HomeMy WebLinkAbout290 Summer Street Civil Site Plan 226"
MANUF. LeBARON, BROCKTON, MA
MODEL• LK 110
LABEL SEWER OR DRAIN AS APPROPRIATE WEIGHT: 475 LBS
TYPICAL ACCESS COVER
SCALE: 3/4" = 1'-0"
BUILDING DOWNSPOUTS 6" LOAM & SEED
ALL DISTURBED
ISl AREAS (TYP,)
ICLEANOUT
TO GRADE 1I 1
6"OSCH40 ROOF DRAW
TO DRAINAGE 2% MIN.
COLLECTOR PIPE 12" SDR35 PVC AT 0.57 MIN.
ROOF DRAINS
GENERAL NOTES: NOT TO SCALE
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PLAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE
(1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR
EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND/OR THE MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STANDARD
SPECIFICATIONS FOR BRIDGES AND HIGHWAYS AS AMENDED TO PRESENT.
ALL SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5.
AND YARMOUTH HEALTH REGULATIONS.
3. VERTICAL DATUM IS NGVD29 ASSUMED FROM TOWN G.I,S. DATA
4. ALL ROOF RUNOFF TO BE PIPED TO DRAINAGE SYSTEM. COORDINATE DOWNSPOUT LOCATIONS
WITH ARCHITECT. ROOF DRAINS 6"0SCH40 PVC AT 1% MIN. PITCH TO DRYWELLS/DRAINAGE
5. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHTO-H-20 UNLESS NOTED.
6. THIS PLAN IS FOR PROPOSED WORK ONLY AND 15 NOT TO
BE USED FOR PROPERTY LINE STAKING.
7. ALL STORM RUNOFF TO BE CONTAINED ON SITE. PROVIDE VEGETATED SWALES IN
PERIMETER AS REQUIRED TO ENSURE RUNOFF IS RETAINED.
8. 4" LOAM AND SEED ALL DISTURBED AREAS NOT PAVED.: = ti -".S C. A -L C='cS >iC7:.
S. ALL SEPTIC PIPING 4"0SCH40 PVC AT 1% MIN. UNLESS NOTED.
10. SEPTIC COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT
INSPECTION BY OWNERS ENGINEER AND PERMISSION OBTAINED,
11. COORDINATE UTILITY INSTALLATIONS WITH APPROPRIATE VENDORS. '
12. 51TE LIGHTING SHALL NOT CAUSE GLARE FOR MOTORISTS, PEDESTRIANS,
OR NEIGHBORING PREMISES.
13. TOPOGRAPHY AND DETAIL LOCATION FROM FIELD SURVEY BY DOWN CAPE
ENGINEERING. ABUTTING BUILDINGS FROM G.I.S. DATA- APPROXIMATE
14. ALL FILL AREAS ARE TO BE CLEARED AND GRUBBED, VIGH TOP AND SUBSOIL REMOVED
PRIOR TO FILL PLACEMENT. ALL FILL TO BE CLEAN STRUCTURAL FILL COMPACTED IN 6"
LIFTS T0. 95% MODIFIED PROCTOR. MAX. DENSITY. AREA -6 UNDER BUILDINGS TO BE -
MONITORED AND INSPECTED BY FOUNDATION ENGINEER. 48 HR. NOTICE REQUIRED.
15. FIRE SPRINKLER SYSTEM TO BE INSTALLED IN BUILDING: FIRE CONNECTION AND
ENGINEERED PLANS (BY OTHERS) REQUIRED TO CODE. COORDINATE LINE W/WATER CO.
16. ALL PROPOSED PAVEMENT TO BE FINISHED WITH CAPE COD BERM 12" X 3"
BERM TO BE CREATED INTEGRAL WITH BASE AND TOP COATS OF ASPHALT WHERE NOTED.
17. GRADE ALL LAWN AREAS TO PROVIDE POSITIVE PITCH AWAY FROM BUILDINGS TO DRAINS/SWALES.
18. SEE LANDSCAPE PLAN FOR PROPOSED PLANTINGS.
r
SEE LANDSCAPE PLANS FOR DETAILED PLANTING SCHEDULE
5"
TIMBER
GUARD RAIL
SCREENING/PLANTINGS PER LANDSCAPE PLAN
0
SUtttNINU/toLANIINUb F'tK LANUSIUAHt PLAN
_
•
PITCH TO DRAIN BACK
A
20" MIN.
