Loading...
HomeMy WebLinkAbout19 Sagamore Road - Sewage Disposal System DesignSOIL • PIT DATA.: SEPTEMBER 10, 2002 SEPTIC TANK • DETAIL. 1 500 GALLON` DISPOSAL FACILITY ONLY. DISTRIBUTION BOX DETAIL. NOT TO LEACHING Fl: -'LD DETAIL. _ NOT TO SCALE TEST OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN ` 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE NOT TO SCALE IMPERVIOUS MATERIAL- ATERIAL6. 6.REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS NO. OF OUTLETSrj SIEVE ANALYSIS: _ VEN1 , PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL NOTES: 1, SEPTIC TANK 4ALL'BE STEEL 5. INLET AND OUTLET TEES TO BE CAST IRON, UNIFORMITY COEFna6h ® No. 4 FINISHED GRADE 7. EXISTING UTILITIES WHERE SHOWN 36' MAX .COVER THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND REINFORCED C 'NCRETE. SCHED." 40 PVC OR CAST -IN-PLACE CONCRETE. TEES TO BE CENTERED UNDER MANHOLE COVER. COMPANY AND MAINTAINING THE " REMOVABLE 2 WALLS DIG -SAFE SHALL BE NOTIFIED PER FINISHED GRADE 3A TEST PIT _ #t AT TEL. 1-888-344-7233. THE - 2. SEPTIC TANK R WITHSTAND -1 AIN J THSTA D H 0 LO D G DRIVES20 UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND NOTES: COVER TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, � ' •,- . ;�.� a GRD.. EL. 10.4 " EST. HIGH GW.: 3.0 INDICATES TRAVELED WAUNLESS SHALL APPLY. , WHEREIN H LOADING 1. DIST. BOX TO WITHSTAND H-10 LOADING T MSAMER UNLESS UNDER PAVEMENT,' DRIVES OR A LOA AND ESTIMATED _ SEASONAL HIGH GROUND WATER 3. ALL PIPE CON CONSTRUCTION 4. FILL ALL UNUS EC7IONS AND CONCRETE SHALL BE WATERTIGHT. D KNOCKOUTS MATH 2-24 DIA METAL MANHOLES W BOLT ON COVERS BROUGHT T6 FINISH GRADE 9. EXITING INVERTS ARE TO BE CHECKED BY f :T TRAVELED WAYS WHEREIN H-20 LOADING 1 ( SHALL APPLY. _!_ 15 4 PVC • • ' . e a e De a e - u'• •=+ - 'ape pe a4e e c 606 ° Se Q005p�a a �a e e r OF COI R[7E °$.Aga'�a�s��°aa�go 6,y I 10YR 4 3 INDICATES MORTAR. 'W. Yarmouth Massachusetts, 02673 508 778 8919 " ., a $ 2 A g PROVDE INLET TEE OR BAFFLE WHERE 5.5 OUTLETS r /oae�eae a ea n♦ ea ea ea eaoaeaeae ere eae e I/ }p e P aRPa4P 9P a°da°d° aS`a°P O 1 6" OBSERVED 19 TEE TO BE UNDER • 12 MIN. � W. YARMOUTH 9... SLOPE OF PIPE EXCEEDS 0.08 FL/FT OR �\ -MM\ \- ,,.: -, z :. \ Z= ! ` LEVEL„BOTTOM\ B . ' LOAMY SAND _S7_ _ GROUND WATER MASSACHUSETTS M.H. OPENING COVER 6 </ 3 r DATE: SEPTEMBER 25," 2002 •Ib<a ,eP < o wear ° �b°< '�o<artbeea r IN PUMPED SYSTEM. °�$aaaq,aa 4°�`ix 3°be4 a L _ 2" ' 3. FIRST TWO FEET OF PIPE OUT OF DIST. CHECK: D. CRISPIN , ?IAMB S 4 / INDICATES 10 -6 RAISE M.H WL. 4 " SEWER BRICK r - <..: ., ce a •.•< JOB >N0. 4-8448.00 '• BOTTOM ON LEVEL r BOX TO BE LAID LEVEL ':- STABLE BASE 6 MIN. 3/4 TO 11/2 CRUSHED PROFILE » 19 PERC. 1 •_ 0 0 do MORTAR < 12 CROSS-SECTION 4.' ALL PIPE CONNECTIONS AND CONCRETE STONE BASE EL = $.S TEST .- NORMAL WATER LEVEL CONSTRUCTION SHALL BE WATERTIGHT. 36' MAX - 12' MIN. COVER Cl MEDIUM SANQ - IAMB 5/6<� INDICATES UNSUITABLE ❑ TANK 7 a L 3" 1? 10' 14 _ < INLET TEE :� 5'-1' 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. 