Loading...
HomeMy WebLinkAbout2 Shore Road - Plot Plan 4BENCHMARK TOP OF FOUNDATION ELEV. = I ��vo \ 20 FT. MINIMUM SOIL TEST - T. MINIMUM CLEAN SAND DATE OF SOIL TE$T Dero'; 9- �99 WITNESSED BY CONCRETE PERCOLATION RATE < t MIN./1NCH. COVERS 4" SCHEDULE 40 PVC PIPE OBSERVATION HOLE 1 OBSERVATION HOLE 2 - MIN. PITCH 1/8" PER FT. 2 LAYER OF \ 1/8" T0.1/2" ELEV.= /4 8 ELEV.= 12" MAX. WASHED STO 0 TOP AND - LEVEL 4" CAST IRON PIPE I yENr - —.1p" SUBSOIL PROJECT LOCATION PROJECT (OR EQUAL MINIMUM SWEETSERENGINEERING 235 GREAT STEN ROAD SOUDENNIS,�MASS.398-3922 02660 SCALE " O, DATE PITCH 1/4 PER FT.42alh%_ \15 REVISED FREVISED ELEV.s C v. /'r, C LOCATION MAP '09 N0. O DO SHEET / OF FLOW UNE — R• (e r n vaMe Rr 10" --_ _ ELEY+ 1%.j,- O O O ELEV. _ MIN. ig• ELEV. o o 0 0 o 12" S zone ELEVm e OP ELEV. = 7 , ELEV. _ _t7� V. 8's e ° e° ° o ° o e °o a e 8 ° e ° ° 0 6" E EV_ 7.O C%6 'l•� _ WATER AT EL= WATER AT EL= DISTRIBUTION 10,x 38'x 1.5' BOX DESIGN CALCULATIONS SOO GALLON TO BE WATER TESTED 3/4" TO 1 1/2" ;! NU6BER OF BEDROOMS WASHED STONE GARBAGE DISPOSAL UNIT SEPTIC TANK TOTAL ESTIMATED FLOW (.110 GAL/BR./DAY X SR.) �G 0 GAL/DAY OBSERVED WATER TABLE ELEV. _ A•8 REQUIRED SEPTIC TANK CAPACITY �5:0 GAL ACTUAL SIZE OF SEPTIC TANK ,)o'rr A/O 7-0 3��LEACHING AREA REQUIREMENTS 3eel.)A 7-1 D r1 L SIDEWALL AREA S GAL/S.F. SEWAGE DISPOSAL SYSTEM PROFILE BDTTOM AREA 1.0 GAL/S.F. 7yo GAL/DAY NOT TO SCALEIfACHING CAPACITY (BOTTOM + SIDEWALL) o �)Pr/ c�96x/ sx r•S� LEGEND: RESRVE LEACHING CAPACITY ! GAL%OAY EXISTING SPOT .ELEVATION " OOxO FFIINIAL SPOT ELEVATION--oo--- NOTES: I FINAL CONTOUR -- 00 SOIL TEST LOCATION 1. All- WOP.:MANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. r C UnLITY POLE -o- TITLE 5 .WD THE TOWN OF YARinourA! RULES AND REGULATONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. TOWN WATER—�WW•�� 2 ALL CORS TO SANITARY UNITS SHALL BE BROUGHT TO I;- ur} . + • ! \\ CATCH BASIN r/ W1TW4 1 Z' OF FINISHED GRADE. 3. EXISTING,AND FINAL GRADES SHALL REMAIN ESSENTIALLY THE SAME. S' .f�y�5 �. j rrr rrn,..rrrw n' q r r�rlT .F� ^"jirl! GL!.Aia. BF CAPADLc'' O� .'J IJr•RC. _� H 10"LOADING UNLESS 'THEY ARE UNDER OR YIIT}{1N Cj 4 �.- .L�fT �;•.i Il. --BOARD CR'HEALTH AND DESIGN ENCINEER SPALL INSPECT THE 10 FT 0. DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE CONSTRV:TION OF THE SEPTIC SYSTEM ON THE FOLLOWING USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4 r Isoo INSPECTION SCHEDULE: 5. ANY MASONARY UNITS USED TO BRING CODERS TO GRADE SHALL ' SF°' INSP.'r WHEN THE EXCAVATION IS COMPLETE. BE MORTARED IN PLACE. INSP. #2 DURING PLACEMENT OF CLEAN FILL 6. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH INSP. #3 AFTER COMPONENTS OF SEPTIC SYSTEM, ARE PLACED, DEEDED OR ZONING REGULATIONS, OWNER / APPLICANT IS TO G a 12. DESIGN EfIGINEER SHALL CERTIFY TO THE HEALTH DEPARTMENT THAT OBTAIN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. r / THE EXCAVATION, AND SEP71C SYSTEM HAVE BEEN r - 1 ,_. - ✓. �-x INSTALLED IN ACCORDANCE 'AM THE APPROVED PLAN. � - 1r�N / -- 9. EXISTING CESSPOOL IS TO BE PUMPED AND REMOVED �<< N ti• /<iic I'r X10. ALL UNSUITABLE' MATERIAL SHALL BE REMOVED FOR A MINIMUM OF 10' AROUND LEACH'tRENCNAND BE REPLACED WITH SAND HAVING A PERCOLATION RATE OF LESS THAN 2 MIN./ INCH. �e` APPROVED: BOARD OF HEALTH r. Je� DATE AGENT U OL <ors3� ¢ ZS', 9 oo SFr c1 \ DEC 17 2001 FLOOD Z0,L/C_ Alt C12-) Pyr PIPm M4 25oa/3�oSD 7/V9 t 01994 SWEETSER ENGINEERING Zre-Z PROPOSED PLOT PLAN FOR /�2T�v2 jiC/.9 � /2' c �✓ PROJECT LOCATION PROJECT SWEETSERENGINEERING 235 GREAT STEN ROAD SOUDENNIS,�MASS.398-3922 02660 SCALE " O, DATE REVISED FREVISED LOCATION MAP '09 N0. O DO SHEET / OF 01994 SWEETSER ENGINEERING