Loading...
HomeMy WebLinkAbout22.112 - Title 5 Site PlanTOP FOUND. EL. 17.0' PRECAST RISERS 2'm ACCESS COVERS TO WITHIN 6" OF FIN. GRADE SYSTEM PROFILE (NOT TO SCALE) 2" PEASTONE OR GEOTEXTILE FILTER FABRIC OVER STONE ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. CONCRETE COVERS TO WITHIN 3" GRADE 2% SLOPE REQUIRED OVER SYSTEM 16.0' , BLOCKS OR 4"OSCH40 PVC MORTAR ALL PRECAST RISERS PIPES LEVEL 1ST 2' [�4' COMPONENTS H-10 ' I ENDS (NP') INV'S FI SIUES 13.83 U 10" 1500 GAL H-10 1 q" 13.75' TEE SEPTIC TANK TEE E=1 En 0 �Elmm OK;lMP -®®®� °°° ° 13.5 � ° ° ° GAS BAFFLE: QQ=Eii moomm o o°o°oo E7 C7E7mmmmOmmE1 mmmE3mmmM SAEL :00000000 4' LIQ. LEVEL (ACME OR EQUAL) '' 13.4 13.23' 11.0 FOUNDATION- 11' *THE INSTALLER SHALL VERIFY TI UTILITIES AND ALL BUILDING SEW PRIOR TO INSTALLING ANY PORTI LEGEND 99- EXISTING CONTOUR X 99.1 EXIST. SPOT ELEV. 99 PROPOSED CONT01 99 PROPOSED SPOT E TH1 TEST HOLE 2> SLOPE OF GROUNI UTILITY POLE FIRE HYDRANT ,anon°o°o°00000°°°o�o�u� f 3/4"-1-1/2" DOUBLE WASHED STONE H-10 500 GAL 4' MIN. LEACHING CHAMBER BY ACME PRECAST OR EQUAL. (2) UNITS REQUIRED .ALL AROUND PRECAST STRUCTURES 6" CRUSHED STONE OR MECHANICAL OVERALL DIMENSIONS TO OUTSIDE OF STONE: 25.0' X 12.83' COMPACTION. (15.221 [2]) 6.05' WATER -TEST D'BOX FOR LEVELNESS MIN. (-L7 % SLOPE) SLOPE) - SEPTIC TANK 10 D' BFACILITY OX 8' LEACHING NO GROUNDWATER FOUND _ E LOCATIONS OF ALL R OUTLETS AND ELEVATIONS N OF SEPTIC SYSTEM TEST HOLE LOGS ENGINEER: DANIEL E. GONSALVES, SE WITNESS: AMY VON HONE) RS DATE: 12/12/13 PERC. RATE _ < 2 MINyINCH CLASS I SOILS 4 ELEV. ELEV. 0" 16.2 _ _ 4 ' 0" 16.2' A LS 10" 10YR 3/2 B LS 1OYR 5/8 26 14.0' PERC C FS 2.5Y 6/3 A LS 10" 10YR 3/2 B LS 1OYR 5/8 26" 14.0' C FS 2.5Y 6/3 135" �� 4.95' 1,35" �- NO GROUNDWATER ENCOUNTERED 13-294 4.95' NOTES 1. DATUM IS ASSUMED 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 4. DESIGN LOADING FOR ALL PROPOSED PRECAST UNITS TO BE AASHO H-j.Q 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH 310 CMR 15.000 (TITLE 5.) 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT LINE STAKING OR ANY OTHER PURPOSE. 8. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. 12. EXISTING LEACHING FACILITY SHALL BE PUMPED AND REMOVED EXISTING SEPTIC SYSTEM SHOWN PER AS -BUILT ON FILE AT TOWN - (LEACHING APPROXIMATE ONLY) 00 116 , Dx15.87- �o0, 15E PROP. DWELL. /i .7 1 - o TOP FNDN. = EL. 17.0' _ t. i.ii i •n ,�y 7,440 .61 \ •O TH 1 .6.01 O Jill 21 X 15.68 / o09R 3 TNJ. CHE Y e EXIST. DWELL. .2 sS' / ' / -- .8 0 ' O .72 / 0 ST. d� \ x 4 15,44 7 /., ... 3 SR; 5.41 PROP. 'o• s PROP. STAIRS TO AKS i BASEMENT WITHIN x 3 RETAINING WALL SSS• EXIST. CP 1 .1 5.4 I 04 15.0 bs `� t 5.46 ,.09 �a2. 5 x1 15 0' 48 02 2.6' 9.1EXIST. DWELL. 15 ,4 3 � s J2So V �\ 4.5'� 4 14. t 4.57 GRAVEL 1I_ 9 fir"- DRI 4.66 EXIST. DWELL. BENCH MARK -CTR 3. '� 7 14.22 P 3 CATCH BASIN. EL.= 13.5 R TOP FNDN EL. 15.9' 14 / FF EL 16.6' Q00, (xp 4.21 4.73 w + ����H PT.�x v3 .. <+ 14.03 Scale: 1 "= 20' 0 10 2C 30 40 50 FEET DATE S. Route L c c R' ° �P ° 0 ce/° e h S I 0 Lewis Bay Rodin LOCUS MAP NOT TO SCALE ASSESSORS MAP 22 PARCEL 112 LOCUS IS WITHIN FEMA FLOOD ZONE "C" AS SHOWN ON COMMUNITY PANEL#250012 DATED REV 7/2/1992 SYSTEM DESIGN: GARBAGE DISPOSER IS NOT ALLOWED PROPOSED 2 BEDROOM DWELLING DESIGN FLOW: 3 BEDROOMS ® 110 GPD = 330 GPD USE A 330 GPD DESIGN FLOW SEPTIC TANK: 330 GPD (2) = 660 USE A 1500 GAL. SEPTIC TANK LEACHING: SIDES: 2 (25 + 12.83) 2 (.74) = 112 GPD BOTTOM 25 x 12.83 (.74) = 237 GPD TOTAL: 472 S.F. 349 GPD USE (2) 500 GAL. LEACHING CHAMBERS (ACME OR WITH 4' STONE ALL AROUND Yarmouth Health Department - - , MA APPROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF 16 SILVER LEAF LANE WEST YARMOUTH PREPARED FOR SCOTT &r STACEY OBER REV. MARCHMII 7R 16 42(HSE DIM.) I off 508-362-4541 fax 508-362-9880 downcope.com In down cape engineering, iac. civil engineers land surveyors 939 Main Street ( Rte 6A) YARMOUTHPORT MA 02675