Loading...
HomeMy WebLinkAbout160 Summer Street Topographic Site Plan\ 3 co \\ \ \\ co L0 LOT 8 \ \ ! \ 176,363± S.F. \ \\ \ \ \\ 4.0± Ac. \\ \\ \\ !\ \ MAP 104 \ \ \ \ \ PARCEL 9.2 \ \ \ \--------------- II 114-` \\\ ( l / \ \ .mac --------104 102 100- z BOULDER WALL 28 \\ \\ \\\ \ #\\\ \\ \\ ;\\ v�°ON /I I It I PROVIDE SUITABLE DRAINAGE INTECEPT ON LOCUS TOP CF FOMDATION EL - 117.0 FINISH GRADE - IO8f low 14 71 \ 7ao 02 \\ PROPbSCDGARAGE �\ \\\\ bot \ 0s, D \\ \ \ 1Z \ \ Q \ \ WORK 5 \ I / A o \ \ \ \ \ \ SHOP \#2 PROPOSED! \ \ \moo \ IDRIVEWAY/ 1 - EXISTINo G- \ \ ` � rl AOlt \/) ._ PARI -_ \ / I / - - - - - - - - - - 116 1 ` ! I ' W /` / PROPO o DRIVEWAY 'o ETIs iG'P S 090338" W ---------1 T ` k H6 T o 6.OF 3/Gro I-' 1-1/2' DIA STON=?. BELOW TANK SEPTIC TANK PRECAST REINFORCED CONCRETE CAPACITY: 1500 GALLONS ALL PIPE TO BE 4" DIA (H-10) PVC TIGHT JOINT WITH MINIMUM SLOPE OF 1/8" PER FT. MANHOLE AND COVER -MIN 24" DIA. RAISE COVERS TO WTHN G OF FINISH GRADE PLAN 383.15- I inch - 20 ft. f LAYER CF 1/8" - 3/8' DIA. WASHED STONE OR FABRIC COMPACIEO BASE- n BOX W/ 6' (AVER CF am, CRUSTED SHONE (H-10) EATING _ X MUST mottling NV.=103.00 117.0-116.7 BEFORE PITCHPIG DOWN TO O n 10YR2/1 H -2D z 0ao00®o0 00 0a000O013 Mo 00000O00 O0 MOMMOMOM MM 4-26 B loam. sand 3/4" - T 7/Y DIA L DOUBLE WASHED STORE( - COMPACIEO BASE- n BOX W/ 6' (AVER CF am, CRUSTED SHONE (H-10) EATING _ X MUST mottling REMAIN LEVEL FOR 2' -Or 117.0-116.7 BEFORE PITCHPIG DOWN TO O LEACHING FACILITY OR 10YR2/1 PROVIDE "SPEED LEVELS" SEPTIC SYSTEM PROFILE NO SCALE 42' 91 1s' DIA MANHOLE NTH CONCRETE COVER AND FRAME ERCUCHT TO WITHIN 6- OF FINISHED GRADE MADE = 1071 H-20 4 00000®000a 00000000000. 000000000x0 00000000000 TYPICAL LEACH SYSTEM CROSS SECTION NO SCALE SAS CONSIRUC110N: 4 PRECAST 500 GALLON DRYWEt1S (H-20 RATED) AS MANUFACTURED BY STOREY PRECAST. INC. OR APPROVED EQUAL, SET END-TO-END IN A 13 FL NIDE X 42 FT. LONG EXCAVATION TO THE DEPTH AND ELEVATIONS SHOWN. SURROUNDED BY DOUBLE -WASHED 3/4 TO 1-1/2 INCH GRADED GRANITE STONE TO THE ELEVATION SPECIFIED CLT THE GROSS SECTION. SAS FACILITY SHALL SE COVERED WTH SUITABLE GEOTWILE FILTER CLOTH AS A SUBSTITUTION FOR THE 2 INCH PEAS1OtE COVER LAYER. N 1479,15" £ 26`9 46,E / / / \ /' ol / \ / BENCHMARK: /SPIKE FOUND EL. = 98.71 DESIGNDATA HYD. LDAIIING: DVi . G - 4 BEDROO.NIS X 110 GPDBR=440.0 GPD SEPTIC TANK DESIGN 440 X 200% = 8850 GPD - PROYTDE A MLN SIZED 1,500 C AL SEPTIC TANK PRECAST CONCRETE -ST 1500 -H-10 (H-20 OPTIONAL) SAS DESIGN PERCOLATION RATE - 6 MPI, CLASS H LONG TERM HYDRAULIC LOAD RATE = 0.60 GALS.F. SIDE AREA = 2 (12.8'+42) (21=219.2 BOTTOM AREA = 12.8'X 42' = 537.6 S.F. LOADLNG: 2191 S.F.