Loading...
HomeMy WebLinkAbout96 Salt Box Road - Site & Sewage PlanASSESSOS MAP. 71 PARCEL- W3 KEY: CURRENTI ZONING: EXISTING CONTOUR: - - - - Ro� R-25 (159 SUBDIVISION) PROPOSED CONTOUR: ............•••••.......•••••• ti o 2R BUILDING SETBACKS: EXISTING SPOT ELEVATION: 25.5 $g � F. .0' : 6' R: 20' PROPOSED SPOT ELEVATION --F2-51 TEST HOLE: 4� g10 gox R s� 4C� UTILITY POLE: -O- FLOOD ZONE: C 'B & A6 (EL 7) FENCE LINE: - LOCUS ��`�y HYDRANT: -6 RETAINING WALL: TREE: t2 LOCATION MAP LOT AREA ss 23,416 f S.F. (0.54 + AC.) 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND 37' s tr z 2 DEEP llr FROM RESERVE TO TOP OF COASTAL BANK) S 29 28 \ 12 i 0 . .... ' -27' ` 28 -o- . 3 \ '79 A D / i...' ....1... 79.4 25. . J EDGE OF PAVE ` - :. 54� _ ' 30 BENCHMARK AT ''• 111 syi g ' , s! 32 CONCRETE BOUND _' ELEVATION m 26B 0. - - =8/- 33 ING x ING 1.54 COAPSOTAL BANK fOD� J�OOD aL" 70 4.0 0 10- 20, 30' 40' 50 SECTION D - D TEST HOLE LOGS ENGINEER: 2258-21.52 21ST. WITNESS: AMY VON HONE, R.S. DATE: 3-18-98 PERCOLATION RATE: < 2 MIN/IN solo25.0 4A ELEV. LOAMY SAND LOAMY SAND IOYR 4/4 32 4ggEyLIN� gs0 34 20.0 TOP OF AND - _ _ _ _ 20a SAND 15A g9 25A 30' i' 9J C HORIZON 10A.....KIQ COASTAL I.S/R I1AOD dLr 7D BANK S AIDE I g.0Y - 4- 2.5Y 7/3 DRAINAGE- - 0 to 20' 30 40 50' EASEMENT SECTION A - A \k b9' 1S ��x.33 A _ _-� AA�,_2i•26 227� .yc P 3z' - - r.n...�4tt11.YfT �ft7�ri.. R. � 2s 30.0 4.18' so -r so _-o _222_ 25.0 _.a _ __ _ 28-_ _- - - - - - 20.0 15.0 g99• COP TO OF _ _- ---- - _2 8 6COAS-FAL COASTAL BANK ----- -Y6f0.0 Kg71m rwo aLr 7D BANK E -, 2440 24-- 0 fa 20, 30' 401 50' ------ -2 -- - -_ -_ SECTION B - B 20_ _ _ -, _ _ - ___ `-r= _ '_-_�- _-20 14- ' - - - _ - -� -_- -_-_- - 14 ' - 212-2027 24'!. 3B _- _- _- _- Z Z7 12 f2- __� -0 30A - - _--------'_--'-- _-- -- 10- _ ------ _ _ _ - 25.0 _- __ __ - _--I - ---.:z-f0 _ 8 8.- -'_- ---------------- 20.0 TOP OF 6- �__ _- ______ _- 15A 't?' COASTAL BANK ..... .nnnn -n-n.nn..-u - f0A 1QQ /JF rZMD ILr7A _ r r EDGE OF MARSE .............. 4 4.0- 0 10' 20' 30' 40' So• - 2 IME HIGH_ _ 2 WATER SECTION C - C 12a+ -- -- _� r......r nnnnnn-... r.rnnnn unu nn.n . .n 0} MARSH ' . ,..,1 .............. EDGE ................... SECTION D -D .70.0 2011-1921 4I - f9S r% SECTION B -B BASS R'rV R 25D ►/ SECTION A -A 20.0 .L SECTION C -C 1.54 COAPSOTAL BANK fOD� J�OOD aL" 70 4.0 0 10- 20, 30' 40' 50 SECTION D - D TEST HOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. WITNESS: AMY VON HONE, R.S. DATE: 3-18-98 PERCOLATION RATE: < 2 MIN/IN TH-128A TH-2 ELEV. LOAMY SAND LOAMY SAND IOYR 4/4 27D 10" 10YR 4/4 B HORIZON B HORIZON AND SAND lOYR I 25A 30' ��/8 C HORIZON C HORIZON FINE -MED SAND D SAND 8� 2.5Y 7/3 7/3 NO GROUNDWATER ENCOUNTERED NOTES: 1. VERTICAL DATUM. NCVD 2. MUNICAPAL WATER IS AVAILABLE. 