HomeMy WebLinkAbout26.117 - Sewage Disposal System Upgrade PlanDEEP OBSERVATION HOLE LOGS
DESIGN CALCULATIONS
NOTES
NO SCALE
DESIGN FLOW: 22 - (1) BEDROOM UNITS AT 110 GAL PER DAY PER BEDROOM = 2420 GPD
1)
GARBAGE GRINDERS ARE NOT ALLORED WITH THIS DESIGN.
FILL
REQUIRED LEACHING CAPACITY;' -2420 GPD
2)
THE INSTALLER IS RESPONSIBLE FOR ASSURING THAT COMPONENTS OF
DATE OF TESTS: NOVEMBER 16, 2001
PROPOSED LEACHING: ' A 7,200 SQ. FT: LEACHING FIELD CAN LEACH:
2,500 GALLON (H-20) SEPTICTANK(SECOND IN SERIES)
THE SEWAGE DISPOSAL SYSTEM ARE DESIGNED WITH SUFFICIENT
PERCOLATION RATE : LESS THAN 2 MINUTES PER INCH DROP
Vt = (7200) x .74 = 5328 GPD ';.
4'-23' HARDENING
STRENGTH TO SUSTAINALL LOADS TO BE IMPOSED ON THEM. ANY
IN THE C HORIZON IN DOH # 1 AND DOH /2
SAND
10 YR 6/4
COMPONENT OF THE SYSTEM SUBJECT TO VEHICULAR TRAFFIC MUST
LOOSE, MID.
REQUIRED SEPTIC TANK CAPACITY. (FIRST TANK IN SERIES) 2420 GPD X 200% - 4840 GALLONS
HOMA 434-170/5.5N SEWAGE DISPOSAL PUMPS
COMPLY WITH A MINIMUM STANDARD OF A.A.S.H.LO. H-20 WHEEL LOADS.
WITNESSED BY : JOHN G. SCHNAIBLE, CEC
AMY VAN HONE , HEALTH AGENT
(SECOND TANK IN SERIES) 2420 GPD X 100% = 2420 GALLONS
3)
PRIOR TO SETTING ANY SEWAGE DISPOSAL SYSTEM COMPONENT, INSTALLER
IN DESIGN.
PROPOSED SEPTIC TANK CAPACITY: ONE (1) - 5,000 GALLON SEPTC-TANK (FIRST IN SERIES)
SS -2A
2ss
SHALL VERIFY EXISTING CONDITIONS, INCLUDING ELEVATIONS OF EXIT INVERTS,
AND REPORT ANY DISCREPANCIES TO THE DESIGN ENGINEER.
ONE (1) -2,500 GALLON SEPTC TANK (SECOND IN SERIES)
EXISTING SEPTIC TANK, PUMP CHAMBER, D -BOX, AND LEACHING CHAMBERS
7)
DEEP OBSERVATION HOLE 1 EL = 11.27
-
4)
ALL GRAVITY SEWER PIPE SHALL BE 60 DIA. SCH 40 PVC UNLESS OTHERWISE
DEPTH FROM
SURFACE
SOIL
HORIZON
SOIL
TEXTURE
SOIL COLOR
MUNSELL
SOIL
MOTTLING
OTHER
0' - 23'
FILL
ONE ( 1) -
5,000 GALLON (H-20) SEPTIC TANK (FIRST IN SERIES)
-FILL TANKS WITH WATER PRESOAK FOR 24 HOURS.
0' - 4' ASPHALT
ONE 1) -
2,500 GALLON (H-20) SEPTICTANK(SECOND IN SERIES)
HEALTH.: ALLREQUESTSFOR CHANGES SHALL BE MADE IN WRITING PRIOR
FOUR { 4) -
4'-23' HARDENING
23' - 113'
C
SAND
10 YR 6/4
NONE
LOOSE, MID.
PERC AT TWO ( 2) -
HOMA 434-170/5.5N SEWAGE DISPOSAL PUMPS
0
SHALL NOT BE APPROVED IF THE USE OF THEIR EQUIPMENT REQUIRES
36 '
SAND
IN�TALL� ONE { 1) -
FLOOD NOTE: CONSTRUCTION NOTE:
100 L x 36 W x 1.0 D. LEACHING FIELD Vt = 2664 GPD (FIELD -2b)
SOIL
TEXTURE
NOTED. - THE MINIMUM SLOPE OF 6 DIA. SCH 40 PVC SHALL BE 0.01 FT/FT.