N
i
12"0H-20 HDPE
D*
NOTE: PLACE FILTER FABRIC BETWEEN
MDC
BIORETENTION BASIN
DETAIL
AF4/aVE AND GRATES UNTIL PARKING
l
6' CHAIN LINK FENCE AROUND
0000°o0a0q°°o°°o° '
H-20
IS PAVED AND FOR RETENTION BASIN
PLAN VIEW
/RETENTION BASIN.
1000 GAL.
- NOT TO SCALE -
PROPOSED
,ws
BLACK VINYL COATED LINKS.
ACCESS COVER TO GRADE STABILIZED.
SEE DETAIL.
1000 GALLON PRECAST
H-20' CATCH BASIN
00°00°o0'o°a o00o°a0
n
" LOAM & SEED DISTURBED AREAS (TYP.)
'0X6'-8" SHOREY SOLID
0000000000c0o0o00
0 0 0 °oco°°0o°0°
.
ADJUSTINC BLOCKS/RISER AS RED.
BASIN
BASIN H-20 OR EQUAL..0
'°o°o0a°000°°0°0°0
(TYP,)
MORTAR ALL COMPONENTS (TYP.)
°O
°000000000w°000
7211
WORKING LIO. LEVEL RANGE
rWF
0000o0oo°Oco°o 0
0 0 00° co0o0ooo
°.o"o.,°„°„c o
oa 000 oa0000000
000000 v00000vo,
PROPOSED GRASS LINED BIORETENTION BASIN
SE TIONAP
L LAT
-
^a
°00
3
EXCAVATE TO UNE & GRADE SHOWN ON PLAN
BOTTOM STONE
ELEV. 71.2
vi 48"
4" LOAM & SEED LINING
71 0±
6'
_
1
°° Oo
ON BOTTOM AND SIDE SLOPES. +I 6"
NATURAL STONE TRAPROCK APRONS
°
°o
°
LeBARON OR EQ. `O
BELOW SWALE ENTRANCE
.RESERVE
9000 GAL 3000 GAL.
3
°Oa
4"MANIFOLD INVERT EL. t IN CENTER, - L u. NOTE: DISTURBED SOILS IN LEACHING AREA
68'0 RAISE TO AT ENDS (0.5% PITCH DRAINS TO PUMP CHAMBER) AND REPLACE WITH CLEAN MEDIUM SAND FROM
DRAINBACK OWNERS ENGINEER TO INSPECT & CERTIFY
I PROP H-20 F&G 2' ABOVE BOTT.
INV
°
\/
23.5" FRAME
73' AT 1.57
-
°°°
BOLT SECURELY IN PLACE
2'01.0. PRECAST
°0°
CONCRETE RISER'.
PUMP CHAMBER
1.0' WORKING RANGE
°
°O
H-20 MORTAR ALL
REMOVE ANY LOAMY MATERIAL
o°
COMPONENTS
FROM BENEATH RETENTION
BASIN BELOW RIM GRADE
°o°
SUMP 1>41
DUPLEX COULD PUMPS- 3.0 HB
ON STAINLESS RAIL MOUNT SYS EM
9000 GAL. H-20 TANK CLEARWELL PUMP CHAMBER
AND REPLACE WITH CLEAN
SAND. COVER WITH -
`i �)
°0
4" LOAM AND HYDROSEED
BASIN AREA
°O
. °O°O°
°° /
SEE LANDSCAPE PLANS FOR DETAILED PLANTING SCHEDULE
5"
TIMBER
GUARD RAIL
SCREENING/PLANTINGS PER LANDSCAPE PLAN
0
4'0 MANHOLE
12" SDR35 DRAIN UNE
0.5% min.
