HomeMy WebLinkAbout123 Seaview Avenue - Septic Design 3? l 4" SCHEDULE 40 PVC PIPE
TOP OF FOUNDATION 20 FT MINIMUM FROM CELLAR MIN. PITCH 1/8" PER FT.
FRONT ELEV. 700.0 10 FT. MINIMU ' FROM SLAB OR CRAWL SPACE
1C FT. MINIMUM 2" PRESSURE PIPE
ACK ELEV. = 99.@8 _ 150 PSI MINIMUM ELEV.
M NHOLE r 95.00 0 MAX.
3.00 FRONT I 4" CAST IRON PIPE
3.12 BACK (OR EQUAL) MINIMUM
PITCH 1/4" PER FT.
�-ELEV. _ --Mo--
ELEV. = 96_88 _ FRONT
BACK ELEV. _ _95•30-
0"
SEWAGE DISPOSAL Sl'
NOT TO SCALE
CLEAN SAND
INSPECTION PORT
2" LAYER OF
t/8` TO 1/2"
WASHED STONE VENT
I 101.55 MIN.
PUMP S
16.
EXISTING CESSPOOLS ARE TO BE PUMPED AND REMOVED.
BOUYANCE CALCULATIONS.
--- fAi-j_.
° °
WATER SERVICE TO REAR BUILDING IS
TO BE RELOCATED AS SHOWN
°
C.
0
1000 GALLON PUMP CHAMBER (H2O)
v
1800 IL
ND IS TO BE SLEEVED INSIDE 150 PSI
PRESSURE PIPE,
':. LEVEL
ELEV. = 6` SUMP ELEV. = 100.80_
°
WEIGHT OF WATER DISPLACED
7'
°
18.
ELEV. 99_80_
CERTIFY THE CONSTRUCTION
(11X6.16X 6.0 X 64.Cn
OW LINE
(9X5.25X 6.0 X 64.0)
18.144 IBS
RED %B£D
YS
OF THE SEPTIC SYSTEM.
T'ITRIB1 TIONELEV.
WEIGHT OF TANK PER MANUFACTURER
21,230 LBS.
p
14,500 LBS.
ALARM ON
VARIANCES TO T1 5 AND YARMOUTH REGULATIONS:
WEIGHT OF 12" OF CONCRETE ON TOP OF
TANK
WEIGHT OF 14" OF CONCRETE ON TOP OF
TANK
A.
SOIL ABSORPTION SYSTEM LESS THAN
15' FROM CRAWL SPACE.
(11X8.76X1X(135-84))
LJ 1 f� V =
(9X5.25Xt4/12X(135-84))
3,913 LBS
'{S{r�
SOIL ABSORPTION SYSTEM LESS THAN
10' FROM LOT LINE
3' ,
20 LBS.
EXCESS WEIGHT TO OFFSET FLOTATION
269 LBS.
C.
NO WATER TABLE ADJUSTMENT
�.w
_
3/8" DRILL BOX -
15 STANDARD INFILTRATORS
WTH STONE IN AN
Z
y1
10' FROM VAULT
PUMP ON 025
GAS
= BAFFLE95.05_
E.
N
SEPTIC TANK AND PUMP CHAMBER.
HOLE
TO BE WATER TESTED
BE PLACED ON FIRM BASE)
34' X 18' X 7' FIELD FORMATION
N
i�
ONE MlW 9
19'
NO RESERVE AREA
b' 0.42'
1.5C
20.
CONTRACTOR TO PROVIDE SHORING AS NECESSARY TO PROTECT
HAMBER
(TO
SOIL ABSORPTION
Z�
O NDEX-
DINGS AND ABUTTING PROPERTY.
15
PUMP OFF
1.25'
CHECK 3/4" TO 1 1/2"
VALVE WASHED STONE
SYSTEM (SAS)
�0 ADJUST
10' 0,83'
ON FIRM BASE)
'90ED
GALLON
MYERS SRM 4
HP EQUAL)
IC TANK
W/11(OR
(50 GPM W/11' HEAD)
PUMP (5
USGS PROBABLE WATER TABLE ELEV. = 98s9 _
OBSERVED WATER TABLE ( 1/97) ELEV. _
0" CONCRETE
_94.8__
LEGEND:
CHAMBER
T
BOTTOM OF TEST HOLE ELEV. _ _82,3_._
;RETE
PUMP CHAMBER CALCULATIONS:
EXISTING SPOT ELEVATION 00„0
ELEV. AT INVERT INLET 95-00_
_
EXISTING CONTOUR ----00----
_M PROFILE
ELEV AT ALARM N 9
AT PUMP ON 92.25
FLOW PER CYCLE .25 X 440 = _1L_ GAL./CYCLE
FINAL SPOT ELEVATION 00
FINAL CONTOUR 00
ELEV.