ONE { 1) -
100'L x 36'W (AVG.) x 1.0'D. LEACHING FIELD Vt = 2664 GPD (FIELD -2D)
5)
' NO PART OF THIS DESIGN SHALL BE ALTERED WITFIOU.T PRIOR APPROVAL
ONE ( 1) -
5,000 GALLON (H-20) SEPTIC TANK (FIRST IN SERIES)
-FILL TANKS WITH WATER PRESOAK FOR 24 HOURS.
FROM THE DESIGN ENGINEER AND THE AGENT OF THE LOCAL BOARD OF
ONE 1) -
2,500 GALLON (H-20) SEPTICTANK(SECOND IN SERIES)
HEALTH.: ALLREQUESTSFOR CHANGES SHALL BE MADE IN WRITING PRIOR
FOUR { 4) -
(H-20) LEACHING FIELD INSPECTION PORTS
24` - 113•
TO CONSTRUCTION.
ONE ( 1) -
-4' DIA. (H-20) SEWER MANHOLE
6)
THE USE OF ALTERNATE MANUFACTURERS FOR SYSTEM COMPONENTS
PERC AT TWO ( 2) -
HOMA 434-170/5.5N SEWAGE DISPOSAL PUMPS
0
SHALL NOT BE APPROVED IF THE USE OF THEIR EQUIPMENT REQUIRES
36 '
SAND
SNE
IN DESIGN.
GROUNDWATER ENCOUNTEREDCHANGES
SS -2A
2ss
260 CRANBERRY HIGHWAY
ORLEANS, MASS. ,02653
(508} 255=6511
AT A DEPTI Cf 111' REMOVE: (SYSTEM 2) -
EXISTING SEPTIC TANK, PUMP CHAMBER, D -BOX, AND LEACHING CHAMBERS
7)
THE INSTALLER SHALL ASCERTAIN THE LOCATION OF EXISTING UNDERGROUND
UTILITIES PRIOR TO EXCAVATION, AND SHALL PROTECT UTILITIES WITHIN THE
WORK AREA DURING CONSTRUCTION.
DEEP OBSERVATION HOLE 2 EL = 11.37 8} THE EXISTING SEWAGE DISPOSAL SYSTEM f4 SHALL BE PUMPED AND '
'I
DEPTH FROM
SURFACE
SOIL
HORIZON
SOIL
TEXTURE
SOIL COLOR
MUNSELL
SOIL
MOTTLING
OTHER
0' - 24'
FILL
PERC AT
0%-5%
-FILL TANKS WITH WATER PRESOAK FOR 24 HOURS.
0' - 5' ASPHALT
36'
-SYSTEM #1 SERVES 9 UNITS
45% OF THE SAMPLE, BY WEIGHT, SHALL BE RETAINED ON THE 14 SIEVE.
GROWWATEIENNCGUNTERED
5'-24' HARDENING
24` - 113•
C
SAND
10 YR 6/4
NONE
LOOSE, MED.
SHEET TILE -
SEWAGE DISPOSAL SYSTEM UPGRADE PLAN
( PHASE III - SEWAGE DISPOSAL SYSTEM - 2) `
PROJECT NO.
C13376.00
0
4/5/02
0
SAND
REMOVED WITH SURROUNDING CONTAMINATED SOILS AND BACKFILLED WITH
100 YEAR FLOOD - ELEV. = 10.0 1. INSTALLER TO ARRANGE A PRECONSTRUCTION CONFERENCE WITH ENGINEER PRIOR TO CONSTRUCTION. CLEAN COARSE SAND.,
FEMA FIRM COMM. -PANEL 1250015 0006 D 2. ENGINEER SHALL INSPECT WHEN THE REQUIRED EXCAVATION IS COMPLETE
REVISED JULY 2, 1992 3. ENGINEER SHALL INSPECT WHEN CLEAN FILL MEETING REQUIRED GRADATION HAS BEEN PLACED. IF APPLICABLE: . I