+537.6 S.F. X 0.60 GAIJS.FJDAY= 454.1 GPD TOTAL LEACHLNG CAPACITY = 451.1 GPD 'TB><F &TilS NOT KMELE FOR USE WITH A GARBAGE DISPOSAL UNTF DEEP OBSERVATION HOLE # 1 Test Date: JUNE. 19,1997; Witam: AMY VONHONE, RS, YARMOUTH HEALTH DEPT. PERFORMED BY Stetson Hall. RS elevation depth (in.) horizon texture color mottling other 117.0-116.7 0-3 O organic 10YR2/1 116.7-116.6 3 - 4 E loam. sand 10 YR 56/1 116.7 - 114.8 4-26 B loam. sand 10YR 6/4 -112.8 E 26 - 51Cl Cl cse/msand 10YR7/4 -107.0 51- 64 C2 Sne saed 10 YR 7!3 (dense) 107.0.106.5 64- 126 C3 loam sand 10 YR 7/3 Parent material: glacial moraine / ice contact Depth to Groundwater: Not found PERC. TEST DATA: test at 60 in. to 78 in. depth 12 is - 9 in. - 3 min. 1 see.; 9" to 6" in 3 min. 36 sec. PERC RATE = 5MPI in Cl & C2 layer DEEP OBSERVATION HOLE #2 Test Date: JUNE.19,1997; Witness: AMY VONHONE, RS, YA PERFORMED BY Stetson Hall. RS DEPT. elevation depth(in.) horizon texture I color mottling other 114.0-113.7 0-3 O organic 10 YR 2/1 113.7.113.6 3 -4 E loam sand 10 YR 6/I 113.6-111.0 4-36 B loam. sand 10YR 6/4 111.0-106.5 36-90 Cl loam. sand 10YR 7B 106.5-105.0 90-108 C2 silt loam 10 YR 7/3 (dense) Parent material: glacial moraine / ice contact Depth to Groundwater. Not found PERC. TEST DATA: See tests 1 & 4 DEEP OBSERVATION HOLE #4 Tat Date: SEPT. 24,2014; Witness: AMY VONHONE, RS, YARMOUTH HEALTH DEPT. PEWURMIM BY Robert M Perry eleaation depth (in.) horizon texture color mottling other 110.11-109.8 0-9 A/E loam. sand 10 YR 6/2 109.4 - 107.0 9-36 B sand loam to YR 5/8 107.)-102.0 36-96 Cl sand loam I OYR 6/6 1023-100.0 96-120 C2 loam, sand I lOYR 5/6 Pareat material: glacial moraine / ice contact Depth to Groundwater: Not found PERC. TEST DATA: TESTED @ 66 IN. DEPTH 12" -9" IN 8 MIN. 44 SEC.; 9" -6" IN ISMIN. 42 SEC. PERC RATE = 6MPI CLASS H in Cl layer DEEP OBSERVATION HOLE # 5 Tat Date: SEPT. 24,2014; Witness: AMY VONHONE, RS, YARMOUTH HEALTH DEPT. • PERTORMED BY Robert M. Perry elemtion depth'(in.) hbrizon texture color mottling other 107.0 - 106.3 0-8 A/E loam. and 10 YR 52 106.1-103.9 8-37 B sand. loam 10 YR 5/S 1039.97.0 37-120 Cl sand. loam IOYR 5/4 r'arert material: glacial moraine / ice contact Depti to Gm,mdwater. Not found PERC. TEST DATA: SEE TEST HOLE 4 PERC RATE = 6MPI CLASS H in Cl layer 7 !LOCUS KEY MAP NO SCALE La'.OY