HomeMy WebLinkAbout7 South West Drive - Sewage Disposal DesignSOIL TEST PIT DATA
NOT TO SCALE
TEST PIT #_
GRD. EL. 10.5
SHGW EL. 1.8
EL 10.1
EL. 9.3
EL 8.2
EL 0.5
A
LOAMY SAND
10YR 3/2
E
EDIUM/F SAND
2.5Y 5/2
IM2
Bw
LOAMY SAND
10YR 5/8
C
FINE SAND
2.5Y 6/4
-S_
-L
5"
EL.
10.3
15"
EL.
9.5
27"
EL
8.0
57"
DEPTH O INDEX WELL (5/10)
6.7
104'
0.7
DEPTH TO ADJUSTED WATER
113"
5. IF AN OVERDIG IS SPECIFIED, REPLACE
ALL EXCAVATED MATERIALS WITHIN THE
120"
EL.
0.7
DATE: 6/24/10
TEST BY BSC GROUP, INC.
WITNESSED BY: AMY VON HONE
FERC. RATE: < 2 MIN./INCH
SOIL EVALUATOR: BRIAN YERGATIAN. P.E.
SOIL CLASS: CLASS I
L,T.A.R.: 0.74 GPD/S.F.
TEST PIT _#
GRD. EL. 10.7
SHGW EL 1.9
A
LOAMY SAND
1OYR 3/2
E
MEDIUM/F SAND
2.5Y 5/2
Bw
LOAMY SAND
10YR 5/8
C1
FINE SAND
2.5Y 6/4
1,500 GALLON SEPTIC TANK (H-10) DISTRIBUTION BOX DETAIL (H-10)
NOT TO SCALE NOT TO SCALE
ESTIMATED NOTESREMOVABLE3"
�_- SEASONAL HIGH 1. SEPTIC TANK SHALL BE STEEL REINFORCED CONCRETE. MIN. 20" DIA. COVER, EYP. 2" WALLS--� COVERER
GROUNDWATER 2. SEPTIC TANK SHALL BE CAPABLE OF WITHSTANDING H-10 RAISE (2) TO WTHIN 6. OF FINISHED • • .: r
LOADING. GRADE USING SEWER BRICK AND
3. ALL PIPE CONNECTIONS AND CONCRETE CONSTRUCTION MORTAR AS NECESSARY
1 OBSERVED SHALL BE WATERTIGHT. g_1/2• O O
GROUNDWATER 4. TEES SHALL BE SCH. 40 PVC AND SHALL BE LOCATED 6" MAX
WITHIN 12" OF TANK WALL AND ACCESSIBLE FROM TANK NOTES:
PERCOLATION COVER. 11-1/2"
TEST RANGE 5. FILL ALL UNUSED KNOCKOUTS NTH MORTAR. 1. DIST. BOX TO WITHSTAND H-10 LOADING
5' 6. IF ANY PORTION OF THE GROUND SURFACE ABOVE UNLESS UNDER PAVEMENT, DRIVES OR
TANK WALL BE SUBJECT TO VEHICLE LOADS, AN H-20 4" 2" TRAVELED WAYS WHEREIN H-20 LOADING
SEPTIC TANK SHALL BE REQUIRED. BOTTOM ON LEVEL. SHALL APPLY.
F 7777171 UNSUITABLE "• '�.: STABLE BASE 6" MINIMUM 2. PROVIDE INLET TEE OR BAFFLE WHERE
15" MATERIALS
(TO BE REMOVED) 10'-6" _ 3/4" TO 1-1/2" SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR
,• 10" SECTION VIEW CRUSHED STONE IN PUMPED SYSTEM.
10'-0" 3" "
33" 4' MIN. 3. FIRST TWO FEET OF PIPE OUT OF DIST.
PRECAST SEPTIC TANK LIQUID DEPTH 5'_8• _ BOX TO BE LAID LEVEL.
(SHOREY OR APPROVED EQUAL) 4'-6" LOCATE 4. ALL PIPE CONNECTIONS AND CONCRETE
- INLET TEE + CONSTRUCTION SHALL BE WATERTIGHT.
-B" O O
C
UNDER COVER 90' ELBOW ON (5) 5 DIA.