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 4. ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 LOADING SPECIFICATIONS. 5. PIPE PITCH = 1/4" PER FOOT, (UNLESS NOTED OTHERWISE). 28.0 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. ELEV. 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE USE OF A GARBAGE DISPOSAL. 272 8. ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL 25B HEALTH REGULATIONS. 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR TO CONSTRUCTION. 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO EXCEED 3.0. 11. ALL UNSUITABLE SOIL (A & B HORIZON, APPROX. 36" DEEP) WITHIN S OF 18.0 PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH CLEAN MEDIUM SAND. 12. WORK LIMIT LINE TO BE DOUBLE STAKED HAY BALES OR SILT FENCE. LINE TO BE STAKED PRIOR TO CONSTRUCTION. 13. ROOF RUN-OFF TO BE DIRECTED TO DRYWELLS OR STONE TRENCHES AT DRIP LINES. SEPTIC SYSTEM DESIGN 14' ALL DISTURBED AREAS TO BE REVEGETATED OR MULCHED UPON COMPLETION OF PROJECT. FLOW ESTIMATE: A- BEDROOMS AT 110 GAL/DAY/BEDROOM = 440 GAL/DAY SEPTIC TANK: 440 CAL/DAY x 2 DAYS - 880 CAL USE 1500 GALLON SEPTIC TANK LEACHING AREA: USE 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37' x 11 x 2' DEEP) SIDE AREA.' (37 + 11)2 x 2 = 192 SF (.74) = 142 GAL/DAY BOTTOM AREA. 37'x 11' = 407 SF (74) = 301 GAL/DAY CAPACITY= 443 GAL/DAY SEPTIC SYSTEM SECTION 33.0 TOP OF FOUNDATION 28 O 1500 CAL ELEV. SEPTIC TANK 285 (6" OF STONE UNDER OR ELEV. MECHANICALLY COMPACTED) TEE SIZES. INLET: 6" UP, 13" DOWN OUTLET: G" UP, 14" DOWN DM DEMAREST-McLELLAN ENGINEERING 24 SCHOOL STREET P.O. BOX 463 DM 98-038�D28F5 WEST DENNIS, MASSACHUSETTS 02670 i PHONE # TAX. (508) 398-7710 ED BY: N CIVIL M COVERS WITHIN 12" OF FINISHED GRADE ONE COVER TO BE WITHIN OF GRADE) ,27.75 t;==a ELEV. D -% BOX 5 27.67 (6" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE AT OUTLET TEE DATE. ft w1v THOMAS McLELLAN, P.E. JOHN Z. DEMAREST JR., P.L.S 26.5 ELEV. 1S iT DECK 12 24 S 24' PROPOSED 4 BEDROOM 24, DWELLING 76' 18 Y PRCH 4' 26' 14 fz 8' 27' GARAGE 2F PROPOSED DUELLING 2" PEASTONE 3/4" - 1 V2 - WASHED STONE i- ELEV: 27.0 /1:1 --Fl 24.5 > <4 ELEV. E- 37' -� 4 INFILTRATORS (MAXIMIZER CHAMBERS) WITH 4' OF STONE ALL AROUND (37' x 11" x 2' DEEP) SITE AND SEWAGE PLAN LOCATION.• LOT W3 SALT BOX ROAD SOUTH YARMOUTH, MA PREPARED FOR DAM HEALY SCALE. 1" = 30' DATE: 5113198 REFERENCE: PLAN BOOK 154 PAGE 29 REVISED: 7-8-98 REVISED: 6-9-98