SECTION VIEW
NGE MANHOLE DET
NOT TO SCALE
CONCRETE MINIMUM STRENGTH: 5000 PSI AT 28 DAYS
STEEL REINFORCEMENT: ASTM -AS -615 GRADE 60
DESIGN LOADING: AASHTO HS -20 -
4" MIN. PEASTONE
AND MIRAFI 140NS
FABRIC OVER STONE
F&C'S TO GRADE
-1,(NOT SHOWN)
PLANT SIDES WITH GRASS STONE MULCH BETWEEN SHRUBS
'
MIX OR STONE MULCH PER
LANDSCAPE SPECS. Oao ° MAX. SLOPE 3:1
` TRANSITIONAL 4:1 TYP,
HERBACEOUS 4
VEGETATION \ \
SEE LANDSCAPE PLAN
SOIL/FILTER MIX
50% SAND �12" COARSE SAND OVER PARENT MATERIAL
20% COMPOSTED 30% TOPSOIL 12" DEEP LEAVES
RAIN GARDEN DETAIL
- NOT TO SCALE -
CLEANOUT DETAIL:
Le BARON CAST IRON LAO910 SEE PAVEMENT SECTION
H-20 RATED FEMALE ADAPTOR & THREADED
VALVE BOX SLEEVE TO ALLOW MOVEMENI
GRACE AT EA.A. END.
4"OSCH40 PERFORATIONS DOWN POURED CONCRETE DONUT
VENT AS SHOWN 1.5 CU,FT.±
S JUST INT
EAO\
EASTONE
TEE FABRIC OVER VENT
n \� 2"OSCH40 PVC O°pqe 0r 6A ` 2"OSCH40 LATERAL op4l 90' ELECTICAL CONDUIT SWEEP
0 08 da
_ 3"SCH40 PVC DRAIN BACK LINE TO PUMP CHAMBER , RISER
3" CAST IRON
CHECK VALVES
3"PVC BALL VALVES (2)
3"PVC TO PUMP VANIEb
�4"X2" TEE 1/4 ORIFICE IN LATERAL
PIT T_60" O.C. WITH SHIELDS (TYP.) BOTTOM STONE
ALL JOINTS SEE PLAN FOR LOCATIONS
4 -SHRINK GROUT 4"SCH 40 PVC MANIFOLD '
MANHOLE COVER SEE DETAIL SIDE ELEVATION VIEW
MORTAR ALL COMPONENTS (TYP,)
TYP EEPHOLE / 24" I.D. PRECAST CONC. RISER AS REQ.
/4'0 PRECAST DONUT 1" OVER FIELD
✓ 4" THICK 4000 PSI CONC. W/WWF
°. 18"0 OBSERVATION HOLE. IN CTR. LATERALS
'RESSURE FLOW
TO LEACHING LEACHIN4FIELD
° I `
FIELD SAS
0
down
•
PITCH TO DRAIN BACK
.° 75.5± 72.0 TOP STONE
>- .;;....,. °° • r_
20" MIN.
N
i
12"0H-20 HDPE
- YARMOU7HPOR7, MASS.
NOTE: PLACE FILTER FABRIC BETWEEN
MDC
0°°0°000000U o�Oo°
6'-8" X 6'0
AF4/aVE AND GRATES UNTIL PARKING
l
Tom-" r d
0000°o0a0q°°o°°o° '
H-20
IS PAVED AND FOR RETENTION BASIN
PLAN VIEW
O
1000 GAL.
INLETS, UNITL GROUND COVER HAS
PROPOSED
° ° ° ° U°a°o°
°00000o0o0co°o°°°
LEACHPIT
ACCESS COVER TO GRADE STABILIZED.
SEE DETAIL.
1000 GALLON PRECAST
H-20' CATCH BASIN
00°00°o0'o°a o00o°a0
SHOREY OR EQUAL
a
'0X6'-8" SHOREY SOLID
0000000000c0o0o00
0 0 0 °oco°°0o°0°
.
ADJUSTINC BLOCKS/RISER AS RED.
BASIN
BASIN H-20 OR EQUAL..0
'°o°o0a°000°°0°0°0
(TYP,)
MORTAR ALL COMPONENTS (TYP.)
°000000000w°000
7211
WORKING LIO. LEVEL RANGE
rWF
0000o0oo°Oco°o 0
0 0 00° co0o0ooo
°.o"o.,°„°„c o
oa 000 oa0000000
000000 v00000vo,
-
SE TIONAP
L LAT
-
^a
6.00'
3
3"SCH40 C P 12" PERF. HOPE PITCH TO DRAIN BACK AT 0.5%
PUN- OU7 WELL SEE ORIFICE SHEILD DETAIL
BOTTOM STONE
ELEV. 71.2
vi 48"
4'0 MANHOLE
12" SDR35 DRAIN UNE
0.5% min.
