Loading...
HomeMy WebLinkAbout145 South Street - Level One FramingLEGEND Bearing Wall Below I Bearing Weill _Above _ _ _ L------------1 Non' -Bearing Wall Below Non -Bearing Wall Above 1 I' — — — — — — — — — — — — Post Below Post Above Post Above & Below Multiple Member Beams Side Loaded Connection 12" dia. Bolt (b) .--�—, MIlb UnHorm Lead (lbs. penin. R,) 13/4' e 24 oa 12"oe�6"o.c. fdembare - 1 314" Vene•Lam - x 4 ll) L 500 1000 2000- Bolt Spacin 1/2"db. — Bt(b) 61 3 376 750 1600 , T L___.. 330 670 _ 1330 2"min, LLL��� --- i a (a)7"wIn nlemba apply baloaded from both of (b) /lee Hat w ethers each Olde and a1Yl hns (grade oaii m' dla Ighen Staggered (c) All vetoes In the table above may be InoraH ad ia%for snow lorded roofs el 23% for non -snow roofs w Hera code allow S. &I MOVE LALLY TO ALIGN UNDER INTERSECTION OF BEAMS (SEE DIMENSIONS) MOVE LALLY COLUMN TO, ALIGN UNDER POSTS ABOVE (SEE DIMENSIONS) Multiple Member Beams Side Loaded Connection 1 3/4" Verse -Lam Nall Pattern 16d common nails. 12" O.c 1 T 2� 2620s _ _ See ch Max uniform Load per In. ftJ)J 2 0 3rows 2°mIn. li 1 Iso (a) 390 636 (a ) Nall pattern for 3 - piece member must occur on both sides. Nall values may be Increased by 150A for snow - load roofs and by 25% for non - snow roofs where buliding code allows. F49 � ltiple Member Connection Nail N.T.S. / Nall each entl wlth 1 -3 (10" (10d) nail's i 1'h" minimum end bearing length at all floor and roof details. Attachment at End #13-D N.T.S. \--NOTE NEW LOCATION talc 1/B 5 OF LALLY, ALIGN WITH POSTS ABOVE Load Bearin Weill AJS'" Blocking Panel, Use 3" (1 Od) malls at 6" 0.0, Panels at Interior Bearing 'F��/ N.T.S. ALIGN LOCATION OF LALLYS WITH POSTS FROM FRAMING ABOVE. I i— Solid block ell posts from above to bearing below. F08 Post Load Transfer D�� N.T.S. Toa nail rim board to plate w ah 2'h" (so) ni at e" o.c. or w th 37s" (1 lid) nails at 12" ac, 1.29.' (ed) nail for eachostflenge Rim Board N.T,S, Joist vloloo-uViII LVL beam F19 LVL Header Opening N.T.S. Level 1 Framing Schedule - Nominalized Tag Qty Description Length 1 11 11-7/8" AJ ST-' 20 MSR 30` 0" 2 20 11-7/8" AJST" 20 MSR 26'0" 3 1 11-7/8" AJSTm 20 MSR 22'0" 4 16 11-7/8" AJSTr'' 20 MSR Level 5 3 11-718" AJS T"" 20 MSR 1D' 0" 6 6 11-718" AJSTl" 20 MSR 8101, 7 1 3-112" x 11-7/8" VERSA- LAM0 3080 DF 20' 0" 8 1 3-112" x 11-7/8" VERSA.-LAMJ 3080 DF 14'0" 9 2 1-314" x 1 1-718" VERSA -LAM— 31C0 SP 142'0" 10 2 1-3f4" x 11-7/C" VERSA -LAW 3100 SP 22'0" 11 2 1-3f4" x11-718" VERSA: LARD 3100 SP 1S' C" 12 2 1-314" x 11-7/S" VERSA -LAR 0 3100 SP 14'0" 13 BLK 11-7/8" AJSTm 20 MSR 78'0" 14 TL 1-118" x 11-7/8" BC RIM BOARDT- OSB Level 1 Accessory Schedule Tag Qty Manufacturer Product Description H2 1 Simpson Strong -Tie, Inc. HWU3.56/11.88 H3 28 Simpson Strong -Tie, Inc. ITT311.88 Rim board and AJS T laid y -eke. NO rim board and rkn}olet w 6h 2'X' (sd) nails at e' o.c. F 3 F Exterior End Wall Support N.T.S. REVISIONS: 7-27-09 I H WWp WW - W HDLLIILL. z�w� Co gOz J F— J Q M RN Notes: Shop drawings, typical details and framing plans, outlining Installation procedures and unit Identification marks, shall be submitted for approval by the project architect and/or engineer. Exact quantities and lengths aro the responsibility of the contractor. Contractor Is to verify all beams end joists at their exact locations. The floor system (1 -joist, LVL) are designed for floor loads only. Roof loads from rafters, bracing, and beams must bear on exterior wells and Interior walls with bearing straight through to a footing. Any roof loads carried by the floor system must be so Indicated on the framing plan submitted to us for take -off. Product to be stored, handled and Installed In accordance with manufacturer's recommendations. START FRAMING HERE Level 1 Al 117/8" AJS 20 16" OCS III 1 �N Level o 2Co_ a sagas, N O to V=) J V% CO T 47 N F W fd (n _ BC FRAMERI 2.0 SCALE: 1/4" = 1'4" DATE: 9/21/2005 BY: be FILE: Sidharth Lot #1.bcf DWG: SHEET: 1 / 3