HomeMy WebLinkAbout78.154 - Industrial Wastewater Holding Tank Plan:SIGN C
INDUSTRIAL WASTEWATER FLOW: FUNERAL HOME TREATMENT ROOM
3 GPD (ESTIMATED) x 500% = 15 GALLONS; USE 1,000 GALLON TANK
ESTIMATED FLOW TO HOLDING TANK =3 GALLONS PER DAY
TOTAL CAPACITY OF HOLDING TANK = 500% OF AVERAGE DAILY FLOW =15 GALLONS
HIGH WATER ALARM SET AT 75% OF TOTAL TANK VOLUME = 750 GALLONS
INSTALL: ONE ( 1) - 1,000 GALLON H-20 LINED INDUSTRIAL WASTEWATER HOLDING TANK
ONE ( 1) - INDUSTRIAL WASTEWATER HOLDING TANK SIGN
NO TES
1) THE INSTALLER IS RESPONSIBLE FOR ASSURING THAT COMPONENTS OF
THE SEWAGE DISPOSAL SYSTEM ARE DESIGNED WITH SUFFICIENT
STRENGTH TO SUSTAIN ALL LOADS TO BE IMPOSED ON THEM. ANY
COMPONENT OF THE SYSTEM SUBJECT TO VEHICULAR TRAFFIC MUST
COMPLY WITH A MINIMUM STANDARD OF A.A.S.H.T.O. H-20 WHEEL LOADS.
2) PRIOR TO SETTING ANY SYSTEM COMPONENT, INSTALLER
SHALL VERIFY EXISTING CONDITIONS, INCLUDING ELEVATIONS OF EXIT INVERTS,
AND REPORT ANY DISCREPANCIES TO THE DESIGN ENGINEER.
3) NO PART OF THIS DESIGN SHALL BE ALTERED WITHOUT PRIOR APPROVAL
FROM THE DESIGN ENGINEER AND THE AGENT OF THE LOCAL BOARD OF
HEALTH. ALL REQUESTS FOR CHANGES SHALL BE MADE IN WRITING PRIOR
TO CONSTRUCTION.
4) THE USE OF ALTERNATE MANUFACTURERS FOR SYSTEM COMPONENTS
SHALL NOT BE APPROVED IF THE USE OF THEIR EQUIPMENT REQUIRES
CHANGES IN DESIGN.
5) THE INSTALLER SHALL ASCERTAIN THE LOCATION OF EXISTING UNDERGROUND
UTILITIES PRIOR TO EXCAVATION, AND SHALL PROTECT UTILITIES WITHIN THE
WORK AREA DURING CONSTRUCTION.
5) THE ALARM PANEL SHALL BE INSTALLED IN A CONSPICUOUS LOCATION WITHIN
THE OFFICE AREA OF THE BUILDING. ALARMS TO BE BOTH AUDIBLE AND VISIBLE.
6) THE EXISTING SEWAGE DISPOSAL SYSTEM FOR TREATMENT ROOM SHALL BE
PUMPED, FILLED WITH SAND, AND ABANDONED; OR SHALL BE REMOVED
WITH SURROUNDING CONTAMINATED SOILS AND BACKFILLED WITH CLEAN
COARSE SAND.
1 inch 20 ft.
(THIS AREA IS SERVED BY TOWN WATER)
CONSTRUCTION NOTES:
1. INSTALLER TO ARRANGE A PRE -CONSTRUCTION CONFERENCE WITH ENGINEER PRIOR TO CONSTRUCTION,
2. THE LOCATION AND ELEVATION OF EXISTING TREATMENT ROOM BUILDING OUTLET PIPE ARE TO BE VERIFIED
PRIOR TO INSTALLATION OF THE PROPOSED WASTEWATER HOLDING TANK.
3. THE DISCHARGE PIPE IS TO BE RE-ROUTED WITH 4' DIA. SCH 40 PVC PIPE ACROSS THE EXISTING PAVED
DRIVEWAY TO THE PROPOSED WASTEWATER HOLDING TANK. THE DRIVEWAY IS TO BE SAWCUT FOR THE PIPE
INSTALLATION AND REPLACED IN KIND UPON COMPLETION.
4. THE DISCHARGE PIPE IS TO BE INSTALLED WITH A MINIMUM SLOPE OF 1.OX
5. THE PORTION OF THE EXISTING DISCHARGE UNE THAT IS NO LONGER IN USE IS TO BE CAPPED AND
ABANDONED.
