HomeMy WebLinkAbout123 Seaview Avenue - Septic DesignEMCHMAwl
TOP OF FOUNDATION
FRONT ELEV. = _10C
BACK ELEV. = 89.88
3.00 FRONT
3.12 BACK
LEV. = _96.88
BACK
4
5
10 FT. MINIMUM
4" CAST IRON PIPE
(OR EQUAL) MINIMUM
PITCH 1/4" PER FT.
ELEV. = X72_
FRONT
ELEV. = --95---30--
SEWAGE DISPOSAL
NOT TO
MANHOLE
COVERS
4" SCHEDULE 40 PVC PIPE
MIN. PITCH 1/8" PER FT.-
ELEV.
_95.00
0
CLEAN SAND
INSPECTION PORT
c 2" LAYER OF
\ 1/8" TO 1/2 " /2" ^ \
101.55 MIN. \WASHED STONE (� VENT
1
o+
PUMP SWITCHES DETAIL
A L A1800 FIL�F' ER ELEV. = J 6"SUMP L LEVEL ELEV.
ELEV. = -100.6--
FLOW LINE 1("C+'rplB��oAIELEV. ALARM ON
_TMlIN. 3/8" DRILL RBOX 'V_100.38_ 15STANDARD INFILTRATORS 3" 0.25'
I GAS HOLE WTH STONE IN AN jy PUMP ON
BAFFLE N TO BE WATER TESTED 34' X 18' X r FIELD FORMATION WELL M1W 29 �- _
ELEV. = 95_05_ 18' 1.50'
o (TO BE PLACED ON FIRM BASE) SOIL ABSO PTION INDEX 15 S PUMP OFF 042' 1
CHECK 3/4' TO ? 1/2' 1.25'
VALVE WASHED STONE SYSTEM SAS, Nc' ADJUST_ �- t0• 0.93'
(Tu/BE PLACED ON FIRM BASE)
MYERS SRM 4
z
SOIL TEST
DATE OF SOIL TEST NOV._1 1997 _
SOIL TEST DONE BYSWEETSER ENGINEERING
WITNESSED BY 1-1=_______
08SMAMIN HOLE i ELEV.-_j_8_3
PERCOLATION RATE _ MIN./INCH AT 26 -__ INCHES
DEPTH
HORIZ
I TEXTURE
COLOR
MOTT.
OTHER
0-9
A
LOAMY
10YR2/2
(11X8.16X 6 0 X 64.0)
26,020 LBS.
(9X5.25X 8.0 X 64.0)
18,144 LBS.
SAND
21,230 LBS
WEIGHT OF TANK PER MANUFACTURER
14,500 LBS.
9-19
B
LOAMY
t0YR5/8
(11X6.16X1X(135-84))
FEW COBBLES
(9X5.25X14,M2X(135-84))
3,913 LBS.
SAND
20 LBS.
EXCESS WEIGHT TO OFFSET FLOTATION
269 LBS
19-72
C
MEDIUM
t0YR5/6
LOCATION M:A:p::=
I REVISED
REPLUV3
SAND
500 GALLON PUMP 0.4 HP (MAX.)(QR EQUAL)
EPTIC TANK (50 GPM W/11' HEAD) USGS PROBABLE WATER TABLE ELEV. = _��.9 _ WATER ENCOUNTERED AT 427 ELEV. _ _ 94_8�IO_
BER 0" CONCRETE OBSERVED WATER TABLE ( 11/ 1 /97) ELEV. = _J14&_
C
BOTTOM TEST HOLE ELEV. = ��3 - LEGEND: DESIGN CALCULATIONS
p" CONCRETE NUMBER OF BEDROOMS 2 EACH UNIT _4._
ELEV. AT INVERT INLET _95.00_ PUMP CHAMBER CALCULATIONS: EXISTING SPOT URELE--ON 00.0 GARBAGE DISPOSAL UNIT NO
SYSTEM PROFILE EXISTING CONTOUR----00----
ELEV. AT ALARM ON _ 950_ TOTAL ESTIMATED FLOW
ELEV. AT PUMP ON -92.25- REQUIRED FLOW PER CYCLE .25 X 444 - _IQ_ GAL./CYCLE FINAL SPOT ELEVATION 0 4 440
VOLUME PER CYCLE _7��_ GAL CY FINAL CONTOUR (110 GAL/BR./bAY X _ BR.) _ _ GAL./DAY
SCALE ELEV. AT PUMP OFF 91.83_ / CLE /7.48 GAL./CU. FT. _ _14.71_ CU. FT./CYCLE REQUIRED SEPTIC TANK CAPACITY _880 GAL.
VOLUME OF WATER IN PIPE 3.14 X 0.00694 X _ 13FT. = 0,�8 CU. FT. SOIL TEST LOCATION _]0p GAL.
BOTTOM OF INSIDE PUMP CHAMBER 91.00_ ACTUAL SIZE OF SEPTIC TANK
BOTTOM OF OUTSIDE PUMP CHAMBER _90_54_ TOTAL MINIMUM VOLUME PER CYCLE ,4,9$- CU. FT. UTILITY POLE -0- CAPACITY OF SEPTIC TANK
TOWN WATER �-W� W - _L.'�Q9_ GAL.
DISCHARGE _14.99 CU. FT. / 36.11 CU.FT./FT. _ _0_42_ FT. (1000 G.S.T.) / \ SO,L CLASSIFICATION
CAPACITY ( 440__ GAL./DAY /7.48 GAL./CU.FT./36.11 CU.FT./FT. _ _1.63_ FT CATCH BASIN V�J.:.1_
_143_ REQUIRED _150_ PROVIDED GAS LINE G DESIGN PERCOLATION RATE :5-5- MIN./IN.
