Loading...
HomeMy WebLinkAbout145 South Street - 3rd Floor & RoofLEGEND Bearing Wall Below Bearing Wall Above L----------- Non-Bearing --------Non-Bearing Wali Below Non -Bearing Wall Above L—--——--—--—— Post Below Post Above ® @ Post Above & Below Stagg Multlple Member Beams Side Loaded Connection 112" die. Soft (b) Numhe Mamb 1 3!4" Bblt Spacing 112"tlla. 2— Bolt (b) 3 ® 4 F50 Max. Uniform Load (lbs. per If, n. ) 12' o c. 5" o.c. em - 500 1000T2000375 750330 070 min. (a) 7"w Ide merlbars must ba loaded from bath sides. (b) usiaeto dllde 5 or 0nar)e Design washers each side andrill holes dim (c) 25IValue'% for noIn tbs n -snow w here code Increased ad 159'o for snow loaded roofs ei 3RD FL Framing Schedule - Nominalized Tag Qty I Description Length 1 1 3-1/2" x 9-1/2" VERSA-LAr.10 3080 DF 4' 0" 2 2 1-3,-`4" x 11-7/8" VERSA-LAU1 D 3100 SP 44'0" Connection N. Multiple Member Beams Side Loaded Connection 1 3/4" Versa -Lam Nall Pattern 18d common nails. See chart Max Un Norm Load ( lbs. per In ft) mITT emrMberot 2rowe grows FWrnbe_ mh. 2 _520 790 99 1 3(a) 380 585 (a) Nall pattern for 3 • place member must occur on both sides. Nai(values maybe increased by 15% for snow • load roofs and by 25% for non • snow roofs where building code allows, Multiple Member Connection Nail 1N.T.S. Nall each end L with 1 - 3" { (10d) nail i -.l 1%" minimum end bearing length at all floor and roof details. F13 -D' Attachment at End N.T.S. 3RD FL 114" = 11-0" Load Bearir Wall AJS'" Blocking Panel. Use 3" (10d) nails at 9" o.c. \'ting Panels at Interior Bearing IFI -- — N.T.S. its from above to bearing below. I 8 \ Post Load Transfer N.T.S. Toe nal rim board to plate w ith 2%" (8d) nails at T o.d. or w th 3'h" (15d) nails at 12'0.0. 1 •2%" (SM nail for each Joist flange F� Rim Board N.T.S. Joist F19 LVL Header Opening N.T.S. RM board and AJS '"Side-byekle. Nell dm hoard and rinnJolst W th 211" (ad) nails at Ir oc. Exterior End Wall Super F13 -C -- N.T.S. ROOF Framing Schedule - Nominalized Tag Qty Description Length 1 1 3-112" x 11-7/8" VERSA -LAM® 3080 DF 14'0" 2 1 3-1/2" x 16" VERSA -LAM) 3080 DF 20' 0" 3 2 1-3/4" x 11-7/8" VERSE,-LAM0 3100 SP 44'0" -------------------------------------------- - ----i ----- ---- -- -- -- -------------------------- �- � r Ii I� �1 tl 11 11 �1 11 II 11 I, , II 1i ' J------------------ ------------------ ll----------- see Calc 4/B-12 I , 1 — — L fl '1 11 11 II II f7•----------_TJ1 1 1, see Calc 4/B 13 1, I 1 I J_, 11 1 ---------- ��'_.J --—————————————— r-------�— ---------------- I _see Cale 4/B 14 i I 1 I II rr J___________________________ 1----___—__________--_—__--__— ,1 T----------------------------- _—___—__—_____----_ 1� 11 ,I ,I I, I� I, 1� I1 2 II 1, 1� ,1 ,I I, 1� 1, 1� 1_—_— L - - - - -_-, _--__--L ___- 4=------ I, 1, 1------------------ L________L.�_—______ ROOF 1/4" = 1'-0" REVISIONS: BY: 7-27-09 BC H z W W 0 LLIW�—a,W F-� WLL Qy?W Zwml' 20Z J F- J Q Notes: Shop drawings, typical details and framing plans, outlining Installation procedures and unit Identification marks, shall be submitted for approval by the project architect and/or engineer. Exact quantities and lengths are the responsibility of the contractor. Contractor Is to verify all beams and joists at their exact locations. The floor system (1 -joist, LVL) are designed for floor loads only. Roof loads from rafters, bracing, and beams must bear on exterior walls and Interior walls with bearing straight through to a footing. Any roof loads carried by the floor system must be so Indicated on the framing pian submitted to us for take -off. Product to be stored, handled and Installed in accordance with manufacturer's recommendations. � T N I L YJ O tp N to LO+L..% O N 0 c Q 0) N 'c aa) m BC FRAMERO 2.0 SCALE: 1/4" = T -O" DATE: 9/21/2005 BY: be FILE: Sidharth Lot #1.bcf DWG: SHEET: 1 / 3