4 ENGINEER SHALL INSPECT WHEN THE COMPONENTS OF THE SYSTEM HAVE BEEN INSTALLED
-SYSTEM 14 SERVES 12 UNITS -'ENGINEER TO RE -MEASURE WATER LEVEL 48 HOURS AFTER PRESOAK
6. ENGINEER SHALL INSPECT WHEN THE PUMPS AND CONTROLS HAVE BEEN INSTALLED.
7. INSTALLER TO PERFORM A CLEARWATER TEST PRIOR TO DEMONSTRATE OPERATION OF SYSTEM. TEST
- - - - TO BE WITNESSED BY ENGINEER AND LOCAL B.O.H. i
ASSESSORS MAP 26
PARCEL 116
—Z�1—
6' SCH 4D VENT MANIFOLD CONTINUOUS 40 MIL LINER ON WALL - _ DUNE AREA TOM OF YARMOUTH
VENT _ - — _ BASS RIVER BEACH
- (SEE LNYOUT ON SS -2B TOP LINER EL - 10.5
FOR FIELD VENTING) BOTTOM LINER EL - &0 ExiSTTNG CONCRETE RETANNG WALL - - - -
BASE OF WALL IS COASTAL BANK -
T ALL COMPONENTS OF EXISTING SYSTEM 12 + VENT TOP OF WALL ELEVATION = 11.0
TO BE PUMPED AND REMOVED ALONG PATH
SURROUNDING CONTAMONATED SOIL AND
REPLACE W/ CLEAN SAND. (SEE NOTE Af9)
EVSTING 1 tst EXISTNG CONCRETE RETAINING WALL
1 )
- BASE OF WALL IS COASTAL BANK
(o�IN. TOP of wu1 ELEVATION -11.0
® CURB �7=E
3600 SO 1, —� x11A �I E
vv _ _ _ _ _ _ _ _
SW
T - - — — — — — — — o- ---HELD
VARIANCES
310 CMR 15.000 frMF 51
15,211 MPMMUM SMACK DISTAD
-SEPTIC TANK LESS THAN 10' FROM FOUNDATION (2' VARIANCE)
-SOIL ABSORPTION SYSTEM LESS THAN 20' FROM FOUNDATION (5' VAM4CE)
-SOIL ABSORPTION SYSTEM LESS THAN 50' FROM WATERCOURSE
(46' VARIANCE TO TDP OF COASTAL DANK)
-SOA. ABSORPTION SYSTEM LESS THAN 10' FROM PROPERTY LINE (6' VARIANCE
70YM OF YA?MOUTH BOARD OF HEALTH REGULATIONS
15_03 (Z) DiSTAN(S'S
-LEACHING F=M LESS THAN 100' FROM WATERCOURSE
(96' VARIANCE TO TOP OF COASTAL BANK)
SIEVE 1 PERCENT
TE.
5. INSTALLER TO A TEST ALL CHAMBERS AND TANKS. TEST TO BE
9) FILL MATERIAL FOR SYSTEMS CONSTRUCTED IN FILL SHALL BE CLEAN
50
I V I L
NO
LL
WITNESSED 8Y ENGINEER AND PERFORMED AS FOLLOWS:
ENGINEER PERFORMED
GRANULAR SAND, FREE OF ORGANIC MATTER AND OTHER DELETERIOUS
PERC AT
0%-5%
-FILL TANKS WITH WATER PRESOAK FOR 24 HOURS.
MATERIALS. THE SAND SHALL BE GRADED SUCH THAT NOT MORE THAN
36'
-SYSTEM #1 SERVES 9 UNITS
45% OF THE SAMPLE, BY WEIGHT, SHALL BE RETAINED ON THE 14 SIEVE.
GROWWATEIENNCGUNTERED
-SYSTEM /2 SERVES 22 UNITS
(CONTACT ENGINEER AT START OF PRESOAK)
THE FILL SHALL NOT CONTAIN ANY MATERIAL LARGER THAN 2 INCHES.
AT A DEPTH 11 IF 111'