OUTLET TEE 3• 13' ( KNOCKOUTS I 5. FILL ALL UNUSED KNOCKOUTS WIIH
3" MORTAR.
77 A,..•
L
6. CONCRETE COVER SHALL BE RAISED TO
105' WITHIN 6 INCHES OF FINISHED GRADE.
i
114" s' MINIMUM CROSS-SECTION VIEW �^+--- 21' -�
120" PLAN VIEW 3/4" TO 1_1/2•
CRUSHED STONE PLAN VIEW
SEASONAL HIGH GROUNDWATER
NO. DATE DESCRIPTION
ADJUSTMENT
1. THIS PLAN IN ONLY INTENDED FOR THE
DEPTH TO OBSERVED WATER
9.4
INDEX WELL
MIW-29
WATER LEVEL RANGE ZONE
A
DEPTH O INDEX WELL (5/10)
6.7
WATER LEVEL ADJUSTMENT
0.7
DEPTH TO ADJUSTED WATER
8.7
DATUM
VERTICAL DATUM: N.G.V.D.
BENCH MARK SET: NAIL SET IN UTILITY POLE
ELEVATION 9.94 NGVD
SYSTEM PROFILE
NOT TO SCALE
EL -A
4" SCH. 40 PVC
L=12 FT.
S=0.02
SEPTIC TANK
UM.
MAGNETIC REFLECTIVE TAPE SHALL BE PROVIDED
IN THE TRENCH OVER ALL PVC PIPING
4" SCH. 40 PVC
L=24 FT.
S=0.02
FIRST PIPE LENGTH
TO BE SET LEVEL
FOR MIN. 2' FINISH GRADE
EL.=11 1-11.7
4' PVC SCH 40
LEACHING ffj CHAMBER
0000000000
0000000000
I=G G G G C C C G C OHO
I7 -F H
5 OUTLET
D -BOX 5.7' SEPARATION
J
EST. HIGH GROUNDWATER
S*HEDULE OF ELEVATIONS
TOP OF FOUNDATION
4" INVERT AT BUILDING
4" INVERT AT SEPTIC TANK (IN)
4" INVERT AT SEPTIC TANK (OUT)
4" INVERT AT DIST. BOX (IN)
4" INVERT AT DIST. BOX (OUT)
INVERTS AT LEACHING FACILITY:
4" INV. AT LEACHING CHAMBER
ELEVATION AT BOTTOM OF CHAMBER
SEASONAL HIGH GROUNDWATER
VARIANCES REQUESTED
TITLE V:
NONE
L_
13.50 A
10.67 B
10.43 C
10.26 D
9.90 E
9.73 F
9.6 G (BREAKOUT 10.0)
76 H
1.9 J
b
500 GAL. LEACHING CHAMBER
NOT TO SCALE 5' DIA. KNOCKOUT (TYP.)
NOTES
PER
OO =M O O [�O OO 1 SYSTEMCSHALL BE RAISED
MM MM 17-1 r_1 17_1 017-71 00 TO FINISH GRADE.
=3 3 = E] O = l'_I O O M 2. CHAMBERS SHALL BE
lel 1 Mr -1 0017-1 o0 00 500 GALLON LEACHING
DRYWELL, MANUFACTURED
MM M l- B O O BY SHOREY OR APPROVED
EQUAL.
I 12-36" COVER OBSERVATION LOAM AND SEED
PORT ALL DISTURBED AREAS
117711 111717711171111'7"7=
2" LAYER LE 1/8" TO
1/2' DOUBLE WASHED
ED M p O PIPABOVE CROWN
34' 24" O C] D +
EFFECTIVE 3/4" TO 1 -1/2 -
DEPTH 0 (1 EZ3 DOUBLE WASHED
[= C] t= C] STONE TO CROWN
i n ZZ OF PIPE
4'-10"
12 _10• + GEOTEXTILE FABRIC
MAY BE USED IN LIEU
OF DOUBLE WASHED
CROSS-SECTION 1/2' PEASTONE
W
PROPOSED FLOOR PLAN 10 \\\S' i _W�_W_- W W DESIGN CALCULATIONSNOT TO SCALE vc,
CLOSET
MASTER
MASTER BEDROOM
BATH.
LN.
MASTER
BEDROOM
KIERAN J.