VOLUME PER CYCLE -114_ GAL/CYCLE /7.48 GAL./CU. FT. = 14J1_ CU. FT./CYCLE
SOIL TEST LOCATION Q
ELEV: AT PUMP OFF _91_83_
VOLUME OF WATER IN PIPE 3.14 X 0.00694 X �3FT. _ _0.28- CU. FT.
UTILITY POLE --C-
BOTTOM OF INSIDE PUMP CHAMBER _91.00_
TOTAL MINIMUM VOLUME PER CYCLE 14,98_ CU, FT.
TOWN WATER aWW
BOTTOM OF OUTSIDE PUMP CHAMBER -90_50_
DISCHARGE _7499 CU. FT. / 36.11 CU.FT./FT. _ _P_42_ FT. (1000 G.S.T.)
CATCH BASIN / \
STORAGE CAPACITY ( 44Q_ GAL./DAY /7.48 GAL./CU.FT./36.11 CU.FT./FT. _ _�_ _ FT.
\®7
GAS LINE G
_L41- REQUIRED 2,50 PROVIDED
CESSPOOL O C.P.
CLEANOUT C.O.
16.
EXISTING CESSPOOLS ARE TO BE PUMPED AND REMOVED.
BOUYANCE CALCULATIONS.
--- fAi-j_.
17.
WATER SERVICE TO REAR BUILDING IS
TO BE RELOCATED AS SHOWN
1500 GALLON SEPTIC TANK (H2O)
C.
0
1000 GALLON PUMP CHAMBER (H2O)
BED LIV
ND IS TO BE SLEEVED INSIDE 150 PSI
PRESSURE PIPE,
WEIGHT OF WATER DISPLACED
WEIGHT OF WATER DISPLACED
99.5
18.
DESIGN ENGINEER IS TO INSPECT AND
CERTIFY THE CONSTRUCTION
(11X6.16X 6.0 X 64.Cn
26,020 LBS.
(9X5.25X 6.0 X 64.0)
18.144 IBS
RED %B£D
YS
OF THE SEPTIC SYSTEM.
JOB N0. 4039-00
WEIGHT OF TANK PER MANUFACTURER
21,230 LBS.
WEIGHT OF TANK PER MANUFACTURER
14,500 LBS.
19.
VARIANCES TO T1 5 AND YARMOUTH REGULATIONS:
WEIGHT OF 12" OF CONCRETE ON TOP OF
TANK
WEIGHT OF 14" OF CONCRETE ON TOP OF
TANK
A.
SOIL ABSORPTION SYSTEM LESS THAN
15' FROM CRAWL SPACE.
(11X8.76X1X(135-84))
4,810 LBS.
(9X5.25Xt4/12X(135-84))
3,913 LBS
B.
SOIL ABSORPTION SYSTEM LESS THAN
10' FROM LOT LINE
EXCESS WEIGHT TO OFFSET FLOTATION
20 LBS.
EXCESS WEIGHT TO OFFSET FLOTATION
269 LBS.
C.
NO WATER TABLE ADJUSTMENT
�.w
°
of
IN •�_����
_
99.
D.
SOIL ABSORPTION SYSTEM LESS THAN
10' FROM VAULT
155,72'
E.
WATER SERVICE LESS THAN 10' FROM
SEPTIC TANK AND PUMP CHAMBER.
1500 GALLON,
F.
NO RESERVE AREA
SEPTIC
20.
CONTRACTOR TO PROVIDE SHORING AS NECESSARY TO PROTECT
HAMBER
SUI
DINGS AND ABUTTING PROPERTY.
ASPHALT COAT
do DOUBLE 6 ML
POLY LINER
ELEV. = 100.83
ELEV. _ _98.5--
LIMIT L :
5' MIT DI OF
ELEV.
-SQL _ WALL SCHEMATIC
154. 9,9, --- _-- 100.0
98.7 99 9 (SEE CONSTRUCTION PLANS
C. 0. - AND INSPECTION SCHEDULE)
C.O. 34 DO'
REoLUM6 _
W
LLJ
Q
99.4 W
W
99.3
z
SOIL
A 7H KIT
-`.
--- fAi-j_.
_
26.9' t
WITNESSED BY
OMMAWN HOLE 1
C.