SECTION VIEW
NGE MANHOLE DET
NOT TO SCALE
CONCRETE MINIMUM STRENGTH: 5000 PSI AT 28 DAYS
STEEL REINFORCEMENT: ASTM -AS -615 GRADE 60
DESIGN LOADING: AASHTO HS -20 -
4" MIN. PEASTONE
AND MIRAFI 140NS
FABRIC OVER STONE
F&C'S TO GRADE
-1,(NOT SHOWN)
PLANT SIDES WITH GRASS STONE MULCH BETWEEN SHRUBS
'
MIX OR STONE MULCH PER
LANDSCAPE SPECS. Oao ° MAX. SLOPE 3:1
` TRANSITIONAL 4:1 TYP,
HERBACEOUS 4
VEGETATION \ \
SEE LANDSCAPE PLAN
SOIL/FILTER MIX
50% SAND �12" COARSE SAND OVER PARENT MATERIAL
20% COMPOSTED 30% TOPSOIL 12" DEEP LEAVES
RAIN GARDEN DETAIL
- NOT TO SCALE -
CLEANOUT DETAIL:
Le BARON CAST IRON LAO910 SEE PAVEMENT SECTION
H-20 RATED FEMALE ADAPTOR & THREADED
VALVE BOX SLEEVE TO ALLOW MOVEMENI
GRACE AT EA.A. END.
4"OSCH40 PERFORATIONS DOWN POURED CONCRETE DONUT
VENT AS SHOWN 1.5 CU,FT.±
S JUST INT
EAO\
EASTONE
TEE FABRIC OVER VENT
n \� 2"OSCH40 PVC O°pqe 0r 6A ` 2"OSCH40 LATERAL op4l 90' ELECTICAL CONDUIT SWEEP
0 08 da
_ 3"SCH40 PVC DRAIN BACK LINE TO PUMP CHAMBER , RISER
3" CAST IRON
CHECK VALVES
3"PVC BALL VALVES (2)
3"PVC TO PUMP VANIEb
�4"X2" TEE 1/4 ORIFICE IN LATERAL
PIT T_60" O.C. WITH SHIELDS (TYP.) BOTTOM STONE
ALL JOINTS SEE PLAN FOR LOCATIONS
4 -SHRINK GROUT 4"SCH 40 PVC MANIFOLD '
MANHOLE COVER SEE DETAIL SIDE ELEVATION VIEW
MORTAR ALL COMPONENTS (TYP,)
TYP EEPHOLE / 24" I.D. PRECAST CONC. RISER AS REQ.
/4'0 PRECAST DONUT 1" OVER FIELD
✓ 4" THICK 4000 PSI CONC. W/WWF
°. 18"0 OBSERVATION HOLE. IN CTR. LATERALS
'RESSURE FLOW
TO LEACHING LEACHIN4FIELD
° I `
FIELD SAS
_ 76.Ot b LOAM & 5LLU OR OTHER SIABIULAHUN- SEE LAN05CAPE PLANS - EL. 73.8 MIN SEE DETAIL
(TYPO 75.5±
75.5± 4"SCH40 PVC VENT LINE PITHES BACK TO AMPHIDROME UNIT AT 17°
down
•
PITCH TO DRAIN BACK
.° 75.5± 72.0 TOP STONE
>- .;;....,. °° • r_
20" MIN.
LAND SURVEYORS
12" PERF. HDPE
- YARMOU7HPOR7, MASS.
PUMP OUT WELL
TO SAND AT BOTTOM
OF LEACH FIELD
4"SCH40 PVC
PLAN VIEW
INSPECTION
PORT DETAIL
MANIFOLD
ACCESS COVER
SEE DETAIL. EL. 49.5±
INV. 72.0
DATE
a
ADJUSTING BLOCKS/RISER
AS REQ.
MORTAR ALL COMPONENTS
(TYP,)
7211
WORKING LIO. LEVEL RANGE
rWF
3" SCH-40
� 11
-
-
3
Z
5' O.C.
LEACHING FIELD
1/4" ORIFICE AT 5' O.C.
