Loading...
HomeMy WebLinkAbout93.4.13 - Proposed Septic Design (2)oww., _ 1 e TOP OF FOUNDATION 2O FT. MINIMUM FROM CELLAR OR CRAWL SPACE 05.00 TMINIMUM 10 FT. MINIMUM FROM SLAB ; I, ELEV. 1 10 F . CLEAN SAND CONCRETE COVERS INSPECTION PORT' rn 4 SCHEDULE 40 PVC PIPE LOAM" AND SEED <: MIN. PITCH 1/8" PER FT. 2 LAYER OF 1/8' TO 1/2- A SOIL TEST DATE OF SOIL TEST SEPTEMBE 22 10 SOIL TEST DONE BY $ ETSER ENGINEERING WITNESSED BY A_YQN�I9NE OBSERVATION HOLE 1 . ELEV.= 97.8 ' PERCOLATION RATE <4_, MIN./INCH AT 72_ _ INCHES DEPTH IHORIZI TEXTURE . COLOR MOTT. OTHER 0/E ORG./MED. SAND 10YR7/1 NO ROOTS 6-37" B LOAMY SAND 1"0_-_6" IC 10YR6/6 ROOTS 37-132" 1LOAMY 'SANE) 2.5Y7/4 5% COBBLES 5% COBBLES NO WATER ENCOUNTERED AT 132" DEPTH HORIZ TEXTURE COLOR ELEV, 86.8 PROPOSED. SEPTIC `DESIGN FOR DUBLIN CONSTRUCTION OBSERVATION HOLE 2 ELEV._ 97.0 5-38" 8 LOAMY SAND_ 10YR6/6 ty DEPTH HORIZ TEXTURE COLOR MOTT. OTHER PROPOSED. SEPTIC `DESIGN FOR DUBLIN CONSTRUCTION 0-5" 0/E DRG./MED. SANG 10YR7/1 INO ROOTS 5-38" 8 LOAMY SAND_ 10YR6/6 ROOTS 38-120" C LOAMY, SAND 2.5Y7/4 5E al i1`:rJliF�G 203 SETUCKET ROAD 50$- SOUTH DEBO S 113 ASS. . 385-6900 02660 5% COBBLES NO WATER ENCOUNTERED AT ,1220 ELEV. a X87.0 I DESIGN CALCULATIONS NUMBER OF BEDROOMS 4 GARBAGE DISPOSAL UNITr TOTAL ESTIMATED FLOW ( 110 GAL/BR./DAY X _4 BR.) _44Q_GAL./DAY REQUIRED SEPTIC TANK CAPACITY ._FO_ GAL. ACTUAL SIZE OF SEPTIC TANK , _!6QL GAL: SOIL CLASSIFICATION r I— DESIGN PERCOLATION RATE 5_6__ MIN./IN. EFFLUENT LOADING RATE —0.74_ GAL./DAY/S.F. LEACHING AREA 126`33 SO. FT. (11X48)+(59X2X10/12) LEACHING CAPACITY (AREA X RATE) i4-0 GAL./DAY 828.53 X 0.74 . RESERVE LEACHING CAPACITY _0141 GAL./DAY NOTES: 1, ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN'S RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE. 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN 10 FT, OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAIN SUCH DETERMINATION FROM APPROPRIATE, AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY, EXCAVATION CONTRACTOR , IS TO CALL 'DIG -SAFE" AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. ANY VARIA11ON IS TO BE BROUGHT TO THE ATTENTION OF THE DESIGN ENGINEER IMMEDIATELY. .8. PA.P.CFt_ IS IN -FIL 7;7.: c.. :. 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL 4.1 10. ALL UNSUITABLE MATERIAL SHALL BE REMOVED FROM UNDER AND FOR A MINIMUM OF 5' AROUND SOIL ABSORPTION SYSTEM AND BE REPLACED WITH SAND AS SPECIFIED 1N 310 CMR 15.255:(3), APPROVED I OCT 2 6 2010 OLDKIMGMOUTH RECEIVED S HIGHWAY OCT 1 2010 F IftN A�yq YARMOUTH " ,/ - I OLD KING'S HIGHWAY y Ity. n i APPROVED: BOARD OF HEALTH i _ DATE AGENT C.• �S8jPROlj6920-001dwg�6920-SASDWG C2010 SWEETSER ENGINEERING . swat, Fit.' YARMOUTHPORT, MASS. ROU;IF 6A I ti�F y o� y�DNj r �ESFRi SANDS HAMS TEAD Locus —� SISTERS CIRCLE._' . RA/E 6 EXIT-% PROPOSED. SEPTIC `DESIGN FOR DUBLIN CONSTRUCTION LOC, IAT 13-- ,SISTERS CIRCLE YARMOUTHPORT, MASS. 5E al i1`:rJliF�G 203 SETUCKET ROAD 50$- SOUTH DEBO S 113 ASS. . 385-6900 02660 DATE:. OCT. 20, :2010` .. — 20 JOB s�2A-14 REV. ' C LOCATION MAP REv.�"� SHEET, 1 OE 1 C.• �S8jPROlj6920-001dwg�6920-SASDWG C2010 SWEETSER ENGINEERING . swat, Fit.'