30 1/27 - 2S MIN, FINISH GRADE J' 4 MIN. LOAM do SEED PRECAST SEPT)' ,. .:- MATERIAL - _ - , „ 5-2 4'-6' • 4'-0" MIN. � a 5-$ 15 1/2 I$' MIN M KAxIMUM l 67 _ - 5'-8" z =' UOUID DEPTH (GAS caNma) PRECAST DIST. p 6 1 ffp$:a �°Pa R'P�'e Q7/1A3'P�`�:P 3t4bc3'a T.2" MIN. OF 1/8" TO l� a oa e e e9 o sr • o. e`�e .N'. :. b. 80X 6• �po�laaglPa'f�Na!i°�`O/yPire�Pa�`5ee 1/2" WASHED STONE 6 g`d r ear o /`a Cit L OAMY- FINE SAND - DATE: � ' _ " .- e... .<ie..: d;..:�':•c :'•• <:e.: <<': ..e •�- 3/4' TO 1-1/2' DOUBLE' �� pe y �eyr/r ,���•� 2.5Y ; 5/4 $1" 9/10/02 a BOTTOM ON LEVEL STABLE BASE - c 3 �- _� 7 1/2 WASHED STONE (NO FINES) 7YP) %TEST EL `= 3.0 84" BY: PLAN VI :W 6 MIN. 3/4 TO d, !G� , �0/C\`rYT CROSS-SECTION VIEW PLAN vlEw 40MIL POLY. BARRIER CROSS-SECTION - _ THE BSC GROUP, INC. 1 1/2" STONE WITNESSED BY: EL 0.9' - ;114" LYNN' MULKEEN-McCARTIN CB/LEADED H PERC. RATE: DESIGN CRITERIA: ., C3 «_MIN./INCH 4 Oo o \ o o . DESIGN FLOW.I LOAMY :FINE SAND 2.5Y 6/3, SOIL EVALUATOR CRAIG FIELDs� ,, '.. N r' , (� \ No z . t3 BEDROOMS AT110G.P.B./D 330 G.P.D. SOIL CLASS: EL = 0.4 120 LT.A.R. BENCHMARK: \ �F�. \ m REQUIRED SEPTIC TANK. 0.74 G.P.D./SQ.FT. TOP OF CONC. BOUND EL. 10.59 \ F ✓y \ . f 330 X 200% _ 660 GAL. _ 1500 AL. \ o o SEPTIC TANK PROVIDED: W A CB/LE DED' �./ \ \ X 10.s � PROPOSED NEW DRIVEWAY TO BE SIZE OF LEACHING FACILITY REQUIRED: . DATUM. DESIGN PERC. RATE: <6 MIN./ INCH < N/F - � a MICHAEL KACZMAREK LIMITS OF D, BOX 10 •- F� A MINIMUM OF \C'F \ ;VERTICAL DATUM: 1929 NGVD o0 ASSESSORS MAP 29 EXCAVATION MIN; -yQ 10'TA FROM SEPTIC LONG TERM APPL. RATE 0,70 G.P.D S.F. NCH MARK USED: TOWN OF YARMOUTH MONUMENT 4 BE # PARCEL 0 127 SEE NOTES ,�,. \OXT. \ TANK. BENCH MARK SET: TOP OF CONCRETE BOUND EL=10.59 0 5 AND 6 0 ' ; ' . °o. 9 "y \ \ 330 GPD + 0.70 GPD/SF = 472 S.F. PROFILE: NOT TO SCALE PROPOSED s, 9 s, c 3' ye SIZE OF LEACHING FACILITY PROVIDED: 1,500 GALLON A/ SEPTIC TANKEL.+ W \ =A TOP FOUNDATION BOLT ON METAL COVERS TO FIRST PIPE LENGTH TO BE SET LEVEL A ee � �,.' � ,,>z x • •e \ ,O - o x - 330 GPD 0,70 SF/GPD - 472 S.F. EL=11.5 FINISHED GRADE. FOR MIN. 2' FINISH' GRADE . , ,, e Q � e - EL=10.5-10.3 ° e x e UPLT USE LEACHING FIELD 4" PVC SCH so ,G I / 5.0' BOTTOM = 14! x 34' = 476 S.F V�� LEACHING FlE D - - \ =D EMOVE �' °o• \, \ 476 S.F X 0.70 GPD/SF = 333 GPD :> I=G �- / PO� F /Q" �G . •� OAK •' e� . • : - ` _ 5 OUTLET �/ . . DIST. I=F BOX 5' SEPARATION e� �O Nh 0 r7�(j 1`- ° % ° �. \ L \ �O- SEPTIC TANK 0 G / ° iVENT \ HI GROUNDWATER EST. HIGH G �� O\�/ ix \�/ 5 OJ/ N/F / ♦. , , \ ; o EMOVE �l o� J CB v K / :. 12 AK \ N/F PAUL D. GOODRICH EUGENE F. GINGRAS / ASSESSORS MAP 29y / �� CB/LEADED ONE STORY / \ \ LOCUS INFORMATION � INVERT ELEVATIONS. MAP AssEssoRs 2 PARCEL 126 ,� WOOD FRAME -9-- \ • PARCEL -118 / • ; 5,400fS.F. / INV. 8.7 HOUSE x . 19 CURRENT OWNER: EUGENE F. GINGRAS \ TOP OF FOUNDATION 12.3 A 10.3 EXISTING CB LEADED.- � ,` _ ,. 2 _; ,.. \, .�---9'� � \ EXIST. 70F 10.3 ✓ / �' � ® \ TITLE REFERENCE: PLAN BOOK 18 PAGE 43 „ 9.50 B ADDITION - �P\ - \ INTERIOR PLUMBING / m ,\ 3� O L CB : _ PLAN REFERENCE. BOOK 33, PAGE 63 " 4 INVERT AT BUILDING r \ TO / PROPOSED 4 MI - BE RELOCATED � ` P RO OSED 0 L -, . 