YARMOUTH, MA GENERALVOTES 1. PLOREFERENCE: TOPOGRAPHIC SURVEY PREPARED BY TERRY WARNER, PLS DURING SEPTEMBER 2014 L ELEVATION BENCHMARK IS A SPIKE FOUND WHERE SHOWN. TRANSFER ELEVATION FROM THIS POINT TO TU CONSTRUCTION AREA PRIOR TO COMENCING WORK 3. ALL SEPTIC SYSTEM CONSTRUCTION MATERIALS AND PROCEDURES SHALL CONFORM TO THE STATE SANPARY CODE, TITLE 5 AND TOWN OF YARMOUTH HEALTH DEPT. APPROVAL FOR THE DESIGN. 4. SEPTIC SYSTEM INSTALLATION CONTRACTOR SHALL VERIFY THE NEW EXISTING BUILDING SEWER PIPES PRIOR TO MAKING ANY CONNECTIONS OR SETTING COMPONENTS 5. WATER SERVICE PIPE SHALL BE LOCATED A MIN. OF 10 FT. TO ANY SEWAGE SYSTEM COMPONENTS 6. SOH`FESTS INDICATE THAT OVER -EXCAVATION IS RECOMMENDED TO ENHANCE SAS FUNCTIONALITY, A 5 FT-1111METER EXCAVATION CAN BE MADE SURROUNDING THE SAS. RE -FILL THE EXCAVATION WITH CLEAN SAND MEETING TALE 5 FILL REQUIREMENTS. CONSTRUCT THE SAS IN THE NEW MATERIAL SAS IS DEUGN'ED FOR THE SOIL AS ENCOUNTERED. 7. A 40 EIL THICKNESS VINYL LINER SHALL BE PLACED WHERE SHOWN TO MEET WITH THE SLOPE REQUREMENT. SEE PLAN. RESERVE AREA RECEIVES THE LEVER ALONG IT'S ENTIRE DOWNSLOPE SIDE TO TIE ELEVATIONS SPECRUD, 8. CONTACT CAPE COD ENGINEERING, INC. PRIOR TO EXCAVATION TO REVIEW OVER -EXCAVATION OPTIONS AND TO SCHEDULE SOIL VERIFICATION INSPECTION IF REQUIRED. 9. REPLFCE THE STOCKPILED SUBSOIL ("B" HORIZON) PRIOR TO ROUGH GRADING AND TOPSOIL / 9 APPLCATION AND LAWN SEEDING. LANDSCAPE IMPROVEMENTS SHALL BE AS DIRECTED BY THE OWNER I0.FULIY COMPACT ALL PIPE BED TRENCHES BENEATH ANY DRIVEWAY PAVEMENT AREAS. PROVIDE SUrriBLE COMPACTED BASE COURSE PRIOR TO PAVING. 17 �eeC T1! r�Yl(z� 11. INSTILLER SHALL CONTACT ENGINEER AT TIME OF SYSTEM COMPLETION PRIOR TO EARTH COVERING FOR IYSTEMCERTIFICATIONIFREQUIRED BYTHE TOWN. =MOutli Health Department IZ. CONTACT ENGINEER IF ANY QUESTIONS OR DOUBTS ARISE REGARDING SOIL CONDTTIONS ENCOUNTERED��EDP DURING CONSTRUCTION. 13.7OW(W �R LIS EXIST WITHIN 200 FT. OF THE PROPOSED SEPTIC SYSTEM. THE SrM IS SERVED B1� - - - daY a Date � G L'"Iu`ex7 lure/ 12/9/20141 ADD LINER REVISIONS TOPOGRAPHIC SITE PLAN SHOWING PROPOSED CONSTRUCTION OF A SINGLE FAMILY DWELLING AT 160 SUMMER STREET, YARMOUTHPORT, MA ASSESSORS MAP 104, PARCEL 9.2 PREPARED FOR PETER AND CYNTHIA EASTMAN OCTOBER 20, 2014 SCALE - AS NO SS, k 1 PREPARED BY e� TERRY CAPE COD ENGINEERING, INC. ANN ROBERT M. PERRY, P.E. WARNER Y e• No. 38721 s CS/1 P.O. BOX 1517 aa'5Q300 N�;� EASTDENNIS,MA02641sTIR g y QtPTF9 TEL: 508-385-1445 "t EASTMAN.DWG