-SYSTEMS SERVES 20 UNITS
- ENGINEER TO MEASURE WATER LEVEL AFTER PRESOAK IS COMP
ENGINEER TO RE -MEASURE WATER LEVEL 24 HOURS AFTER PR OAK
THE MATERIAL THAT PAM 'THE 4 SIEVE SHALL MEET THE
-SYSTEM 14 SERVES 12 UNITS -'ENGINEER TO RE -MEASURE WATER LEVEL 48 HOURS AFTER PRESOAK
6. ENGINEER SHALL INSPECT WHEN THE PUMPS AND CONTROLS HAVE BEEN INSTALLED.
7. INSTALLER TO PERFORM A CLEARWATER TEST PRIOR TO DEMONSTRATE OPERATION OF SYSTEM. TEST
- - - - TO BE WITNESSED BY ENGINEER AND LOCAL B.O.H. i
ASSESSORS MAP 26
PARCEL 116
—Z�1—
6' SCH 4D VENT MANIFOLD CONTINUOUS 40 MIL LINER ON WALL - _ DUNE AREA TOM OF YARMOUTH
VENT _ - — _ BASS RIVER BEACH
- (SEE LNYOUT ON SS -2B TOP LINER EL - 10.5
FOR FIELD VENTING) BOTTOM LINER EL - &0 ExiSTTNG CONCRETE RETANNG WALL - - - -
BASE OF WALL IS COASTAL BANK -
T ALL COMPONENTS OF EXISTING SYSTEM 12 + VENT TOP OF WALL ELEVATION = 11.0
TO BE PUMPED AND REMOVED ALONG PATH
SURROUNDING CONTAMONATED SOIL AND
REPLACE W/ CLEAN SAND. (SEE NOTE Af9)
EVSTING 1 tst EXISTNG CONCRETE RETAINING WALL
1 )
- BASE OF WALL IS COASTAL BANK
(o�IN. TOP of wu1 ELEVATION -11.0
® CURB �7=E
3600 SO 1, —� x11A �I E
vv _ _ _ _ _ _ _ _
SW
T - - — — — — — — — o- ---HELD
VARIANCES
310 CMR 15.000 frMF 51
15,211 MPMMUM SMACK DISTAD
-SEPTIC TANK LESS THAN 10' FROM FOUNDATION (2' VARIANCE)
-SOIL ABSORPTION SYSTEM LESS THAN 20' FROM FOUNDATION (5' VAM4CE)
-SOIL ABSORPTION SYSTEM LESS THAN 50' FROM WATERCOURSE
(46' VARIANCE TO TDP OF COASTAL DANK)
-SOA. ABSORPTION SYSTEM LESS THAN 10' FROM PROPERTY LINE (6' VARIANCE
70YM OF YA?MOUTH BOARD OF HEALTH REGULATIONS
15_03 (Z) DiSTAN(S'S
-LEACHING F=M LESS THAN 100' FROM WATERCOURSE
(96' VARIANCE TO TOP OF COASTAL BANK)
SIEVE 1 PERCENT
SIZE PASSING
4
100%
50
.10%-100%
100
0%-20%
200
0%-5%
PLAN REFERENCE:
L.C.P. 14114C
ASSESSORS MAP 26 PARCEL 117
COASTAL ENGINEERING CO., INC. SEWAGE DISPOSAL
SYSTEM PLAN DATED 11/20/96
LEGEND
EXISTING
® CATCH BASIN
00.0 SPOT GRADE
`O--) UTILITY POLE
PROPOSED
+10.0 SPOT GRADE
�II
�I
I
J
Q
Z
CONCRETE. AREA
x
NO.
DATE
REVISION
BY
Z
o
SHEET TILE -
SEWAGE DISPOSAL SYSTEM UPGRADE PLAN
( PHASE III - SEWAGE DISPOSAL SYSTEM - 2) `
PROJECT NO.
C13376.00
0
4/5/02
0
WN BY
SMR
SNE
WING
C13376SS.dwg
COASTAL ENGINEERING
COMPANY, INC.
PROFESSIONAL ENGINEERS & LAND SURVEYORS
SS -2A
2ss
260 CRANBERRY HIGHWAY
ORLEANS, MASS. ,02653
(508} 255=6511
o
Q
Z
CONCRETE. AREA
x
f
j
NOTE:
THE INFORMATION HEREON HAS BEEN PREPARED ACCORDING TO
THE REQUIREMENTS OF TITLE 5 OF THE STATE ENVIRONMENTAL';
CODE FOR SUBSURFACE DISPOSAL OF SANITARY SEWAGE AND
LOCAL BOARD OF HEALTH REGULATIONS. EXCEPT FOR NOTED
VARIANCES.
-
in r i
J
CC CEC 2002
K
a
a
SII
C133 u.
{
NO.
DATE
REVISION
BY
SHEET TILE -
SEWAGE DISPOSAL SYSTEM UPGRADE PLAN
( PHASE III - SEWAGE DISPOSAL SYSTEM - 2) `
PROJECT NO.
C13376.00
SCALE AS NOTED
4/5/02
PROJECT - -
OCEAN CLUB HOMEOWNERS ASSOCIIA77ON
329 SOUTH SHORE DRIVE ASSR. MAP 26 PCL 117' SOUTH YMNOUTH , MA
WN BY
SMR
SNE
WING
C13376SS.dwg
COASTAL ENGINEERING
COMPANY, INC.
PROFESSIONAL ENGINEERS & LAND SURVEYORS
SS -2A
2ss
260 CRANBERRY HIGHWAY
ORLEANS, MASS. ,02653
(508} 255=6511
C133 u.
{