HomeMy WebLinkAbout8 Strawberry Lane - Site Plan 2ASSESSORS MAP 122 PCL 81
DEED REFERENCE: DB 3044 PAGE 262
ZONING DISTRICT: R-40
SETBACKS: 30' FRONT, 20' SIDE, 20' REAR
MAX BUILDING COVERAGE: 25%
FIAODZONE: C
LOT SIZE: 20,006 SFt (0.67AC.t)
NOT IN APD DISTRICT
EXISTING USE: Al SINGLE FAMILY DWELLING
PROPOSED USE: Al USE AND P9 MUSEUM USE
LEGAL: PAUL C. WIGHTMAN, ESQ.
3267 MAIN STREET
P.O.B. 1048 BARNSTABLE, MA 02630
PH. 1-508-362-1900
FAX 1-5DB-362-7912
TH1 DATE: 4/3/96
PERFORMED BY: PON CADILLAC, PLS
WITNESSED BY: AML' VON HONE RS BOH
PERC RATE: <2MIN/IN IN C2 ASSMD.
DEPTH ELEVATION
0"
30"
PERCHED WATER 60"
TABLE
SEASONAL ONLY 84"
NO ADJUSTMENT
REQ.
C2 LAYER
COARSE SAND
7.5YR 6/6
41.6
39.1
36.6
34.6
132" 1 1-30.6 NO WATER
FOUND BELOW
SOIL LOG
PERCHED LAYER
NOT TO SCALE
2'-10"
26"
MARSH
Le BARON, BROCKTON. MA
I
!1
ROSE
~ LOCUS
MODEL:
LT 105
RO TE 6A G
`
I
WEIGHT:
0
�• Z
TY.
ICAL
3 �4,�p
COVER
UTILITY POLE
N
f
SCALE: 3/4" = 1'-0'
_
Cs
LABEL
SEWER OR DRAIN AS APPROPRIATE
RR TR4CKS
i
32'
THE EDWARD GOREY HOUSE"
-
T.O.F. - 43.0 430
`! O
i
r
42
EXISTING CONTOUR
X X
EXISTING FENCE
41
LOCUS MAP
+ 47.5
SPOT GRADE
SCALE 1" = 2083'
l
ASSESSORS MAP 122 PCL 81
DEED REFERENCE: DB 3044 PAGE 262
ZONING DISTRICT: R-40
SETBACKS: 30' FRONT, 20' SIDE, 20' REAR
MAX BUILDING COVERAGE: 25%
FIAODZONE: C
LOT SIZE: 20,006 SFt (0.67AC.t)
NOT IN APD DISTRICT
EXISTING USE: Al SINGLE FAMILY DWELLING
PROPOSED USE: Al USE AND P9 MUSEUM USE
LEGAL: PAUL C. WIGHTMAN, ESQ.
3267 MAIN STREET
P.O.B. 1048 BARNSTABLE, MA 02630
PH. 1-508-362-1900
FAX 1-5DB-362-7912
TH1 DATE: 4/3/96
PERFORMED BY: PON CADILLAC, PLS
WITNESSED BY: AML' VON HONE RS BOH
PERC RATE: <2MIN/IN IN C2 ASSMD.
DEPTH ELEVATION
0"
30"
PERCHED WATER 60"
TABLE
SEASONAL ONLY 84"
NO ADJUSTMENT
REQ.
C2 LAYER
COARSE SAND
7.5YR 6/6
41.6
39.1
36.6
34.6
132" 1 1-30.6 NO WATER
FOUND BELOW
SOIL LOG
PERCHED LAYER
NOT TO SCALE
2'-10"
26"
I� D-10001100
C.'. i000❑❑0
C '❑000^0❑
❑
01'1 ❑00
❑000❑❑❑0
❑CEJ❑❑❑❑❑
LEGEND II
MANUF.
Le BARON, BROCKTON. MA
I;
+,NATER CATE
-W_
MODEL:
LT 105
HYDRANT
`
I
WEIGHT:
430 LBS
TY.
