Loading...
HomeMy WebLinkAbout97 South Sea Avenue Septic System Design 2i FIRST 2' TO y ACCESS COVERS MUST BE WITHIN BE LEVEL 2B NOVTE TEE 6' _6" OF FINISH GRADE r` t FBF`F7 103.72 �•' +q Ij / 4* O/AM PIPE 2SCH 40 PVC D 103. LGCUS� 100.01 Q. 0� 99.45 99. 15 103., 9 7 ' w5 J _9L4 3 OUTLET D -BOX I50C, GAL H-10 H-!0 PUMP CHAMBER W ` v - _SEPTIC TANK WATERTIGHT AND WATERTIGHT AND FACTORY WATERPROOFED ?, i FACTORY WATERPROOFED y, CRUSHED STONE OR COMPACTED BASE L OCUS MAP PROFILE: NOT TO SCALE IRRIGATION GENERAL NOTES: 1. THIS PLAN IS FOR .THE. DESIGN AND CONSTRUCTION B HIGH CAPACITY OF THE SEWAGE' DISPOSAL SYSTEM ONLY. INFILTRATOR CHAMBERS ' Z W13.5'x STONE AROUND 2, VERTICAL DATUM IS ASSUMED. FOR BENCH MARKS n N D. SET. SEE SITE PLAN. J. ALL CONSTRUCTION METHODS AND MATERIALS AND o >E MAINTENANCE OF THE SEPTIC SYSTEM SHALL ! o CONFORM TO MASS. D.E.P.' TITLE 5 AND LOCAL o BOARD OF HEALTH. REGULATIONS. _ Q 4. ALL SEPTIC SYSTEM COMPONENTS LOCATED UNDER AREAS SUBJECT.TO VEHICULAR TRAFFIC OR GREATER. - IHA,r 3' IN DEPTH $HALL BE CAPABLE OF WITH- -- STAI:DING H-26, WHEEL LOAD$. y� 5. A L 5-W,ER PIPE SHALL BE SCHEDULE 40 OR APP:OCED EQUAL. �p PwP a4MeE.. 6. SEr'T.L TANK. PUMP CHAMBER AND D -BOX SHALL BE REitiFORCED PRECAST CONCRETE, WATERTIGHT AND of by �� SEPTI WATERPROOF I D -BOX SHALL BE WATER TESTED TO \ ti� o CHECK FOR LEVEL WHEN THERE IS MORE THAN ONE a� OUTLET. - CLOTHESLINE O BY C91DH _ND O CESSPOOLS PI 7. 8EFOi7E CONSTRUCTION CALL "DIG -SAFE EL -102.23 I-Bd5-01G-SAFE AND THE LOCAL WATER DEPT. o $VICK F0 I UNDERGROUND UTILITIES. by R LOCATION' UND 1SPF F B. EXISTING CESSPOOLS TO BE PUMPED DRY. AND BACKFILLED. �'' FxlsrrNG 1,45 0� 9. ALL UNSUITABLE MATERIAL (A 6 8;HORIZONSI ENCOUNTERED BELOW THE INVERT OF THE LEACHINGI R FAC;LITY 70 BE REMOVED FOR A DISTANCE OF 5' t AFG'I+D AND REPLACED WITH SAND IN ACCORDANCE \ WITH.TITLE 5 _ 10.. EX i - T I N'G INVERT AT THE DWELL I NG MAY NEED TO \S,\lplp irE r,'ELOCATED TO THE. ELEVATION SHOWN. 9 ti BOUYANCY CAL COLA T l ONS: SEPTIC TANK: DISPLACEMENT - (97.7-95,21 x 10.5 x115.67 - 149 C,F. 149 C.F. x 62.4 !