Loading...
HomeMy WebLinkAbout11 South West Drive Sewage Disposal DesignRESEARCH BY: JWN FIELD SURVEY: KGM/JWN COMPUTED BY. JWN DRAFTED BY: DRD/BPG DESIGNED BY: BPG CHECKED BY: BJW a ,1 :. 1 Igo-.. •1:•• ., � � ,. 7 I :A� t I "'Ill '.1 ,,i I l . n r IhI. re. r••• ►ii •• �• r� • •• r� r •• r r :•r._ • s• �: y • • •..� •THE FOLLOWING • U W.10 I re •, a.� • • • • a • �` Il 5 BEDROOM SHME FAMLY OVELLYNG HLOM OF BEDROOMS X 110 GAL/BR/DAY - UMM FLOP! HIE (R) 8WROOMS X 110 GAL-AW)DAY - 550 "LAAY (GPO) IEACW,% 6CLUX (COMVENTMAL TRENCH PIPE 8: STor&): SOIL IM MAL CLASS (310 CMR 15.243): CLASS 1 (SANDS. LOAMY SANDS) COMM PERCOLA7M RAZE Q M LAL LONG TERM ACCEPTANCE RATE (310 CMR 1524$ 0.74 GPO/54 FT. DESIGN FLOW (GPO) / LTAR (GPO/SQ FT.) - MQl LEAOM AREA (S4 FT.) 550 GPD / 0.74 GPD/SM FE - 743 SQ. FL REAUUM SYSTEM AREA PR011DFD (S4 FT.) - / OF 7FM4 NES X LE NAiN OF TRENCH X (20 UTlN) 1-2x54x((2x2)+3]-756 S.F. 0- M743 M ExCAYA110N AREA REQUIRED = 6410NG DY 25' aw MAIN 5' OVERDID to (00 a �ITr7T' -J 11 . , 13.60 9.60 11.22 10.97 10.72 10.56 10.39 10.17 9.00 11.8 3.80 10.71 ICHNVG FIELD REQUIRED EXCAVATION -11 ZONE BUT IS NOT WITHIN A LOT WAS CREATED IN 1956. 7.2' Know wharS below. Call before you dig. lad o= AP 25. LOT 299 ..,�Icm ;m•11 ORIF ' 1' "' 1m / _ --� / AP 25. IAT 302 / AREA= 11,298 S.F/ / r / / J FA AP 25. LOT 303 INSPECTIONS REQUIRED OF THE DESIGN ENGINEER PLEASE NOTIFY DUNN-McKENZIE. INC. (800-540-9720) AT LEAST 48 HOURS IN ADYWCR 1. SEPTIC TANK EXCAVATION WITH STONE PRIOR TO SEPTIC TANK PLACEMENT. 2. LEACHING FIELD EXCAVATION PRIOR TO BACKFILLING WITH "SEWER GRAVEL'. 3. 'SEWER GRAVEL" BACKFILL - MUST PASS SIEVE TEST (SEE NOTE #1 ON SHEET #2 UNDER "SYSTEM IN FILL"). 4. ALL PIPING AND CHAMBER ELEVATIONS PRIOR TO BACKFILL. 5. FILTER FABRIC AND FINAL GRADING OVER ENTIRE SYSTEM. * EXCAVATION NOTE THE ENGINEER MAY ORDER THE REMOVAL OF ADDITIONAL UNSUITABLE SOIL THAT MAY BE ENCOUNTERED UPON INSPECTION OF OPEN EXCAVATION. DATUM NOTE : ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM - 1988 BENCHMARK NOTE, BENCHMARK SHALL BE SET WITHIN 50 FT. OF LEACHING SYSTEM PRIOR TO ANY CONSTRUCTION. REMOVE THESE SOIL HORIZONS SEE 'LEACHING FIELD' NOTE 6 ON SHEEF 2 SOIL TEST RESULTS TEST HOLE: 14-1 11-14-14 GROUND ELEV.= 10.4 _ HOLE: 14-2 DATE: 11-14-14 GROUND ELEV.