4 INVERT AT SEPTIC TANK` (IN) 9.25 C \ EXISTING \ / � / 6.5, 5 POLY., LINER / \ QO \ ASSESSORS MAP: 29 '4".INVERT AT SEPTIC TANK (OUT) 8.95 D s� LEACHING AREA \ .: 75 LONG) FROM EL 9.5 / ( PARCEL. 126 ' " 4 INVERT AT DIST. BOX (IN) 8.87 E �. `�O- TO BE LOCATED AND \ ABANDONED IN �\ ` ' -n \ ZONING DISTRICT: R-25 4 INVERT AT DIST. `BOX (OUT) 0 F- �.- °O+ ACCORDANCE WITH \ � \ �/ � / 6.6' REMOVE do REPLACE -r1 r ro _ \ SETBACKS: FRONT 30 SIDE 15. - TITLE V p0 , a a \ REAR 20 \ l., �p EXISTING WATER . 'INVERTS AT -LEACHING .FACILITY: ti / v, / �, / LINE, o 0 z \ � MINIMUM LOT SIZE: �25,00o S.F. 4" INVERT AT BEGINNING ` ti .-8' i v q \ EXIST..TOTAL LOT AREA: 5,400 S.F. OF LEACHING FIELD 8.65 G '' F '! ADDITION G PROPOSED ADo Q � N N _ � OVERLAY DISTRICT: NOT IN A ZONE II 4 INVERT AT END -- (TYPICAL) � 1n FEMA F"L17015'"'�"Z��=t2�ELe+�AitON-a2)- OF ;LEACHING FIELD 8.5 H G`( ` A% > J N o IC . ' LONE D1STR.i.T. PAN'EL-�250C�15 0005 D ELEVATION AT BOTTOM ELEVATION, o N/F _ OF LEACHING FIELD $.0 J Oo tlq� FRANCES RAND -SHAW N/F 5 ASSESSORS MAP 29. LOCUS PLAN: ND SCALE ADJUSTED FOR HIGH -TIDE s.0 K RONALD C. ASSE YATES LIFE EST. PARCEL 125 SOBS MAP 29 P RCEL 119 OBSERVED GROUNDWATER 0.9 ` 28 N VARIANCES REQUESTED: TITLE V. SECTION 15.211. (1) TO ALLOW LEACHING SYSTEM TO BE .5, OFF FRONT -N F N T F 1 PROPERTY ONES i LIEU O 0 . DOMENICK J ROSSETTi 2 ASSESSORS MAP 29 TO ALLOW THE LEACHING SYSTEM TO BE 15 OFF PARCEL 120 6R f EXISTING FOUNDATION WALL IN LIEU OF 20'_ J✓SSR � RO Y A 40 MIL IMPERVIOUS BARRIER IS TO BE INSTALLED DAVID It `, GR S L - A CIVIL1 E PLAN VIEW Mo.32112 Ra ND MERF STRF LOCUS Et - SCALE. 1' 10 FEET , - 0 5 10 20 FT. <Z REVISIONS NO. DATE DESCRIPTION GENERAL NOTES; 1. THIS PLAN IS FOR DESIGN AND _ CONSTRUCTION OF THE SEWAGE - DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALLCONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN ` 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL SUBSOIL AND OTHER IMPERVIOUS MATERIAL- ATERIAL6. 6.REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL PASS No. 100 <5 % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFna6h ® No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAW?NGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY ` COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82. SECTION 409 AT TEL. 1-888-344-7233. THE - ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTIUTIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE TO RECOGNIZED ADVERSE IMPACTS TO THE.LEACHING FACILITY. 9. EXITING INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO CONSTRUCTION THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. ��I� BSC GROUP 657 Main ST., (RT. 28) Unit 6 'W. Yarmouth Massachusetts, 02673 508 778 8919 PROJECT .TITLE: SEWAGE DISPOSAL SYSTEM DESIGN REPAIR 19 SAGAMORE ROAD W. YARMOUTH MASSACHUSETTS, PREPARED FOR: THOMAS INMAN 771 BOSTON POST ROAD MARLBOROUGH MASSACHUSETTS 01752 DATE: SEPTEMBER 25," 2002 COMP:/DESIGN: K. HEALY - CHECK: D. CRISPIN DRAWN: P. HAGIST ' FIELD:. D. GAZZOLO / J. McCARTIN FILE NO. 8448-SEP.DWG DWGNO. 5320-02 SHEET I OF 1 JOB >N0. 4-8448.00