/C.F. - 9287/. H-10 TANK - 11480# OK % P PUMP CHAMBER: DISPLACEMENT,- (97.7-94.91 x 8.5 x114:83 - 115 C.F. 115 C.F. x 62.4 s/C.F. -'7173/. H-10 TANK - 8240; OK - PUA1P SYSTEM NOTES: 1. PUaP To SE MYERS RESIDENTIAL. SEWAGE PUMP MODEL SRM4 PYC INLET OR E6UAL. - 2. . THE `LAP "LL START AND STOP AT THE ELEVATIONS SHOWN. J. THE PVMP SHALL BE INSTALLED 7N STRICT CONFORMANCE WITH THE MANLFACTURER'S SPECIFICATIONS AND TITLE Y. REGULATIONS. PU'AIP DISCHARGE SHALL BE 2. INCHES. PUMP SHOULD BE ABLE TO BE Of$CONNECTED AND LIFTED OUT OF THE PUMP CHAMBER WITHOUT T R THE POMP CHAMBER - PVC OUTLET , HAVING TO EN. £ 4. ThE ALARM SHALL START AT THE ELEVATION SHOWN AND BE PUMP DE TA l L NOT TO SCALE POWERED BY A CIRCUIT SEPARATE FROM THE PLWP POWER. USING 1000 GAL, PUMP CHAMBER 5. AN E.ECTRICAL PEI NIT MUST Of OBTA INEO FOR THIS INSTALLATION. WATERTIGHT AND WATERPAOCF i 9' Mi NiMUM COVER I J y VER I IFL EVA ! I ONS MIN. 2' OF INVERT EX1ST1l;; SEWER: 100.01 IT PEAONE1'VFNT INVERT IN SEPTIC TANK: 99.7 10..a MIN 2vINVERT OUT SEPTIC TANK: 99.45 18 YIN INVERT IN PL+.!A CHAMBER: 99.4 02. 7. j INVERT OUT PJbf° CHAMBER: 99. 15 } `----3/4' - I !/2' DIA. INVERT IN J15T. BOX: 103.72 6 HIGH CAPACITY INFILTRATOR DOUBLE WASHED STONE INVERT OUT DISI. BOX: 103.55 CHAMBERS W/3.5'1 STONE AROUND INVERT /N LEACH CHAMBER: 103.53 10'x x 50'1 x 10'd BOTTOM LEACH CHAMBER: 102.7 ADJUSTED GROUND WATER: 97.7 OBSERVED GROUND WATER: 95.0 BOTTOM OF TEST HOLE #!r 94.0 INDEX WELL M1W 29, ZONE A U` FEB 02 READING -9.7'. ADJ-2.7' 1p 0 0 moo. ` `N SCF \ r ` v, 457 - S. - FET♦ 1101 �l P�( Y Ik ` P, i ♦ 0� B' LFsro DESIGN CRITER I DESIGN FLOW: 4 BEDROOMS AT ilO G.P.D. PER BEDROOM EOUALS 440 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REOUIRED: 440 G.P.D. X 200V - 860 GAL. .SEPTIC TANK PROVIDED: 1500 GAL. le!f, SOIL ABSORPTION SYSTEM REOUIRED: DESIGN PERC RATE C 5 MIN/INCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 440 GPD / 0.74 GPD/SF - 595 S.F. REOUIRED PROVIDED: 6 HIGH CAPACITY INF1LTdATOP CHAMBERS W/3.5 1 STONE AROUND, A-600 S.F. 600 S.F. x 0.74 - 444 GPD $CIL TEST PI T ATA INDICATES INDICFTES PERCOLATION OBSERVED TEST GROUNDWATER TP +f 0. HORIZON TEXTURE COLOR 102.0 Q LOAMY /0YR SAND 3/3 i2' 101.0 p LOAMY - 10YR J SAND 5/6 28" _...__....._ _ 99.7 C MEDIUM IOYR SAND 6/6 c4' �- 95.0 96" ---- 94.0 DATA F'"BPUARY 28, 2002 TEST BY: STEPHEN HAAS W/TNES EE,' 3Y: LYNN MULKEEN PERC Pa rF: C 2.M1N_/INCH ♦(e� 2 _ _!./tom G,r-_.- hy. v SLS EP 7- / C S YS TE -M 0 E-,5 97 SOUTH SEA 4 VE/vIJE I P,4EP.4RE� FOR ROBER7- HILL SCAL c / 20' ♦4 RR / L / 7. 