6. ENGINEER SHALL INSPECT WHEN THE COMPONENTS OF THE SYSTEM HAVE BEEN INSTALLED.
7. INSTALLER TO PERFORM A WATERTIGHT TEST ON LINED I.W.H.T.
TEST TO BE WITNESSED BY ENGINEER AND PERFORMED AS FOLLOWS:
- INSTALLER TO FILL TANK WITH WATER AND ENGINEER TO MEASURE WATER LEVEL
- ENGINEER TO RE -MEASURE WATER LEVEL 24 HOURS AFTER START OF TEST.
- TANK TO BE PUMPED DRY UPON COMPLETION OF TEST BY INSTALLER.
8. ALARMS TO BE TESTED AT TIME OF COMPLETION OF INSTALLATION
9. A SIGN SHALL BE INSTALLED ADJACENT TO THE HOLDING TANK THAT READS 'NON -HAZARDOUS
INDUSTRIAL WASTEWATER HOLDING TANK'
ALL LINING, LEAK DETECTION, PIPE
PENETRATION BOOTS, PUMP -OUT
INSERT, AND ALARM TO BE SUPPLIED
BY MILLER ENVIRONMENTAL CORP.
26" DIA. HEAVY DUTY C.I.
FRAME AND COVER TO
GRADE NTH 'SEAL TITE'
GASKETED COVERS
INSTALL VENT THRU BUILDING
ROOF IN ACCORDANCE WITH
STATE AND LOCAL PLUMBING
CODES. \
SJE RHOMBUS TANK
ALERT DUO FLOATS -
ALARMS TO BE WIRED
TO BUILDING
HIGH WATER LEVEL ® -
75% OF TANK CAPACITY
PROVIDE MILLER ENVIRONMENTAL TAPE
AT ALL EXTERIOR CORNERS OF TANK -
PROVIDE MINIMUM 1- FOOT COMPACT GRAVEL
WITH 2' GRANULAR SAND COVER --�
BELOW PRECAST TANK
NON
HAZARDOUS
INDUSTRIAL
WASTEWATER
HOLDING
TANK
6' 11EM
SIGN SHALL BE SECURELY
MOUNTED ON BUILDING
OR ON POST AS SHOWN.
PAVEMENT
I. W. H. T. SIGN
(NOT TO SCALE)
CL
PLAN REFERENCES:
ASSESSORS MAP 78 PARCEL 154
PLAN BOOK 148, PAGE 49
REFERENCE PLAN
PREPARED FOR: RON FERRO
PREPARED BY: RS O'HEARN INC.
REV. DATE: 5-25-85
FLOOD_ NOTE:
FLOOD ZONE C AS SHOWN ON
FEMA FIRM PANEL #2500015 0004C
REVISED JUNE 17, 1986
DATUM NOTE:
ELEVATIONS SHOWN HEREON ARE BASED
ON AN ASSUMED DATUM
LEAK DETECTION
INSPECTION PORT
9' DIA. WATER TIGHT CAST IRON
FRAME AND COVER TO FINISH GRADE
WITH 'SEAL TITE' GASKETED COVER
26' DIA. HEAVY DUTY C.I.
FRAME AND COVER TO
GRADE 1MM''SEAL TITE"
GASKETED COVERS
20" DIA HEAVY DUTY C.I.
FRAME AND COVER TO
GRADE WITH 'SEAL TITE"
GASKETED COVER
KEY MAP
NO SCALE
LEGEND
EXIS77NG
® CATCH BASIN
LIGHTPOST
X 99.9 SPOT GRADE
—100— CONTOUR
— E — ELECTRIC
— W— WATER
AD A.C. UNIT
PROPOSE
�- SIGN
A/E — ALARM do ELECTRIC
PVC CONDUIT
— V — VENT
EXISTING BUILDING
TOP OF FOUNDATION
EL=99.65
FINISHED GRADE
M7WASTEWATER
GALLON H-20 LINED INDUSTRI HOLDING TANK
(NOT TO SCALE)
TANK LINER NOTES
GROUNDWATER EL = 88.8'1
PER SOIL TEST PERFORMED
G TANK
BY: O'HEARN INC./ J. MCDONALD
DATE: 5-2-85
(SEE PLAN REFERENCE)
1. TANK LINER TO BE A PVC FLEXIBLE MEMBRANE
LINER MODEL I XR-5 PROVIDED BY MILLER ENVIRONMENTAL
CORP. OR APPROVED ALTERNATIVE.
2. THE LINER MALL BE FABRICATED WITH BOOTS
FASTENED BY STAINLESS STEEL HOSE CLAMPS TO
PROVIDE WATER -TIGHT SEAL AROUND THE INLET AND OR
OUTLET VENT PIPES BOOTS SHALL BE USED ON All PIPE
PENETRATIONS AND MANHOLE RISERS.
BOOTS SHALL BE INSTALLED IN ACCORDANCE WITH
MILLER ENVIRONMENTAL CORP. SPECIFICATIONS.