CESSPOOLO C.P. EFFLUENT LOADING RATE 0,74_ GAL./DAY/S.F.
CLEANOUT 0. LEACHING AREA 118,44 SO. FT.
16. EXISTING CESSPOOLS ARE TO BE PUMPED AND REMOVED.
17. WATER SERVICE TO REAR BUILDING IS TO BE RELOCATED AS SHOWN
AND IS TO BE SLEEVED INSIDE 150 PSI PRESSURE PIPE.
18. DESIGN ENGINEER IS TO INSPECT AND CERTIFY THE CONSTRUCTION
OF THE SEPTIC SYSTEM.
19. VARIANCES TO TITLE 5 AND YARMOUTH REGULATIONS:
A. SOIL ABSORPTION SYSTEM LESS THAN 15' FROM CRAWL SPACE.
B. SOIL ABSORPTION SYSTEM LESS THAN 10' FROM LOT LINE
C. NO WATER TABLE ADJUSTMENT
D. SOIL ABSORPTION SYSTEM LESS THAN 10' FROM VAULT
E. WATER SERVICE LESS THAN 10' FROM SEPTIC TANK AND PUMP CHAMBER,
F. NO RESERVE AREA
20, CONTRACTOR TO PROVIDE SHORING AS NECESSARY TO PROTECT
BUILDINGS AND ABUTTING PROPERTY.
LIMIT OF
5' OVERDIG
BOUYANCE CALCULATIONS:
1500 GALLON SEPTIC TANK (H20)
1000 GALLON PUMP CHAMBER (1120)
WEIGHT OF WATER DISPLACED
WEIGHT OF WATER DISPLACED
• 98.7
(11X8.16X 6 0 X 64.0)
26,020 LBS.
(9X5.25X 8.0 X 64.0)
18,144 LBS.
WEIGHT OF TANK PER MANUFACTURER
21,230 LBS
WEIGHT OF TANK PER MANUFACTURER
14,500 LBS.
WEIGHT OF 12" OF CONCRETE ON TOP OF
TANK
WEIGHT OF 14" OF CONCRETE ON TOP OF
TANK
(11X6.16X1X(135-84))
4,810 LBS.
(9X5.25X14,M2X(135-84))
3,913 LBS.
EXCESS WEIGHT TO OFFSET FLOTATION
20 LBS.
EXCESS WEIGHT TO OFFSET FLOTATION
269 LBS
98r
28
RDU�
Ki
LOCUS
0 SoUTN 5HO
'
NANTUCKET
SOUND
PROPOSED SEPTIC DESIGN
JAMES G SABEN
5016
• 98.7
PROJECT LOCATION 1DT 71
123 SEAVIETWT AVE(., YARIAOUTH
154.99' TEST
99.9
SF"EZ'T'3ER ENGRVEMIG
235 GREAT WESTERN ROAD
508- SOUP.
OUT. BOOX 71 ASS.
398-3922 02660
100.0
C. 0.
DATE MAY 2, 2003
scALE 1" = 20'
-
JOB N0. 4039-00
REVISED
C.O.
34.00' 0
LOCATION M:A:p::=
I REVISED
REPLUV3
0
BATH KIT
L _
D.
BED
269' f
LIV
0
LIV
W
JI
z
(98)
HALL
• 99.5
97.9
? -
^
BATH,
BED 1 gcD
`
0.- 1 1
KIT
i
LLI
>
97.8
'
1
_
BED
Q
VENT
1i
O
C.O.
~
9
4
f `
^
C.O. C.Q.
99.4
W
A
98.5
DRIVE
• •�'��MJ 99.
99.2
Q
-
15512' - --"
W
1500 GALLO.
SEPTIC TA t UMP
99.3
HAMBER
ELEV. _ _ 100.83
DOUBLE 6 ML I ELEV.
POLY UNER
ELEV. = __0M_
WALL SCHEMATIC
(SEE CONSTRUCTION PLANS
AND INSPECTION SCHEDULE)
(18X34)
LEACHING CAPACITY (AREA X RATE) ,8268 GAL./DAY
612.00 X 0.74
RESERVE LEACHING CAPACITY NONE GAL./DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR
THE SUBSURFACE DISPOSAL OF SEWAGE.
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN 6" OF FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF
WTHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE.
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR
IS TO CALL "DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY.
B. PARCEL IS IN FLOOD ZONE Al2EL. 10.0)
9. LOT IS SHOWN ON ASSESSORS MAP �5 _ AS PARCEL
10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS.
11. ALARM IS TO BE BOTH AUDIO AND VISUAL.
12. A ZABEL A1800 FILTER IS TO BE INSTALLED.
13. AN ELECTRIC PERMIT IS REQUIRED TO WIRE PUMP AND ALARM.
14. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND
FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE
REPLACED WTH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3).
15. SEPTIC TANK AND PUMP CHAMBER ARE TO BE WATERPROOFED AT
THE MANUFACTURER.
APPROVED: BOARD OF HEALTH
DATE
AGENT
4039 -00 -DWG 02003 SWEETSER
28
RDU�
Ki
LOCUS
0 SoUTN 5HO
'
NANTUCKET
SOUND
PROPOSED SEPTIC DESIGN
JAMES G SABEN
PROJECT LOCATION 1DT 71
123 SEAVIETWT AVE(., YARIAOUTH
SF"EZ'T'3ER ENGRVEMIG
235 GREAT WESTERN ROAD
508- SOUP.
OUT. BOOX 71 ASS.
398-3922 02660
DATE MAY 2, 2003
scALE 1" = 20'
JOB N0. 4039-00
REVISED
LOCATION M:A:p::=
I REVISED
SHEET 1 OF 1
4039 -00 -DWG 02003 SWEETSER