2002 EAGLE SURVEY I NG 2 1 NC 923 Route 6A Yari-n thpor t MA 02675 1508 362-8132 ( 508) 432-5333 JOB l'l0l-I35-fFLD:CFW/EEK CALC: SAN/CFW CHECK: CFW DRN: SAN COUPLING MERCURY FLOAT - SFITOWS - WEEP HOLE ALARM ON - CeEcx PWP ON VAL YE S'D AN /UIP OfF O fWP 6'Sl9P PVC OUTLET , HAVING TO EN. £ 4. ThE ALARM SHALL START AT THE ELEVATION SHOWN AND BE PUMP DE TA l L NOT TO SCALE POWERED BY A CIRCUIT SEPARATE FROM THE PLWP POWER. USING 1000 GAL, PUMP CHAMBER 5. AN E.ECTRICAL PEI NIT MUST Of OBTA INEO FOR THIS INSTALLATION. WATERTIGHT AND WATERPAOCF i 9' Mi NiMUM COVER I J y VER I IFL EVA ! I ONS MIN. 2' OF INVERT EX1ST1l;; SEWER: 100.01 IT PEAONE1'VFNT INVERT IN SEPTIC TANK: 99.7 10..a MIN 2vINVERT OUT SEPTIC TANK: 99.45 18 YIN INVERT IN PL+.!A CHAMBER: 99.4 02. 7. j INVERT OUT PJbf° CHAMBER: 99. 15 } `----3/4' - I !/2' DIA. INVERT IN J15T. BOX: 103.72 6 HIGH CAPACITY INFILTRATOR DOUBLE WASHED STONE INVERT OUT DISI. BOX: 103.55 CHAMBERS W/3.5'1 STONE AROUND INVERT /N LEACH CHAMBER: 103.53 10'x x 50'1 x 10'd BOTTOM LEACH CHAMBER: 102.7 ADJUSTED GROUND WATER: 97.7 OBSERVED GROUND WATER: 95.0 BOTTOM OF TEST HOLE #!r 94.0 INDEX WELL M1W 29, ZONE A U` FEB 02 READING -9.7'. ADJ-2.7' 1p 0 0 moo. ` `N SCF \ r ` v, 457 - S. - FET♦ 1101 �l P�( Y Ik ` P, i ♦ 0� B' LFsro DESIGN CRITER I DESIGN FLOW: 4 BEDROOMS AT ilO G.P.D. PER BEDROOM EOUALS 440 G.P.D. NO GARBAGE GRINDER SEPTIC TANK REOUIRED: 440 G.P.D. X 200V - 860 GAL. .SEPTIC TANK PROVIDED: 1500 GAL. le!f, SOIL ABSORPTION SYSTEM REOUIRED: DESIGN PERC RATE C 5 MIN/INCH SOIL TEXTURAL CLASS - I EFFLUENT LOADING RATE - 0.74 GPD/SF 440 GPD / 0.74 GPD/SF - 595 S.F. REOUIRED PROVIDED: 6 HIGH CAPACITY INF1LTdATOP CHAMBERS W/3.5 1 STONE AROUND, A-600 S.F. 600 S.F. x 0.74 - 444 GPD $CIL TEST PI T ATA INDICATES INDICFTES PERCOLATION OBSERVED TEST GROUNDWATER TP +f 0. HORIZON TEXTURE COLOR 102.0 Q LOAMY /0YR SAND 3/3 i2' 101.0 p LOAMY - 10YR J SAND 5/6 28" _...__....._ _ 99.7 C MEDIUM IOYR SAND 6/6 c4' �- 95.0 96" ---- 94.0 DATA F'"BPUARY 28, 2002 TEST BY: STEPHEN HAAS W/TNES EE,' 3Y: LYNN MULKEEN PERC Pa rF: C 2.M1N_/INCH ♦(e� 2 _ _!./tom G,r-_.- hy. v SLS EP 7- / C S YS TE -M 0 E-,5 97 SOUTH SEA 4 VE/vIJE I P,4EP.4RE� FOR ROBER7- HILL SCAL c / 20' ♦4 RR / L / 7. 2002 EAGLE SURVEY I NG 2 1 NC 923 Route 6A Yari-n thpor t MA 02675 1508 362-8132 ( 508) 432-5333 JOB l'l0l-I35-fFLD:CFW/EEK CALC: SAN/CFW CHECK: CFW DRN: SAN