Loading...
HomeMy WebLinkAbout59 Squirrel Run - Site PlanDWELLING SYSTEM PR❑EILE TOP FNDN. AT EL. 26.6' - ACCESS COVER TO WITHINN 6" OF FIN. GRADE (NOT TO SCALE> I / ACCESS COVER (WATERTIGHT) TO MINIMUM .75' OF COVER OVER PRECAST WITHIN 6' OF FIN, GRADE 2% SLOPE REQUIRED OVER. SYSTEM PROPUSEDI 500 GALLON SEPTIC TANK (H- 10 ) ( 2 % SLOPE) — DEPTH OF FLOW = 4 TEE SIZES - INLET DEPTH = 10" OUTLET DEPTH 14" FOUNDATION— 10' + 33.1 + J2.b 7h 01-174 RUN PIPE LEVEL' - �FOR FIRST 2' 24.40 �� GAS L9tot 24.13' AFF�LE 24.30' �"� CRUSHED STONE OR MECHANICAL PACTION. (15.221 [23) MIN ( 1 % SLOPE) ( % SLOPE) SEPTIC TANK 10' D' BOX EXISTING LEACH PITS (RE -USE) INVERTS = 23.6± AND 23.9'± (SEE NOTE 11.) 20' PROP. MASTER BEDROOM EXPANSION APPROX. WATERLINE / LOCATION (UNMARKED) 19.7 LEACF"NC FACI!, -TY GARAGE ' PROPOSED I.I 29.75' �` GALLON SEPTIC TANK (H- 10 ) 6' CRUSHED STONE OR MECHANICAL COMPACTION. <15.221 [21> DWELLING: SEPTIC DESIGN: (GARBAGE DISPOSER IS NOT ALLOWED ) T DESIGN FLOW: _3 3EDROOMS ( 110 GPD) = 330 GPD USE A 330 GPD DESIGN FLOW SE -':)TIC TANK: 33C GPD ( 2 ) = 660 UST_ A 1500 GALLON SEPTIC TANK GkRAGE cEFTIC DESIGN: wNOT D-SPDSER I_ _ Al -LOWED _) 'S GN FLOW: ._> 72_DRr!O.+S ( 10 CPD) _ =0_GFD "EP rIC TANK 220 CPD ( 2 > 440 ',.:SE A 1500 GALLON! SEP-, IC TANK EXISTING LEACHING: fit( 6 (2.5) * = 376 PIT SIDES: — #1 BOTTOM: 4''�1� = 50 426 GPD P!7 SIDES; 12-f6 (2.5) = 565 y BOTTOM 6'4 (I.0) = 113 30.2 34.5 --35 678 GPD TOTAL: 1104 GPD NOTE: NO WATER FOUND TO ELEVATION 11.2' PER TROY WILLIAMS, DEP SEPTIC INSPECTOR ON 8/17/01. (THIS ELEVATION IS 7' BELOW THE BASE OF THE LEACH PIT.` BOARD OF HEALTH APPROVED DATE q };� IrJ off 508-362-4541 '✓ !r fn. 508 362-5880 down cape engineering, CIV_L ENGINEERS LAND SUP,VEYEIR"S 939 main s t. varmouth, ma 0'2675 I ROUTE 6A LOCUS Aft PINE ST. LOCATION MAP NTS ASSESSORS MAP 123 PARCEL 82 ZONING DISTRICT: R40 YARD SETBACKS: FRONT = 30' SIDE = 20' REAR = 20' PLAN REF. 322/59 FLOOD ZONE: C NOTES: 1. DATUM IS APPROX. FROM QUAD 2. MUNICIPAL WATER IS EXISTING 3. MTNTM'JM ^Tec PTTru TF1 BF i/R' PER Fnr1T. 4. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHO H-10 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED SEPTIC SYSTEM ONLY AND IS NOT TO BE USED FOR ANY OTHER PURPOSE. S. PIPE FOR SEPTIC SYSTEM TO SCH. 40-4' PVC. 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. 10. CONTRACTOR TO NOTIFY DIG -SAFE AND WATER DEPT. 11. CONTRACTOR TO CONFIRM INVERT 'ELEVATIONS TO LEACH PITS PRIOR TO INSTALLATION OF ANY PORTION OF SYSTEM * ASSUMED MIN. 1' STONE AROUND PIT OF 59 SQUIRREL RUN IN THE TOWN OF: YARMOUTH CP' ORT MA PREPARED FOR: D. K U S H N E R 20 0 20 40 60 , a CALE: 1" = 30' DATE: SEPT. 7, 2001 Df V`� o' ARNE H. -� ARNE OJ LA w [[[ CI L y r s L L � IN, JA LA, ix o "I.S, DA TD