= 10.3 2-6' A/ SANDY/ 7YR 7/8' HIGH GROUND -)TATER LEVEL COMPUTATION FOR 11 SOUTH i9EST DRIVE STEP 1 MEASURE DEPTH TO WATER TABLE TO NEAREST 1/10 FT. DATE 11/14/14 STEP 2 USING WATER -LEVEL RANGE ZONE 5YR 8/1 AND INDEX WALL MAP LOCATION 6-1Y E SAND SITE AND DETERMINE: ® APPROPRIATE INDEX WELL w2 12-48' B SAND 48-120' C SAND ® WATER -LEVEL RANGE ZONE STEP 3 USING MONTHLY REPORT "CURRENT 7YR 5/8 IOYR 6/6 WATER RESOURCES CONDITIONS 5.8 0.3 DETERMINE CURRENT DEPTH TO WATER LEVEL FOR INDEX WELL 11/14 STEP 4 USING TABLE OF WATER -LEVEL ADJUSTMENTS FOR INDEX WELL (STEP 2A), CURRENT DEPTH GROUNDWATER ELLV. (2.50 FRIMPTER ADJUSTMENT) TO WATER LEVEL FOR INDEX WELL (STEP 3), AND WATER -LEVEL ZONE (STEP 2B) GROUNDWATER ELEV. (2.5' FRIWW ADJUSTMENT) DETERMINE WATER -LEVEL ADJUSTMENT5 STEP 5 ESTIMATE DEPTH TO HIGH WATER BY SUBTRACTING THE WATER LEVEL ADJUSTMENT (STEP 4) TEST HOLE DATE FROM MEASURED DEPTH TO WATER TEST HOLE; DATE LEVEL AT SITE (STEP 1) / _ --� / AP 25. IAT 302 / AREA= 11,298 S.F/ / r / / J FA AP 25. LOT 303 INSPECTIONS REQUIRED OF THE DESIGN ENGINEER PLEASE NOTIFY DUNN-McKENZIE. INC. (800-540-9720) AT LEAST 48 HOURS IN ADYWCR 1. SEPTIC TANK EXCAVATION WITH STONE PRIOR TO SEPTIC TANK PLACEMENT. 2. LEACHING FIELD EXCAVATION PRIOR TO BACKFILLING WITH "SEWER GRAVEL'. 3. 'SEWER GRAVEL" BACKFILL - MUST PASS SIEVE TEST (SEE NOTE #1 ON SHEET #2 UNDER "SYSTEM IN FILL"). 4. ALL PIPING AND CHAMBER ELEVATIONS PRIOR TO BACKFILL. 5. FILTER FABRIC AND FINAL GRADING OVER ENTIRE SYSTEM. * EXCAVATION NOTE THE ENGINEER MAY ORDER THE REMOVAL OF ADDITIONAL UNSUITABLE SOIL THAT MAY BE ENCOUNTERED UPON INSPECTION OF OPEN EXCAVATION. DATUM NOTE : ELEVATIONS REFER TO THE NATIONAL GEODETIC VERTICAL DATUM - 1988 BENCHMARK NOTE, BENCHMARK SHALL BE SET WITHIN 50 FT. OF LEACHING SYSTEM PRIOR TO ANY CONSTRUCTION. REMOVE THESE SOIL HORIZONS SEE 'LEACHING FIELD' NOTE 6 ON SHEEF 2 SOIL TEST RESULTS TEST HOLE: 14-1 11-14-14 GROUND ELEV.= 10.4 _ HOLE: 14-2 DATE: 11-14-14 GROUND ELEV.= 10.3 2-6' A/ SANDY/ 7YR 7/8' 9.9/' 2-6"' A SNJD1f IAAM 7YR 7/8 9.8 6-12' E SAND 5YR 8/1 9.4 6-1Y E SAND 5YR 8/1 8.9 12-48' B SAND 48-120' C SAND 7YR 5/8 1OYR 6/6 6.4 0.4 17-54' a SAND 54-120' C SAND 7YR 5/8 IOYR 6/6 5.8 0.3 GROUNDWATER WEEPING 0 110' 1.23 GROUNDWATER WEEPING 0 108" 1.30 GROUNDWATER ELLV. (2.50 FRIMPTER ADJUSTMENT) 3.73 GROUNDWATER ELEV. (2.5' FRIWW ADJUSTMENT) 3.80 CAPE COD COMMISSION TECOCAL BUIIM 92-001 CAPE COD COMMMON TECHNICAL BUUEHN 92-001 TEST HOLE DATE GROUND ELEV.