Loading...
HomeMy WebLinkAbout55 Stratford Lane - Septic Design 2TOP OF FOUNDATION ELEV. - eLL-N ,b A A . SOIL TEST 20 FT. MINIMUM FROM CELLAR DATE OF SOIL TEST xlo✓ 15 )'jG uv TO r 10 FT: MINIMUM FROM SLAB OR CRAWL SPACE SOIL TEST DONE BYSK N�G �� / ! CLEAN SAND WITNESSM BY 1. V CONCRETE at .o OBSERVATION HOLE 2 t"EtF�i, ' 'rt ;7 COVERS LOAM AND SEED OBSERVATION HOLE 1 ELEV.- r FI { ! PERCOLATION RATE MW./INCH AT INCHES PERCOLATION RATE MIN./INCH 4- SCHEDULE 40 PVC PIPE t "Z- � Z � L ? - HORIZ 40 CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4- PER FT. COLOR MOTT. I MIN. PITCH 1/0 PER FT. ` ° 2 LAYER OF 1/8- TO 1/2 - /2 - ED STONE ED VENT NOT REQUIRED 1 CU. FT. OF PROJECT LOCATION f G i SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 3983922 SOUTH DENNIS, MASS. 02660 CONCRETE r I /��t..! i. i'ly�r �J IJ �� •'_ ., ... ,. ANCHOR - tea.: r i REVISEYD FLOW UNE �f SHEET . `t -,OF 1 " 10 REVISED ELEV. –TMIN. �G i 2.o- . . S t o ° �i 7 7 a, 7 V LEVEL r ILL e a EL.EV. l� ELEV. = GAS ELEV. ELEV. - = aZ{ 9 6- SV = r a BAFFLE DISTRIBUTION T OUTLET EV e BOX w HIGH CAPACITY INFILTRATORS STONE N AN WITH LIQUID MID 1>� TO BE PLACED ON FIRM BASE) z DEPTH HORIZ TEXTURE COLOR MOTT. I OTHER PROJECT LOCATION f G i SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 3983922 SOUTH DENNIS, MASS. 02660 i r I /��t..! i. i'ly�r �J IJ �� •'_ ., ... ,. f r J - tea.: r i REVISEYD r SHEET . `t -,OF 1 " LOCATION MAP REVISED IZ4P DEPTH HORIZ TEXTURE oR M077 -_PPERI. PROJECT LOCATION f G i SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 3983922 SOUTH DENNIS, MASS. 02660 �J IJ �� •'_ ., ... ,. f r J - tea.: r i REVISEYD r SHEET . `t -,OF 1 " LOCATION MAP REVISED ( 70 BE WATER TESTED f F'. ^ 1500 GALLON II t 3c, TIL TRENCH FORMATION /7� 9� , J. , �.—.ELEV ; IF MORE THAN ONE OUTLET 6 WATER ENCOUNTERED AT 1'.: (TO BE PLACED ON FlRM BASE) SOIL ABSORPTION { �, t�AATER ENCOUNTERED AT E1 EV• m SEPTIC TANK 3/4- To 1 1/2- CLEAN INDNE-Eic SYSTEM (SAS) APPRovED DOUBLE WASHED STONE ADJUST FREE of FINES & SILT LEGEND: DESIGN CALCULATIONS,NUMBER OF 'ROOMS > 1aRr.taurr USGS PROBABLE WATER TABLE ELEV. - EEXISTING XISTING SSPOT EL ATION 00 0 GARBAGE DISPOSAL UNIT NO G hl� SEWAGE DISPOSAL SYSTEM PROFILE OBSERVED WATER TABLE ( / / ) ELEV. T— TOTAL ESTIMAFlow _ NOT TO SCALE � f# y BOTTOM TEST HOLE ELEV. a FINAL CONTODUR-----FINAL SPOT ELEVATION WIRED 5EP/TIC�ANK CAPAgTBR) 10 QAL/tAY SOIL TEST LOCATION POLE -� ACTUAL SIZE OF SEPTIC TANK 1500 GAL -- UTILITY ! TOWN WATER —WW SOIL CLASSIFICATION _ I _ �– /ON DESIGN PERCOLATION RATE . 5 MIN./IN. CATCH BASIN J GAS LINE \ EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F. ry/ \ CLEAN OUT C LEACHING SQ. FT: CESSPOOL C.P. Q cr LEACHING CAPACITY (AREA X RATE)�GAL/DAY + RESERVE LEACHING CAPACITY 3�i GAL/DAY NOTES: 1. ALL WORKMANSHIP AND MAZER SHALL CONFORM TO D.E.P. TITLE 5 AND THE TOWN OF rs ro �i r f RULES AND FOR THE _OF SEWA 2. ALL COVERSSTo SANITARY UNITSASHALL BE BROUGHT TOS W WITHIN 6. OF FINISHED GRADE 1 j f` 10. ALL UNSUITABLE MATERIAL SHALL BE RI MOM FROM UNDER AND 3- ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF � FOR A M'StlMUL1 OF 6' AROUND 9011, ABSORPTION SYSTEM AND BE WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN REPLACED IM MATERIAL n €PEC!!n 310 CMR 15253 (3j 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE A NEXIATIVE CRADE OF 3/4 PER FOOT FOR A MWJU OF 15 USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS. BE It wiftm AWAY FROM THE F AT10V 4. ANY MASONARY UNITS USED TO BRING LAVERS TO GRADE SHALL t� j �2. A VAFJANCE OF 1.V IS REQUIRED FOR THE TOP OF FOUNDATION BE MORTAREDINN HAS BEEN MADE AS TO COMPLIANCE WITH \�MMY 00 ABOVE HIGH POINT M ROAD. 5. NO DETER DEEDED OR ZONING REGULATIONS. OWNER / APPLICANT IS TO OBTAN SUCH DETERMINATION FROM APPROPRIATE AUTHORITY. 6. UTILITIES SHOWN ARE APPROXIMATE ONLY. IXCAVATION CONTRACTOR IS TO CALL 'DIG–SAFE- AT 1-888-344-7233 AT LEAST 72 HOURS PRIOR TO COMMENCING WORK ON SITE. v 7. CONTRACTOR S To VERIFY GRADES AND ELEVATIONS AS WELL AS ITT/ "%; ~! SITE IS TORE O BROUGHT TO THE ATTENTION DITIONS PRIOR TO COMMENCING WE ON IT NY ATION DEQ ENE. ANY VR i IMMEDIATELY. j B. PARCEL IS N FLOOD ZONE C 9. LOT IS SHOWN ON ASSESSORS MAP AS PARCEL fr 1� 42 6� G- o �r� APPROVED: BOARD OF HEALTH ( IV DATE AGENT r fr / J 1 . l j ENGINEEf?I� f / r l f ff PROPOSED SEPTIC DESIGN FOR PROJECT LOCATION f G i SWEETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 3983922 SOUTH DENNIS, MASS. 02660 DATE REVISEYD JOB SHEET . `t -,OF 1 " LOCATION MAP REVISED