HomeMy WebLinkAbout210 Station Avenue Phasing Diagram Phase 1 Lower Level-03STAFF
ENTRY
LOWER LEVEL - PHASE 1
SCALE: 1'-0" = 1/32"
LEGEND
D. PARTITION OVER DOORWAY
CTURED SIGN "NOT AN EXIT"
SIGNAGE.
TEMPORARY PARTITION
L_
INDICATES
Lmuff
OF
WORK
...... IN EACH
PHASE
INDICATES
AREA
OF
WORK
IN EACH
PHASE
/-III
BE PERFORMED
- - = --' OUTSIDE
OF SCHOOL OPERATING HOURS
L
\
INDICATES
AREA
OF
WORK
...... IN EACH
PHASE
INDICATES
AREA
OF
WORK
IN EACH
PHASE
TO
BE PERFORMED
- - = --' OUTSIDE
OF SCHOOL OPERATING HOURS
NOTES:
1D REMOVE AND REINSTALL EXISTING CEILING AS
REQUIRED TO FACILITATE INSTALLATION OF UTILITIES,
SERVICES, SUPPORT AND EQUIPMENT. EXISTING
CEILING TO REMAIN IN PLACE UNTIL SUCH TIME
AS REMOVAL AND REPLACEMENT CAN OCCUR
WITHOUT DISRUPTION TO BUILDING OCCUPANCY.
Q EXISTING CEILING TO REMAIN IN PLACE THROUGH
OUT PHASE. REMOVE AND REINSTALL EXISTING
CEILING AS REQUIRED TO FACILITATE INSTALLATION
OF UTILITIES, SERVICES, SUPPORT AND EQUIPMENT.
GENERAL NOTES:
1000 Massachusetts Avenue
Cambridge, Massachusetts 02138
617.547.5400 Fax 617.354.5758
J
REFER TO SPECIFICATIONS
01110 FOR PHASE 1 WORK
1. SEE SPECIFICATION SECTION 01110 FOR
MORE DETAILED DESCRIPTION OF WORK WITHIN
EACH PHASE.
2. NO WORK TO BE PERFORMED IN AREAS OUTSIDE
INDICATED AREA OF WORK UNLESS OTHERWISE NOTED.
NO WORK TO BE PERFORMED WITHOUT WRITTEN APPROVAL
OF OWNER. ANY SUCH WORK IS TO BE PERFORMED
OUTSIDE OF SCHOOL OPERATING HOURS.
3. PATCH ALL SURFACES DISTURBED DUE TO
INSTALLATION OF TEMPORARY PARTITIONS.
4. LOCATION AND QUANTITY OF LOCKED, SOUND/ DUST
PROOF DOOR AND FRAMES FOR CONTRACTOR ACCESS ARE
GENERALLY DEFINED. CONTRACTOR SHALL PROVIDE AT LOCATIONS
AND IN QUANTITIES AS REQUIRED, BUT AT A MINIMUM AT THE
LOCATIONS AND IN THE QUANTITIES SHOWN.
5. ALL LOCKED, DUST/SOUND PROOF DOORS AND FRAMES
TO BE FULLY GASKETED, WITH AUTOMATIC FLOOR SEAL AND
CLOSER.
J
OWNER REVIEW
NAME DATE
L- ----- -F- - -�
f �
0 12/02/03 CONSTRUCTION DOCUMENTS
NO. DATE DESCRIPTION
ISSUE LOG
Q = CLOUDED CHANGE
DENNIS YARMOUTH
REGIONAL HIGH SCHOOL
296 STATION AVENUE
SOUTH YARMOUTH, MASSACHUSE7802664
PHASE I
PHASING DIAGRAM
PHASE 1
LOWER LEVEL
SCALE V -O" = 1132"
o DRAWN BY JLL
O CHECKED BY
^ PROJ, ARCH.1 ENGR. PH
PROJ. MGR. JGS
[o " JOB NO. 02095.00
m ® SYMMES, MAINI & MCKEE ASSOCIATES, INC. 2003