Loading...
HomeMy WebLinkAbout97 Salt Box Road - Plan of LandACCESS C VER MUST BE WITHIN 6' OF FINISH GRADE>r. I'I500 PTIC INSPECTION PORT FIRST 2' TO BE LEVEL E� J 30l Z7S 30.8 I1I1 III II ) 23 . 6 OUTLET 24 HIGH CAPACITY INFILTRATOR g D -BOX CHAMBERS IN BED FORMATION AL H-20 ANK 6" CRUSHED STONE OR COMPACTED BASE ROF I L E : NOT TO SCALE 9" MINIMUM. 3' MAXIMUM COVER CLEAN SAND BACKFILL AROUND AND 2' OVER CHAMBERS SALT BOX RO01 D �x i t � r \ _4i \meq\\\ G� \ _- \ _ >\ ROLLOFF OLIMPSTER \\ G \FOR DEMOLITION DEBRIS � \ Te,6E PLACED IN THE \t \ `LEACH E*IST-IW OR1YEpAY 34 +34.4 CB/DH FND o � I I I 24 NIGH CAPACITy< \\ INFILTRATOR CHAMBERS +34.4 BANK BOAO Nt LOCUS V Q\ hh 0P n LOCUS MAP INVERT EL E VA T I ONS INVERT AT BUILDING: 32.7 INVERT IN SEPTIC TANK: 31.5 INVERT OUT SEPTIC TANK: 31.2-5 INVERT IN DIST. BOX: 30.97 INVERT OUT DIST. BOX: 30.8 INVERT IN LEACH CHAMBER: 30.62 BOTTOM OF LEACH CHAMBER: 29.7 ADJUSTED GROUND WATER: MIA OBSERVED GROUND WATER: N/A BOTTOM OF TEST HOLE *1: 23.1 CONSERVATION NO TES : I. THE WORK LIMIT SHOWN SHALL BE FITTED WITH STRAW WATTLES BACKED BY A DUG -IN FABRIC SILT FENCE. THE FENCE SHALL REMAIN IN PLACE UNTIL THE DISTURBED GROUND IS STABILIZED COMPLETELY. 2. NO CONSTRUCTION RELATED ACTIVITY SHALL OCCUR ON THE WETLAND SIDE OF THE WORK LIMIT. J. ROOF DRAINS SHALL BE DIRECTED TO SUITABLY SIZED DRYWELLS AND/OR STONE TRENCHES ALONG THE ROOF DRIP LINE FOR STORMWATER RUNOFF CONTROL. 4. INITIAL SOIL STABILIZATION WITHIN THE WORK LIMIT SHALL BE ACCOMPLISHED BY APPLICATION OF MULCH AND/OR LOAM AND SEED WEATHER PERMITTING. 5. ACCESS FOR DEMOLITION AND CONSTRUCTION SHALL BE VIA THE STREET SIDE OF THE PROPERTY WITH LIMITED ACCESS AS SHOWN AROUND THE PROPOSED DWELLING SITE. ~ -_L _� I , ' /\ /.• co 6. ALL DEBRIS SHALL BE LADED -FROM THE SITE -SAS -IT IS ' LEAH\ Pr 34.2 ( _ \tl / , PRODUCED AND TRANSPORTED TO A SUITABLE SOLID WASTE aM: FoRNER sr£v HANDLING FAC I L I TY. .-:: r. :. // by • / / \ EXISTING 410 SEPTIC TANK ?0 15 410 GALLON SEPTIC TANK co / 0 K ,%34.0 D eP \5 �� F� hR' kph /,-•�// / / / /// / //// s. le ++3X.4 / / , // / s 3f-0 ' / / / 6,A / /. , / 24/0 I' 24-6/ 11612/ DESIGN CRITERIA: DESIGN FLOW: 4 BEDROOMS AT 1/0 G.P.D. PER BEDROOM EQUALS 440 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REQUIRED: 440 G.P.D. X 200x - 880 GAL. SEPTIC TANK PROVIDED: 1500 GAL. MIN. SOIL ABSORPTION SYSTEM REQUIRED: DESIGN PERC RATE ( 5 MIN/INCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 440 GPD / 0.74 GPD/SF - 595 S.F. REQUIRED PROVIDED: 24 H16H CAPACITY INFILTRATOR CHAMBERS. 