Loading...
HomeMy WebLinkAbout210 Station Avenue Phasing Diagram Phase 1 Second Floor-03SECOND FLOOR - PHASE 1 SCALE: 1'-0" = 1/32" MECH PENTHOUSE - PHASE 1 SCALE: 1'-0" = 1/32" PROVIDE TEMP. PARTITION, LOCKED SOUND/DUST PROOF INDICATES AREA OF WORK 2. NO WORK TO BE PERFORMED IN AREAS OUTSIDE IN EACH PHASE TO BE PERFORMED INDICATED AREA OF WORK UNLESS OTHERWISE NOTED. OUTSIDE OF SCHOOL OPERATING HOURS NO WORK TO BE PERFORMED WITHOUT WRITTEN APPROVAL OF OWNER. ANY SUCH WORK IS TO BE PERFORMED OUTSIDE OF SCHOOL OPERATING HOURS. 3. PATCH ALL SURFACES DISTURBED DUE TO NOTES: INSTALLATION OF TEMPORARY PARTITIONS. 1D REMOVE AND REINSTALL EXISTING CEILING AS REQUIRED TO FACILITATE INSTALLATION OF UTILITIES, SERVICES, SUPPORT AND EQUIPMENT. EXISTING CEILING TO REMAIN IN PLACE UNTIL SUCH TIME AS REMOVAL AND REPLACEMENT CAN OCCUR WITHOUT DISRUPTION TO BUILDING OCCUPANCY. Q2 EXISTING CEILING TO REMAIN IN PLACE THROUGH OUT PHASE. REMOVE AND REINSTALL EXISTING CEILING AS REQUIRED TO FACILITATE INSTALLATION OF UTILITIES, SERVICES, SUPPORT AND EQUIPMENT. 4. LOCATION AND QUANTITY OF LOCKED, SOUND/ DUST PROOF DOOR AND FRAMES FOR CONTRACTOR ACCESS ARE GENERALLY DEFINED. CONTRACTOR SHALL PROVIDE AT LOCATIONS AND IN QUANTITIES AS REQUIRED, BUT AT A MINIMUM AT THE LOCATIONS AND IN THE QUANTITIES SHOWN. 5. ALL LOCKED, DUST/SOUND PROOF DOORS AND FRAMES TO BE FULLY GASKEfED, WITH AUTOMATIC FLOOR SEAL AND CLOSER. SMMA SYMMES MAINZ i MCKEE ASSOCIATES 1000 Massachusetts Avenue Cambridge, Massachusetts 02138 617.547.5400 Fax 617.354.5758 OWNER REVIEW NAME DATE 0 12/02/03 CONSTRUCTION DOCUMENTS NO. DATE DESCRIPTION ISSUE LOG A= CLOUDED CHANGE DENNIS YARMOUTH REGIONAL HIGH SCHOOL 296 STATION AVENUE SOUTH YARMOUTH, MASSACHUSETTS 02664 PHASING DIAGRAM PHASE 1 SECOND FLOOR SCALE V-0" = 1/32" DRAWN BY JLL CHECKED BY PROJ. ARCH. / ENGR. PH PROJ. MGR. JGS JOB NO. 02095.00 0 SYMMES, MAINI & MCKEE ASSOCIATES, INC. 2003