0
PERCOLATION RATE << 2 MIN./INCH
BED LIV
i
LIV
SAND
O -J
HALL
99.5
97.9
? -
LOAMY
IOYR5/8
BATN1
FEW COBBLES
RED %B£D
SAND
JOB N0. 4039-00
0. KIT
97.8
C
1 _
10YR5/6
BED
LOCATION MAP
REVISED
a
VENT�-
-
• -�
� C.O.
i
-
C.O.
C.O.
►,
97.4
\
98.5
DRIVE
�.w
°
of
IN •�_����
_
99.
99.2
IJ
155,72'
I
1500 GALLON,
SEPTIC
HAMBER
W
LLJ
Q
99.4 W
W
99.3
z
SOIL
TEST
DATE OF SOIL TEST
NOV. 1. 1997____
SOIL TEST DONE BY
SUK-R ENGINEL ING
WITNESSED BY
OMMAWN HOLE 1
ELEV.=_ 98_3
PERCOLATION RATE << 2 MIN./INCH
AT 26 INCHES
DEPTH
HORIZ 1
TEXTURE
COLOR
MOTT.
OTHER
0-9
A
LOAMY
10182/2
PROJECT LOCATION
LOT 'yl
123 SEAVIE {I AVE., YARMOUTH
i
SAND
S imsm? TGIF � dG
235 GREAT WESTERN ROAD
P. 0. BOX 713
398-3922 SOUTH DENNIS, MASS. 02660
9-19
B
LOAMY
IOYR5/8
DA's M AY 2, 2003
FEW COBBLES
SAND
JOB N0. 4039-00
I REVISED
19-72
C
MEDIUM
10YR5/6
LOCATION MAP
REVISED
SAND
WATER ENCOUNTERED AT 42 _ ELEV. _
DESIGN CALCULATIONS
NUMBER OF BEDROOMS 2 EACH UNIT _ 4_
GARBAGE DISPOSAL UNIT NO
TOTAL ESTIMATED FLOW
(110 GAL./BR./bAY X 4 BR.) _L49_ GAL./DAY
REQUIRED SEPTIC TANK CAPACITY 880 GAL.
ACTUAL SIZE OF SEPTIC TANK -1500_ GAL.
CAPACITY OF SEPTIC TANK GAL.
SOIL CLASSIFICATION
DESIGN PERCOLATION RATE <b._ MIN./IN.
EFFLUENT LOADING RATE 4,74_ GAL./DAY/S.F.
LEACHING AREA -f13_0Q SQ. FT.
(18X34)
LEACHING CAPACITY (AREA X RATE,) 452_68 GAL./DAY
612.00 X 0.74
RESERVE LEACHING CAPACITY NONE GAL./DAY
NOTES:
1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P.
TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR
THE SUBSURFACE DISPOSAL OF SEWAGE.
2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO
WITHIN 6" OF FINISHED GRADE.
3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF
WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR W"THIN
10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE
USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS.
4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL
BE MORTARED IN PLACE. 1 1
5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH
DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO
OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY.
6, UTILITiES SHOON ARE APPROXI!dA-- ONLY EXCAVATION CONTRACTnP
IS TO CALL "DIG-SArE" AT 1-888-344-7233 AT LEAST 72 HOURS
PRIOR TO COMMENCING WORK ON SITE.
7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS
SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIATION
IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER
IMMEDIATELY.
8. PARCEL IS IN FLOOD ZONE Al2SEL_10.0)
9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL
10. PUMP AND ALARM ARE TO BE ON SEPERATE CIRCUITS.
11. ALARM IS TO BE BOTH AUDIO AND VISUAL.
12. A ZABEL A1800 FILTER IS TO BE INSTALLED.
13. AN ELECTRIC PERMIT IS REQUIRED TO 'MRE PUMP AND ALARM.
14. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND
FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE
REPLACED WITH MATERIAL AS SPECIFIED IN 310 CMR 15.255:(3).
15. SEPTIC TANK AND PUMP CHAMBER ARE TO BE WATERPROOFED AT
THE MANUFACTURER.
APPROVED: BOARD OF HEALTH
DATE
AGENT
C.•
UW ,'
GINEERING
R001,F 28
LOCA'
0 SOUTH SORE
'
NAN7UCK£T
SOUND
PROPOSED SEPTIC DESIGN
FOR
I JAMES SABEN
PROJECT LOCATION
LOT 'yl
123 SEAVIE {I AVE., YARMOUTH
i
S imsm? TGIF � dG
235 GREAT WESTERN ROAD
P. 0. BOX 713
398-3922 SOUTH DENNIS, MASS. 02660
DA's M AY 2, 2003
JOB N0. 4039-00
I REVISED
SHEET 1 OF 1
LOCATION MAP
REVISED
C.•
UW ,'
GINEERING