WITH ORIFICE SHIELD
5" 3" CAST IRON
Sampling I
6" LOAM &SEED ALL DISTURBED AREAS NOT PAVED., 12"X3" CAPE C00 BERM INTEGRAL WITH TOP COURSE Pressure Ta PITCH POUR 1 CU. FT. MIN.
CHECK VALVE (Yp) P I POU PSI CONC
/ WHERE INDICATED - t A05
\ J NOTE: CONCRETE CURBING REQ. ENTRANCE AREA o BALL VALVE 3"PVC TO PUMP / /THRUST BLOCK
\\k6 AROUND CONNECTION
H-2( 4'0 MANHOLE
O.5% PISCFL
rz
PLAN VIEW "' t t';d DCLOCK POSITION)"^= 3- PRESSURE FLOW I _
EXTEND GRAVE_ E" M.N./ TO LEACHING
PAST EDGE PAVE '31/8- WEEP OLE PITCH TO DRAIN BACK COMPACT BACKFILL o
REMOVE TOP & SUBSOIL - LATERALS 6' CENTER TO CENTER SEE PAVEMENT SECTION o SEPTIC PIPING DETAILS
COMPACT SUBGRADE
NOTE: REMOVE FROST SUSCEPTIBLE MATERIAL 58" '9 MIRAFI 140N FABRIC OVER STONE
TO A DEPTH OF 36" BELOW FINISHED GRADE.
.REPLACE WITH NON FROST SUSCEPTIBLE MATERIAL 3"SCH40 PVC DRAIN BACK LINE TO PUMP CHAMBER 2"PEASTONE WITH FABRIC OVER
(LESS THAN 10% PASSING #200 SIEVE)
NOTE: COMPACT ALL FILL IN 6" LIFTS TO 95% MOD. - - SECTION VIEW • ° • °„ ° • • • •° _ • ° ° • ° • ° ° • � _ • ° ° • .. ° ° � °° , , • 2'
PROCTOR DENSITY WITH VIBRATORY ROLLS - °o°o°o° ° o°o°o°o°°°o°o°o°°°o°o°o° °o°o°a°o°o °° ° o°o° 2"
N CUMPACTER. -- o a0o 0 0 0°°0°°000000°o°Oo°a°Oo°°°°°o°°o°°°o°°°°o °o°°io°°o°0
12" 0°000000 M 00Og0o000 o0gOg0o0°0°0°0°0°0°0°V o0Q o0Oo000000c000°O0o0
°D°°°°° o°°°o°°°°°o°°°o°o°°°o°°°o°°°o°°°°°o°o°i°°o°°°oo°o°o°o a000 ,
PAVEMENT CROSS SECTION
VALVE PIT DETAIL °°°°° ° °°°°°°°°o°°°o°°°°° a°°°°°°°0°°°°° °0°°°a
Q 000°00 00°000°0 0°0°000°0°0a000°0°0°000°0°0°0°'°00°0000°000000 000
° •-L
NOT TO SCALE NOT TO SCALE 2""0SCH40 PVC 10" TOTAL OF .75" - 1.5" STONE° ° ORIFICE SHIELD OS200
CONCRETE MINIMUM STRENGTH: 5000 PSI AT 28 DAYS DOUBLE WASHED ONLY
STEEL REINFORCEMENT: ASTM -AS -615 GRADE 60 WITH 1/4" ORIFICES ORENCO SYSTEMS INC
DESIGN LOADING: AASHTO HS -20
DRILLED AT 5' O.C. ENGINEER TO INSPECT PH. 1-800-346-9843
AT 12 O'CLOCK POSITION OR ECUAL SEE DETAIL
LEACHING FIELD SECTION
NOT TO SCALE
EL. 75.5 MAX. VENT W/ STAINLESS BUGSCREEN
INRDFrT1nAl °nDT --�
FIRST FLOOR
76.51
_ 76.Ot b LOAM & 5LLU OR OTHER SIABIULAHUN- SEE LAN05CAPE PLANS - EL. 73.8 MIN SEE DETAIL
(TYPO 75.5±
75.5± 4"SCH40 PVC VENT LINE PITHES BACK TO AMPHIDROME UNIT AT 17°
down
•
cope
.° 75.5± 72.0 TOP STONE
>- .;;....,. °° • r_
20" MIN.