3 THE LINER SHALL BE INSTALLED IN ACCORDANCE
WITH MILLER ENVIRONMENTAL CORP. SPECIFICATIONS
Yarmouth Health D-- epartment
APPROVED
Data
DEC 2 0 2010
COMPLIANCE NOTE:
OWNER SHALL MAINTAIN I.W.H.T. IN ACCORDANCE WITH
DEPARTMENT OF ENVIRONMENTAL PROTECTION 314 CMR 18.00
MDUSTRIAL WASTEWATER HOLDING TANK AND CONTAINER
CONSTRUCTION, OPERATION, AND RECORD KEEPING
REQUIREMENTS AND LOCAL REGULATIONS.
TWK SHALL BE INSPECTED WEEKLY BY FACILITY OPERATOR.
INSPECTION AND PUMPING RECORDS SHALL BE MAINTAINED ON SITE.
OASTAL
UL OMPANY, INC,
260 Cranberry Hwy. Orleans, MA 02653
508.255.6511 Fax: 508.255.6700
SEAL
P.,
AS NOTED
DRA WING FILE
C17394.dwQ
DATE
TLM
C2.1.1
� OF � SHEETS
JO.
C17394.00
0
LINER CONNECTION STRAPPING
4' DIA.
PROVIDE BEAD OF MILLER
FLOW
ENVIRONMENTAL TAPE BETWEEN
TANK AND LINER AT STRAPPING
PIPE PENETRATION
Y MILLER
EXIST.
INLET TEE
TOTAL CAPACITY OF TANK 1,000 GALLONSIA
KENVRONMENTAL
SCH 40 PVC PIPE
O
MINIMUM SLOPE = 1.0%
BUILDING
O
�6'
PROTECTIVE PUMP -OUT SLEEVE
O
(18' COR. HDPE PIPE BY
MILLER ENVIRONMENTAL)
O
3' DIA. PERFORATIONS
O INTERIOR XR-5
DRILLED BY MILLER ENVIRONMENTAL
LINER SYSTEM
LEAK DETECTION PIPING/SYSTEM (ON
INSIDE OF
TANK). TO BE INSTALLED IN ACCORDANCE WITH
MILLER ENVIRONMENTAL
V.,,j(• V�IM-.y VV VYlV VV VVMVVVVVVVVVVww.� ..
SPECIFICATIONS.
M7WASTEWATER
GALLON H-20 LINED INDUSTRI HOLDING TANK
(NOT TO SCALE)
TANK LINER NOTES
GROUNDWATER EL = 88.8'1
PER SOIL TEST PERFORMED
G TANK
BY: O'HEARN INC./ J. MCDONALD
DATE: 5-2-85
(SEE PLAN REFERENCE)
1. TANK LINER TO BE A PVC FLEXIBLE MEMBRANE
LINER MODEL I XR-5 PROVIDED BY MILLER ENVIRONMENTAL
CORP. OR APPROVED ALTERNATIVE.
2. THE LINER MALL BE FABRICATED WITH BOOTS
FASTENED BY STAINLESS STEEL HOSE CLAMPS TO
PROVIDE WATER -TIGHT SEAL AROUND THE INLET AND OR
OUTLET VENT PIPES BOOTS SHALL BE USED ON All PIPE
PENETRATIONS AND MANHOLE RISERS.
BOOTS SHALL BE INSTALLED IN ACCORDANCE WITH
MILLER ENVIRONMENTAL CORP. SPECIFICATIONS.
3 THE LINER SHALL BE INSTALLED IN ACCORDANCE
WITH MILLER ENVIRONMENTAL CORP. SPECIFICATIONS
Yarmouth Health D-- epartment
APPROVED
Data
DEC 2 0 2010
COMPLIANCE NOTE:
OWNER SHALL MAINTAIN I.W.H.T. IN ACCORDANCE WITH
DEPARTMENT OF ENVIRONMENTAL PROTECTION 314 CMR 18.00
MDUSTRIAL WASTEWATER HOLDING TANK AND CONTAINER
CONSTRUCTION, OPERATION, AND RECORD KEEPING
REQUIREMENTS AND LOCAL REGULATIONS.
TWK SHALL BE INSPECTED WEEKLY BY FACILITY OPERATOR.
INSPECTION AND PUMPING RECORDS SHALL BE MAINTAINED ON SITE.
OASTAL
UL OMPANY, INC,
260 Cranberry Hwy. Orleans, MA 02653
508.255.6511 Fax: 508.255.6700
SEAL
P.,
AS NOTED
DRA WING FILE
C17394.dwQ
DATE
TLM
C2.1.1
� OF � SHEETS
JO.
C17394.00
0