150'x 4.73 SF/FT - 709 S.F. 709 S.F. x 0.74 - 525 GPD SOIL TEST PIT DATA INDICATES�_ INDICATES PERCOLATION = OBSERVED TEST = GROUNDWATER TP *I 0' HORIZON TEXTURE COLOR 34.1 ® CB Q LOAMY IOYR -W- WATER LINE SAND 374 HYDRANT 9 GAS LINE 33.4 OVER HEAD WIRES B LOAMY 10 YR LIGHT POST --E- SAND 416 -T- 24' --------------------- 32.1 + 40.4 C I MEDIUM IOYR ........ 40------- EXISTING CONTOUR SAND 6/6 PROPOSED CONTOUR 40' 132' 1 NO WATER 23.1 DATE: JUNE 25. 2014 TEST BY: STEPHEN HAAS WITNESSED BY: AMY VONHONE PERC RATE: ( 2 MIN/INCH ���\SH OT Mq$S4CyG ANN WARNER N No. 38721 S GENERAL NOTES: I. THIS PLAN IS FOR THE DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL SYSTEM ONLY. 2. VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND MAINTENANCE OF THE SEPTIC SYSTEM SHALL CONFORM TO MASS. D.E.P. TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT TO VEHICULAR TRAFFIC OR GREATER THAN 3' IN DEPTH SHALL BE CAPABLE OF WITH- STANDING H-20 WHEEL LOADS. 5. ALL SEWER PIPE SHALL BE SCHEDULE 40 AVC OR APPROVED EOUAL 6. SEPTIC TANK AND D -BOX SHALL BE REINFORCED PRECAST CONCRETE OR APPROVED POLYETHYLENE. BOTH SHALL BE WATERTIGHT. D -BOX SHALL BE WATER TESTED FOR LEVEL WHEN THERE IS MORE THAN ONE OUTLET. 7. BEFORE CONSTRUCTION CALL 'DIG -SAFE'. 1 -888 -DIG -SAFE AND THE LOCAL WATER DEPT. FOR LOCATION OF UNDERGROUND UTILITIES. 8. EXISTING SEPTIC SYSTEM TO BE PUMPED DRY. REMOVED AND BACKFILLED - 9. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEED RESTRICTIONS OR ZONING REGULATIONS. IT SHALL REMAIN THE CLIENTS RESPONSIBILITY TO OBTAIN ALL PERMITS, SPECIAL PERMITS. VARIANCES ETC. FOR THIS PROJECT. 10. THE EXISTING DWELLING IS TO BE REMOVED DOWN TO THE FIRST FLOOR DECK. THE EXISTING FOUNDATION AND STEEL FRAME FOR THE SUN DECK TO REMAIN. LEGEND ® CB CONCRETE BOUND -W- WATER LINE PARCEL 4 I HYDRANT -G- GAS LINE - OHW- OVER HEAD WIRES V LIGHT POST --E- UNDERGROUND ELECTRIC LINE -T- UNDERGROUND TELEPHONE LINE - CTV- UNDERGROUND CABLEVISION LINE + 40.4 SPOT ELEVATION ........ 40------- EXISTING CONTOUR P-01 PROPOSED CONTOUR S 1 TE PLAN OF LAND 07 SAL T BOX ROAD. MAP 8 / PARCEL 4 I SOUTH YARMOUTH. MA. PREPARED FOR : RON L UKASEV I CZ SCALE: I- 20' JANUARY 7. 2015 STEPHEN A. HAAS ENGIN E E R I N G, INC ' //• �r P.O. Box 16 JAN 092015 �j�i%� / 1\��` South Dennis, MA 02660 ( 508) 362-8132 HEALTH DEPT. '7 o /0 20 40 % � /l � d .�`"i'►a'� u fall �@ 1'�1 F-3, it, 15 99 Yarmouth Conservatior r, Commiss� inn MAR 11 201511 2015 RECEIVED JOB N0: 14-030