LAND SURVEYORS
72.5
- YARMOU7HPOR7, MASS.
TU
"FLOW ACKWASH
4SCH40 AT 27 MIN.
-
INV. 72.0
DATE
-.11C I - --
INE INV. 71.5 t8)4 Q05CH40 PVC LATERALS IWITH
�. INV.
-
7211
WORKING LIO. LEVEL RANGE
rWF
3" SCH-40
,'
-
3"SCH40 C P 12" PERF. HOPE PITCH TO DRAIN BACK AT 0.5%
PUN- OU7 WELL SEE ORIFICE SHEILD DETAIL
BOTTOM STONE
ELEV. 71.2
71 0±
6'
_
.RESERVE
9000 GAL 3000 GAL.
4"MANIFOLD INVERT EL. t IN CENTER, - L u. NOTE: DISTURBED SOILS IN LEACHING AREA
68'0 RAISE TO AT ENDS (0.5% PITCH DRAINS TO PUMP CHAMBER) AND REPLACE WITH CLEAN MEDIUM SAND FROM
DRAINBACK OWNERS ENGINEER TO INSPECT & CERTIFY
EXCAVATE TO CLEAN VIRGIN
APPROVED SOURCE.
ALL SYSEM COMPONENTS.
INV
UTILITIES & STORAGESEPTIC
ansEMENrs
N FULL1::�3
73' AT 1.57
-
PUMP CHAMBER
1.0' WORKING RANGE
4'0 VALVE PIT MANHOLE
67.5
9000 GAL.H-20 SEPTIC TANK
- ACME PRECAST 0p EQUAL
SUMP 1>41
DUPLEX COULD PUMPS- 3.0 HB
ON STAINLESS RAIL MOUNT SYS EM
9000 GAL. H-20 TANK CLEARWELL PUMP CHAMBER
`i �)
s"
L
PROFILE
7. NOTE: GROUNDVIATER 40'+ BELOW SURFACE BOTT. TH
. 4'0 AMPHIDROME REACTOR (VERIFY EXACT DIMENSIONS OF ALL STRUCTURES PRIOR TO SETTING- INVERT ELEVATIONS TO BE HELD) PER TEST WELL RESULTS -
SCHEMATIC SITE&SEPTIC DESIGN
05-077
INTERNATIONAL FUND FOR ANIMAL WELFARE YARMOUTH, MASSACHUSETTS designLAB ARCHITECTS DOWN CAPE ENGINEERING, INC.
STEPHEN STIMSON ASSOCIATES LANDSCAPE ARCHITECTS
MATERIAL
CIVIL SITE PLAN
OF LAND AT
264 WILLOW STREET
IN
YARMOUTHPORT, MA
PREPARED FOR:
LF.A.1iV.
DATE: MARCH 1, 2006
REVISED: APRIL 13, 2006 (CCC, TOWN COMMENTS)
REVISED: MAY 16, 2006, (DD SET)
Scale: 1"= 40'
0 20 40 60 8D 100 FEET
off 508-362-4541
fax 508 362-9880
down cope engineering, in c.
CIVIL ENG/NEE-RS .
LAND SUR ITE MORS
939 Main Street - YARMOUTf-1PORT, MASS.
C,:v
l
05-077 SITEPLAN.DWG
L
IFAW Headquarters
Yarmouthport, MA
designLAB architects
374 Congress St. Suite 507
Boston, SIA 02216
t 617 350 3005, f 617 350 6006
.RSI/
NH 508-362-1511
k. 50e 362-8880
down
cope
engineering, inc.
CIVIL ENGINEERS
LAND SURVEYORS
939 Ma/n Street
- YARMOU7HPOR7, MASS.
Key Plan
Legend
�•' 3�T1'lt6c �•�. � -2 ARNE H �'
z OJALA
CIVIL
N 30792
s� .a
DESIGN O NT- NOT ISSUED CONSTRUCTION
MARK
DATE
DESCRIPTION
PROJECT NO: 05.002
DRAWN BY: DAO
CHECKED BY: AHO
DATE: MAY 49, 2006
SCALE: AS NOTED
Drawing Title:
CIVIL DETAIL SHEET
100% Design Development Set
C1,1