ICAL
ACCESS
COVER
UTILITY POLE
SCALE: 3/4" = 1'-0'
_
2 STORY WOODFRAME DWELLING
LABEL
SEWER OR DRAIN AS APPROPRIATE
, one
32'
THE EDWARD GOREY HOUSE"
-
T.O.F. - 43.0 430
`! O
24'
42
EXISTING CONTOUR
I� D-10001100
C.'. i000❑❑0
C '❑000^0❑
❑
01'1 ❑00
❑000❑❑❑0
❑CEJ❑❑❑❑❑
LEGEND II
(i
SEPTIC MANHOLE 'I
i�
I;
+,NATER CATE
-W_
it
WATER LINE
,S,Y�
HYDRANT
`
I
PROP. LIGHT
g�
t
0-0
PROPOSED SIGN
,f
UTILITY POLE
PROPOSED HCP SIGN
V
2 STORY WOODFRAME DWELLING
, one
PROPOSED LEACHING PIT
THE EDWARD GOREY HOUSE"
T
T.O.F. - 43.0 430
`! O
PROPOSED CATCH BAS'N
42
EXISTING CONTOUR
X X
EXISTING FENCE
41
I
TELEPHONE RISER
+ 47.5
SPOT GRADE
TH1
l
SOIL TEST HOLE
off 508-362-4541
1F fax 508 362-9880
down cope engineering, in c.
CIVIL ENGINEERS
LAND SURVEYORS
939 Main Street - YARMOUTHPORT, MASS.
01-070 - -
FRAME AND GRATE
SCALE: 3/4" = 1'-0"
MINIMUM WEIGHT: 388 LBS.
H-20 RATED LEBARON OR EQUAL
ya.
PROPOSED H-20 F&G HEAVY DUTY H-20 COVER
2•X 2' GRATE (TYP.) LABELED "DRAIN"
SEE DETAIL DRILL 2) 1"0 HOLES IN COVER
RIM EL 40.30
SEE PAVEMENT CROSS SECTION
FFJ
COMPACT &ACKFlLL IN G
el. 36.0 H-20 LIFTS (TYP. ALL DRAINAGE)
DRILL (2) I'm PRECAST MIRAFI 140N FABRIC OVER
MORTAR ALL COMPONENTS HOLES H-20 RISERS REPLACE
(TYP.) �.,12"m HDPE AS REQ. SILT LOAM 3" MIN. PEASTONE
ADS N-12 OR EQ. TYP. WITH COMPACTED
' SAND BACKFILL
2.0'
EL 34.6
120. 'IPE I
P ,3SED ELBOW 2.0'JEQ
STRUCTURE TO BE SET IN
I''j Ci. ION PRECAST I COARSE SAND LAYER.
H-20-t:ATCH BASIN ct 1 NOTIFY ENGINEER IF SOILS
4 '• DIFFER FROM SOIL LOG.
6`0X(;' -f, 20 DR SOU , I !
13ASa I -2D 011EOUALJ.'_JfI ': 10I,7CTIONAL PLATE i" 6'OX6LP1000:
WASHED STONE (TYP.) s, _..._....
8" WASHED STONE UNDERNEATH
4' MIN AROUND PIT STRUCTURE
DRAINAGE CROSS SECTION
SEPTIC REVIEW:
THE EXISTING SEPTIC SYSTEM IS DESIGNED TO ACCOMMODATE A Ll( V OF
584 GALLONS PER DAY, BASED ON A 2 MIN. PER INCH PERC. RATE
4 BEDROOM DWELLING UNFT 440 GPU
MUSEUM (RETAIL TYPE FLOW) 1903 SF (50/1000) 95 GPD
535 GPD OE31G FLOW
UTILIZE EXISTING 584 GPD CAPR.CTTY SEPTIC SYSTEM
(SEE PLANS ON FILE WITH THE HEAL"r-H DEPARTMENT)
i BENCHMARK - HYDRANT ON
ILII TAG BOLT
EL = 42.655 (ASSMD)
Y
0.
70
" Ao
�ZZ
4RT O
r a
7.
