Loading...
HomeMy WebLinkAbout44 Tall Pines Drive - Septic DesignBENCHMARK TOP OF FOUNDATION 20 FT. MINIMUM F f a?1' 10 FT. MINIMUM 10 FT. MINIMUM FROM SLA ELEV. _ , (ASSUMED), CONCRETE COVERS —� 4" CAST IRON PIPE (OR EQUAL) MINIMUM PITCH 1/4" PER FT. IN --ECFV. ELEV. a 1ELLAR CRAWL SPACE 4• SCHEDULE 40 PVC PIPE MIN. PITCH 1/8- PER FT. FLOW UNE -T1MIN. pLE�63s e X10` V�i �V of " E ;9ASi-56SUMELEV. ELEV. _ DISTRIBUTION ELEV. = µ Ri1X �jF 10 HIGH CAPACITYSTONE IN AN TDRS WITI; — ,0i LEGEND: EXISTING SPOT ELEVATION :00x0 EXISTING CONTOUR----00---- FINAL SPOT EIEVA-nON FOZ701 FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE —o- TOWN WATER iW W CATCH BASIN GAS LINE CLEAN OUT C CESSPOOL C.P.0 SOIL TESTS DATE OF SOIL TEST d VG L L SOIL TEST DONE BXX SWEETSER ENGINEERING ED WITNESSBYz /L o' {?oN 0 0,. OBSERVATION HOLE 1 ELEv91--- oromi AnnN RATF -' MIN./INCH AT 7S INCHES DEPTH CLEAN SAND TEXTURE COLOR MOTT. LOAM AND SEED 2- LAYER OF M,..' 1/8• T01/2" � WASHED S PONE NOTREQUIRED " 1 CU. FT. OF CONCRETE a� <- ANCHOR FLOW UNE -T1MIN. pLE�63s e X10` V�i �V of " E ;9ASi-56SUMELEV. ELEV. _ DISTRIBUTION ELEV. = µ Ri1X �jF 10 HIGH CAPACITYSTONE IN AN TDRS WITI; — ,0i LEGEND: EXISTING SPOT ELEVATION :00x0 EXISTING CONTOUR----00---- FINAL SPOT EIEVA-nON FOZ701 FINAL CONTOUR SOIL TEST LOCATION UTILITY POLE —o- TOWN WATER iW W CATCH BASIN GAS LINE CLEAN OUT C CESSPOOL C.P.0 SOIL TESTS DATE OF SOIL TEST d VG L L SOIL TEST DONE BXX SWEETSER ENGINEERING ED WITNESSBYz /L o' {?oN 0 0,. OBSERVATION HOLE 1 ELEv91--- oromi AnnN RATF -' MIN./INCH AT 7S INCHES DEPTH HORIZ TEXTURE COLOR MOTT. OTHER