S HEALY v
No.48135
nn
H
--- -----, AS ac� IDESIGN FLOW:
3 BEDROOMS ® 110 GPD/BDRM = 330 GPD
TP#17-1 //
NOTE: �i / REQUIRED SEPTIC TANK
�\ �
KITCHEN BATH / GAS MAIN NOT MARKED 1 330 GALLONS X 2007. = 660 GALLONS
BEDROOM \ i OUT BY DIG -SAFE. / /
N2 LOCATION OF MAIN IS / e /f SEPTIC TANK PROVIDED = 1,500 GALLONS
I UNKNOWN AT THIS TIME
sem' I I AND THE LOCATION
1 DEPICTED HEREON IS / SIZE OF LEACHING FACILITY REQUIRED:
OM BEl00M / U APPROXIMATE.
U /
3 .° ! \\ \DESIGN PERC. RATE: <2 MIN/INCH
LONG TERM APPL RATE: 0.74 GPD/S.F.
330 GPD 4 0.74 GPD/SF = 446 S.F.
1POTM
LE°N� \\sO�j; Ap��O��'/� I ` SIZE OF LEACHING FACILITY PROVIDED:
jam/ ' USE (2) 500 GALLON CONCRETE CHAMBERS
GU
Q
l --- WRE r - J �, SIDEWALL AREA = 2(25' + 12.83') X 2 = 151 S.F.
\
GUY O BOTTOM AREA = 25' X 12.83' _ .320 S.F.
� / r r /
WRE / /r �� 471 S.F.
PROPOSED- ry i i `J 471 S.F. X 0.74 GPD/S.F. = 348 GPD
RESERVE AREA _,''�'� L � 3r
c/Y� j( R�0.00'
»°! r ° L=93.00' 'Yarmouth Health Department
FLOODzONE LINE By 1 ,/ r + I
LOT 17 to ELEVARON 1°;' / �
APPROVED
PROPOSED
PRIMARY S.A.S.
12.83' x 25.0' I
EXISTING PROPOSED "D" BOX`
SHEITP#17-2
PROPOSED 5' OVERDIG ; ..: :.: - I 11 LOCUS INFORMATION
ARE '.:.: 'r TP#1
^� 3 % LOT 19
PROPOSED r, r # I
1500 GALLON v r • .. , r /
F1o0p SEPTIC TANK#2 / / O4Q
FZey FEM'UN
E UNE i•... i / l °�� / CURRENT OWNER: ROBERT A. DINNIE
POE FLOP i9" 09'� '�� / / % 3 TITLE REFERENCE: CTE. 144715
B _� 4 �� ��• �i r / r e cQ i
PLAN REFERENCE: LCP. 18413
11
� 10Y�, ¢ / � O� I�
560>wo s ASSESSORS MAP: 25
a PARCEL: 303
_ ZONING DISTRICT: R-25
\ ^ rl 1-4 SETBACKS: FRONT 30'
( i...•+ SIDE 6'
\ o REAR 20'
I I GARAGE g / 3 MINIMUM LOT SIZE: 25,000S.F.
PROPOSED
BEDROOM DWELLING I� EXISTING TOTAL LOT AREA: 27,258 S.F.
2 BOUNDS
FOUND AT
CORNER.
EASTERLY
BOUND HELD
TOF 13.5
BASEMENT FLOOR 5.7
PATIO
t5'30�143.00' SHED
DWELLING
BULKHEAD
LOT 21
NITROGEN SENSITIVE
ZONE: NOT A ZONE It
"OF Ay FEMA FLOOD
ZONE DISTRICT: "A9" ELEV 10
F BRIAN G.
YERCGiv LIAN H OVERLAY DISTRICT: ON
A po.4s2oa _ >
6-�o
PLAN VIEW
SCALE: V = 20 FEET
0 10 20 40 FT,
LOCUS MAP
NOT TO SCALE
LLLLI
v
LOCUS
28
;I
SOUTH SHORE DR.
NANTUCKET SOUND
FILE COPY
REVISIONS
NO. DATE DESCRIPTION
GENERAL NOTES:
1. THIS PLAN IN ONLY INTENDED FOR THE
DESIGN AND CONSTRUCTION OF THE
DWELLING k SEWAGE DISPOSAL FACILITY.