Z 4 zr
7c =
G Z
>< I c1
✓40, .40.
4 r
0.4
02
PROPOSED EXTERNALLY
UT FREE STANDING SIGN
RETAIN EXISTING
VEGETATNE SCREENING I
N &G
I o (4
0 0
40.2
X
MAP 122 PCL 80
NOT TO SCALE
PARKING CALCULATIONS:
1 DWELLING UNIT (2 SPACES/UNIT) 2.0 SPACES
MUSEUM GUESTS- 12 PERSONS MAX. (1/3) 4.0 SPACES
6.0 SPACES REQUIRED
6.0 SPACES PROVIDED
521 CMR: 1 ACCESSIBLE SPACE REQUIRED
ONE VAN ACCESSIBLE SPACE PROVIDED
51.2
320.
1:12 HCP RAMP H-10'-
�. J
10 GAL
o
rr w H 10 P/C - J + 53.6
41
PROPOSED IK RACK
8.0' PRO SED PAVED
PARK[ AREA
F&C NOTE:
F7L. 40.30 V11 PER 30 .4.4 + 52.z
EXEM 0 p0 JO.%Q' + 49.3
C
g + 48,6
.3.5 / X X---.-Ft3.5 Rf
41.4 X X--*�-e-.
MAP 122 PCL 82
MAP 122 PCL 83.2
SITE DLAN
�E
20 0 :0 40 60 Feet
48
+ 55.0
12" X 3" 1" TOPCOAT MASS DPW
CC13ERM / TYPE 11
12" PROCESSED GRAVEL
6" LOAM &SEED MDW 1.03.1 NIB. ROLLER COMPACTED
ALL DISTURBEDAREAS \;REMOVE:TOMP & SUBSOIL COMPACT SUBBASE
MR)
NOTE: ALL FILL TO BE CLEAN SAND &GRAVEL
COMPACT IN 6" LIFTS TO 95% MODIFIED PROCTOR DENSITY
WITH VIBRATORY ROLLER.
PAVEMENT CROSS SECTION
R NOT TO SCALE
+ 53.4
+ 54.9
CON(
LILY
POND
t7
nY
ti
+55.1
GEN EBAL NOTES:
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PIAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE
(1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR
EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND/OR THE MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STANDARD
SPECIFICATIONS FOR BRIDGES AND HIGHWAYS AS AMENDED TO PRESENT.
ANY SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5.
AND YARMOUTH HEALTH REGULATIONS.
3. VERTICAL DATUM IS NGV029 ASSUMED FROM QUAD
4. TOPOGRAPHY AND DETAIL FROM SURVEYS BY DOWN CAPE ENGINEERING 4/01.
5. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHTO-H20 UNLESS NOTED.
6. THIS PLAN IS FOR PROPOSED WORK ONLY AND IS NOT TO
BE USED FOR PROPERTY LINE STAKING.
7. ALL STORM RUNOFF TO BE CONTAINED ON SITE.
8. 6" LOAM AND SEED ALL DISTURBED AREAS NOT PAVED.
9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT
INSPECTION BY OWNERS ENGINEEF AND PERMISSION OBTAINED.
i 10. COORDINATE UTILITY INSTALLATIONS WITH APPROPRIATE VENDORS.
jt
52.9
+ 532
MAP 122 PCL 82
+ 51.4
G9lT// E�
h
+ so.e OF LAND IN
VARNOUTHPORT, ,.
M
DRAFTER: DAO/ASL DATE: 11-19-01
CHKD BY: AHO
DATE
SCALE 1" = 20'
01-070HIGHLAND.DWG
01-070
SHEET 1 OF 1
y
-
\
BARN
43
..3
51.1
a1.0
g�
+ 44.1 ...,
EXISTING
6.3
V
2 STORY WOODFRAME DWELLING
GAR.