= TEST HOLE; DATE GROUND ELEV.= TH X14-1 1 3 tmumm Ulm N EiLV.=144 powI PROPO6E0 ' / CIZTRMTm 13I1R m SOIL EVALUATOR JAMES W. NIEvk PLS, C.S.E. B.O.H. AGENT. AMY L vonHONE. R.S., C.H.O. OHSERWIIIpI PIYiT (1130 tF 2) / 1'10 21 OM AGGEGIITE 1 / WAIM RIM PERCOLATION TESTS TEST N0, 14-2 ELEV= 10.3 TEST NO.: ELEV.= TEST NO.: ELEV.= TEST N0- ELEV. DATUM TIME INTERVAL DATUM TIME 1INTERvAL DATUM TIME INTERVAL DATUM TIME fN1ERV WOF SOAK 1:22 - 1:37 SOAK SOAK SOAK CONCRETE BOUND (FOUND TYPICAL) I� 1��`1? ,� JAMES �yN 12. 1:37 12 12" 12" 17.5T NIEVA W.� 11y 11" 10-_ �- �,�� SOUTH WEST DRIVE 39399 10 10 10 10' -9- - - - - - - (GRAVEL ROAD) I01 9' 1.39 9" 9" 9" BENCHMARK TOP OF CONCRETE BOUND 8' 8" 8' 8' EL. 10.39 ,� �3/f' 7" 7" 7" 7" NAND 1988 6' 1:41 6' 6" 6" GRAPHIC SCALE RATE: <2 MPI RATE: RATE; RATE. SITE PLAN ° 10 2D a >a DATE 11-14-14 DATE: DATE: DATE: ;`PTH DE: 36' DEPTH: DEPTH: DEPTH: SCALE: 1 = 20 ' ASSESSORS MAP 25 LOT 302 ( IN �T) I CERTIFY THAT ON JULY 1, 2010, 1 HAVE PASSED THE EXAMINATION APPROVED BY THE i INCH = 20 IST DEPARTMENT OF ENVIRONMENTAL PROTECTION AND THAT THE ABOVE ANALYSIS HAS BEEN PERFORMED ZONING REFERENCE R-25 CONSISTENT WITH THE REQUIRED TRAINING. EXPERTISE. EXPERIENCE DESCRIBED IN 310CMR 15.018(2). BUILDING SETBACK - FRONT YARD = 30' SIDE YARD = 15 ' REAR YARD = 20' (CURRENT ZONING) JAMES W. NIEVA, PLS. SOIL EVALUATOR SE#13258 PROFILE OF SYSTEM TITLE 5 SEWAGE DISPOSAL SYSTEM Pf7Dr&o 11P81140F12'COYER FOR A PROPOSED 5 BEDROOM DWELLING YAI m W r cM OBSERVAI N PIPE LOCATION ir D C4 R Tn SYSIDI (1 1RWQ RUIR FOE AT If ML 40 m 1 1 SOUTH WEST DRIVE RW Fllratl CRAOE GR11ss 2 LWATOM YARMOUTH, MA 02601 SFESFE � Ml fI01E 7 ON SHEET 2 MIN. F:G.=124 2%IE'16AIY SLOPE 15' .• -. :-_• - • •.•. APPLICANT RECORD OWNER: ,- - MIN._<` : _,: -I I I -I � S.L I3ENOIT GEORGE & JANA TARASENKO �"NAGHEOCTAPIIic ff"MUTEUNATION T 206 DEDHAM STREET 87 PATRICKS RUN NORFOLK, MA 02056 STOUGHTON, MA 02072 508-889-5992 _ ° _ Dunn •McKenzie, Inc. 4' SCH 41! PNC W1N b' mm STOfE DISTRIBUTION BOK LEACHING TRENCHES W 5 SI R Sa}ND 206LANDDEDHAM S SURVEYING t1.1A at RN'ERING 15 (AM IDSL"4 (AVT JV CE) NORFOLK. MASSACHUSETTS 02056 TRENCH CONFIT RU ATION (508) 384-3990 - FAX. (508) 384-3905 2 TRENCHES 44.3' LONG SPACED 12' O.C. email: staff®dunnmckenzie.com CONTAINING 7 CULTEC 180 HD CHAMBERS EACH TRENCH TRENCH CROSS SECTION f0T70"4 DATE: JANUARY 16, 2015 SHEET 1 OF 2 1 JOB N0. 5221