2. ALL CONSTRUCTION METHODS AND
MATERIALS SHALL CONFORM TO 310 CMR
15.000 AND YARMOUTH BOARD OF
HEALTH REGULATIONS.
3. THERE ARE NO KNOWN OR PROPOSED
PRIVATE WELLS LOCATED WITHIN 150 FT.
OF THE PROPOSED LEACHING FACILITY.
4. IF AN OVERDIG IS SPECIFIED, REMOVE ALL
TOPSOIL, SUBSOIL AND OTHER
UNSUITABLE MATERIALS.
5. IF AN OVERDIG IS SPECIFIED, REPLACE
ALL EXCAVATED MATERIALS WITHIN THE
LIMIT OF EXCAVATION WITH CLEAN
GRANULAR SAND, FREE FROM ORGANIC
MATERIAL AND DELETRIOUS SUBSTANCES.
MIXTURES AND LAYERS OF DIFFERENT
CLASSES OF SOIL SHALL NOT BE USED.
FILL SHALL NOT CONTAIN ANY MATERIAL
LARGER THAN 2 INCHES. A SIEVE
ANALYSIS USING A #4 SIEVE SHALL BE
PERFORMED ON A REPRESENTATIVE
SAMPLE OF FILL UP TO 45% BY WEIGHT
MAY BE RETAINED ON THE #4 SIEVE.
SUCH ANALYSES MUST DEMONSTRATE
THAT THE MATERIAL MEETS EACH OF THE
FOLLOWING SPECIFICATIONS:
100% MUST PASS #4 SIEVE
10% MUST PASS #50 SIEVE
0-20% MUST PASS #100 SIEVE
0-5% MUST PASS #200 SIEVE
6. EXISTING UTILITIES WHERE SHOWN ON THE
PLANS ARE APPROXIMATE. THE ENGINEER
DOES NOT GUARANTEE THEIR ACCURACY
OR THAT ALL SUBSURFACE STRUCTURES
ARE SHOWN. CONTRACTOR SHALL VERIFY
THE SIZE, LOCATION AND ELEVATION OF
INVERTS OF UTIU71ES AND STRUCTURES,
WITHIN THE LIMIT OF WORK, PRIOR TO THE
START OF CONSTRUCTION. IF ANY
DISCREPANCIES ARE DISCOVERED OR FIELD
CHANGES REQUIRED, THE CONTRACTOR
SHALL NOTIFY THE ENGINEER IMMEDIATELY.
7. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR PROPERLY COORDINATING THE
PROPOSED CONSTRUCTION ACTIVITIES WITH
DIG -SAFE AND THE APPLICABLE UTILITY
COMPANIES, AND SHALL COMPLETE THE
PROPOSED WORK WITHOUT ANY
INTERUPTIONS IN SERVICE.
9. CONTRACTOR IS REQUIRED TO NOTIFY
DIG -SAFE, PER MASS. STATUTE CHAPTER
82, SECTION 40 (1-888-344-7233) A
MINIMUM OF 72 HOURS PRIOR TO THE
START OF CONSTRUCTION.
9. THIS SYSTEM IS NOT DESIGNED FOR THE
USE OF A GARBAGE GRINDER.
INSTALLATION OR USE OF A GARBAGE
GRINDER AT THIS PROPERTY IS NOT
ALLOWED PER 310 CMR 15.240(4).
a h` BSC GROUP
349 Route 28, Unit D
W. Yarmouth, Massachusetts
02673
508 778 8919
C 2010 BSC Group, Inc.
PROJECT TITLE:
DESIGN FOR
SEWAGE DISPOSAL
SYSTEM
SOUTH WEST DR.
So. YARMOUTH
MASSACHUSETTS
PREPARED FOR:
BAYSIDE BUILDING COMPANY, INC.
Mr. JIMMY BOWES
3 BAYBERRY SQUARE
CENTERVILLE, MA 02632
(508) 771-1040
JIMMYOBAYSIDEBUILDING.COM
DATE: JUNE 28, 2010
COMP. DESIGN: B. YERGATIAN
CHECK: K. HEALY
DRAWN: K. HEALY
FIELD: P. HAGIST
FILE NO. 49521-SEP.DWG
DWG NO. 6013-01
SHEET 1 OF 1
JOB NO. 4-9521.00