RULES AND REGULATIONS FOR THE SUBSURFACE
f
2985
REVISED 1
DISPOSAL OF SEWAGE.
2.
ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
LOCATION MAP
REVISED
SHEET 1 OF 1
WITHIN 6" OF FINISHED GRADE.
3.
ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF
W1THSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WTHIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
VEN
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
10
Tiro, 5 & TOM B.O.H. VAMAN(M pEQUMM
4.
ANY MASONRY UNITS USED TO BRING COVERS TO GRADE SHALL
SECTION 15.103 (3)(B) USE OF USGS FOR MAX.
5.
BE MORTARED IN PLACE.
.SES
5 1
GROUNDWATER. 2.6 REWIRED
NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
26
r" N.
M
A 1.3' VARIANCE REQUESTED.
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
SECTION 15212(8) DISTANCE BETWEEN BOTTOM
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
yN6.
OF S.A.S. & GROUND WATER 5' REQUIRED.
UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
U•
IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS
�><1o
A 1.0' VARIANCE REQUESTED.
PRIOR TO COMMENCING WORK ON SITE.
7.
CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
LOT 54
J
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
AREA,wIalODf Sf. IST
PUMP
IMMEDIATELY.
B
CHAMBER
8.
PARCEL IS IN FLOOD ZONE
9.
_-a -.
LOT IS SHOWN ON ASSESSORS MAP ?J AS PARCEL
4k
1M\NQ
10.
_
ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM'UNDER, AND
��
FOR A MINIMUM OF 5 FEET FROM AROUND THE SOIL ABSORPTION SYSTEM
29 t DOSllNC +
DOELL C t Ka
P�„r Etl
Y Q EXS�RIG 0E
DECK 0 `3 _
m tL REµ�Vti; ,0 Stlm;
,
B!T-A5nHALT Wt/bE
100.oD
'y,"
C 2002 CRAIG R. SHORT, P.E:
AND BE REPLACED WITH SAND AS SPECIFIED IN 310 CMR 15.255: (3)
•,�
Y *` %
(I. E. TITLE 5) IF ENCOUNTERED BELOW S.A.S. PIPE INVERT.
;'`'QLSN Ft l,y�1
(, SHORY
15r 4S`
11.
12.
EXISTING SEPTIC SYSTEM TO BE PUMPED AND FILLED WITH SAND
OR REMOVED.
SEPTIC TANK & PUMP CHAMBER TO BE WATER PROOF BY MFR (IPX),
�'t
APPROVED: BOARD OF HEALTH
NCI
'
#2287
DATE AGENT
PROPOSED SEPTIC DESIGN
�.
_
FOR
JAMES MORSE
bf rC £4 w.c�-s
LOC. 32 SACHEM PATH
?� sAcrFM
WEST YARMOUTH, MASS
L aCV g
CR/9IG R SHORT; P.R
235 GREAT WESTERN ROAD
508- P. 0. BOX 1044
SOUTH DENNIS, MASS.
398-8311 02660
SCALE c 20'
DATE APRIL 2002
DAwi�
�.�•
,
I
f
JOB NO. 12 943
I
REVISED 1
LOCATION MAP
REVISED
SHEET 1 OF 1
C 2002 CRAIG R. SHORT, P.E: