Loading...
HomeMy WebLinkAbout32 Thomas Path - Site & Sewage Plan/G�uT �t wAr� <. GOGvS v 9y �N LOCATION MAP PROff ILE EL = Zo, d TOP FOUNDATION EL.= 93 roA f o, a ,s 111 ' IN OU NOT TO SCALE COVERS TO WITHIN 6" 0,7 FINISHED GRADE. 4„ PVC Is' SGH AO i� FLEDIST. i3CF. 15o 0 GALLON SEPTIC TANK 6" STONE :SASE o _ J n \ o00 J I h � a 1' 1 rh ouT BA cr.cL FIRST PIPE LENGTH TO 6E SET LEVEL FOR MIN. 2' /2•- o o d SEPARATION „ 2" LAYER OF 3/8" PEASTONE OVER 3/A"- I I/2" DOU6LE WASHED STONE FINISH GRADE FI = 70. o TCP @ EL. 17.7 BOTTOM ® El .1So 0 !lp -ZN OF 141,9 L( DANIEL E. BRAMAN CIVIL m,l ,No.32666C a 71ONAI EN •g jt`y^.iy �� TEST HOLE LOO DATE: -/- 6, - nS TEST i3Y: X�l WITNESS: 0, PERC RATE: G. S, 2. S'y NO /,iJii7E2 C=J�/GOCi-lJ'TC/��C G� DES I CSN DATA DAILYFLOW: (`/)BEDROOMS xIIOGPD=�/ya GPD SEPTIC TANK: y/O GPD xWO%-- 8o GPD USE: /S-o&6ALLON PRECAST SEPTIC TAN K LEACHING FACILITY: USE: - 3 �'8,5'c Z �-• Sov�y T,�y�u�c-s CAPACITY: 3 • s ' o ti .� as , SIDEWAIL: yi ✓z'x o, 7 5/> /3y TOTAL: GENERAL NOTES I CONTRACTOR TO BE RESPONSIBLE FOR THE LOCATION OF ALL UTILITIES, ABOVE AND UNDERGROUND, PR I OR TO ANY EXCAVATION OR CONSTRUCTION. 2. SEPTIC SYSTEM TO BE INSTALLED IN COMPLIANCE WITH 310CMR J500: TfFLE V 3. THIS PLAN IS NOT TO DE USED FOR PROPERTY LINE DETERMINAT I ON h. ALL DISTURBED AREAS TO BE LOAMED AND SEEDED 5. CONTRACTOR TO PROVIDE A5 HOUR NOTICE FOR ANY REQUIRED INSPECTIONS. 6. EXSTING CESSPOOLS TO BE PUMPED DRY AND FILLED WITH SAND. 7. SEPTIC SYSTEM 15 NOT DESIGNED FOR GARBAGE DISPOSAL. �5 1 TE ^' �5E Y Y AaE FLAN V LOCATION; 3Z i PREPARED FOR-_M�92/C </LJ/G//EGGE SLA2 SCALE: DRAWN BY: JOB NI-KER: PATE-.- --Z . SHEET: by13� REVISED: SP-, WELLER & A5�5061 ATD3 - 16A5 FALMOUTH RP ^ 5UITE AC CENTERVILLE, MA OU TEL.: (508) 715-0735 FAX: (508) T15 -b754 ti PRO1`175510NAL ENGINEERS & LAND SURVEYORS' /''