THE EDWARD GOREY HOUSE"
MAP 1 CL 81
T.O.F. - 43.0 430
;
52
51.1 T AREA
I L
/
29,006 +Fjj
--__J
l
0. t ACRES
/ +
+4 7
+ 53.1
+ 53.5
PROPOSED HCP RAM
W/RAILS CODE/
>:
SEPTIC LEACHIN FIELDFISH
CONEXISTING
G
POND
1:12 HCP RAMP H-10'-
�. J
10 GAL
o
rr w H 10 P/C - J + 53.6
41
PROPOSED IK RACK
8.0' PRO SED PAVED
PARK[ AREA
F&C NOTE:
F7L. 40.30 V11 PER 30 .4.4 + 52.z
EXEM 0 p0 JO.%Q' + 49.3
C
g + 48,6
.3.5 / X X---.-Ft3.5 Rf
41.4 X X--*�-e-.
MAP 122 PCL 82
MAP 122 PCL 83.2
SITE DLAN
�E
20 0 :0 40 60 Feet
48
+ 55.0
12" X 3" 1" TOPCOAT MASS DPW
CC13ERM / TYPE 11
12" PROCESSED GRAVEL
6" LOAM &SEED MDW 1.03.1 NIB. ROLLER COMPACTED
ALL DISTURBEDAREAS \;REMOVE:TOMP & SUBSOIL COMPACT SUBBASE
MR)
NOTE: ALL FILL TO BE CLEAN SAND &GRAVEL
COMPACT IN 6" LIFTS TO 95% MODIFIED PROCTOR DENSITY
WITH VIBRATORY ROLLER.
PAVEMENT CROSS SECTION
R NOT TO SCALE
+ 53.4
+ 54.9
CON(
LILY
POND
t7
nY
ti
+55.1
GEN EBAL NOTES:
1. THE LOCATION OF EXISTING UNDERGROUND UTILITIES SHOWN ON THIS PIAN IS
APPROXIMATE. PRIOR TO ANY EXCAVATION ON THIS SITE, THE EXCAVATING
CONTRACTOR SHALL MAKE THE REQUIRED 72 HOUR NOTIFICATION TO DIG SAFE
(1-888-344-7233) AND ANY OTHER UTILITIES WHICH MAY HAVE CABLE, PIPE OR
EQUIPMENT IN THE CONSTRUCTION AREA FOR VERIFICATION OF LOCATIONS.
2. ALL CONSTRUCTION MATERIALS, COMPONENTS, AND METHODS EMPLOYED ON THIS
PROJECT WORK SHALL CONFORM TO THE TOWN OF YARMOUTH SUBDIVISION REGULATIONS
AND/OR THE MASSACHUSETTS DEPARTMENT OF PUBLIC WORKS STANDARD
SPECIFICATIONS FOR BRIDGES AND HIGHWAYS AS AMENDED TO PRESENT.
ANY SEPTIC WORK AND MATERIALS TO CONFORM TO 310 CMR 15.00 TITLE 5.
AND YARMOUTH HEALTH REGULATIONS.
3. VERTICAL DATUM IS NGV029 ASSUMED FROM QUAD
4. TOPOGRAPHY AND DETAIL FROM SURVEYS BY DOWN CAPE ENGINEERING 4/01.
5. DESIGN LOADING FOR ALL PRECAST UNITS TO BE AASHTO-H20 UNLESS NOTED.
6. THIS PLAN IS FOR PROPOSED WORK ONLY AND IS NOT TO
BE USED FOR PROPERTY LINE STAKING.
7. ALL STORM RUNOFF TO BE CONTAINED ON SITE.
8. 6" LOAM AND SEED ALL DISTURBED AREAS NOT PAVED.
9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED WITHOUT
INSPECTION BY OWNERS ENGINEEF AND PERMISSION OBTAINED.
i 10. COORDINATE UTILITY INSTALLATIONS WITH APPROPRIATE VENDORS.
jt
52.9
+ 532
MAP 122 PCL 82
+ 51.4
G9lT// E�
h
+ so.e OF LAND IN
VARNOUTHPORT, ,.
M
DRAFTER: DAO/ASL DATE: 11-19-01
CHKD BY: AHO
DATE
SCALE 1" = 20'
01-070HIGHLAND.DWG
01-070
SHEET 1 OF 1
y