Loading...
HomeMy WebLinkAbout124.8.1 - Site and Sewage Plan (2)N ROUTE BA &,-LOCUS .r -1. �`yJT Rpt, ASSESSORS MAP: 124, PARCEL: 8 h_ 9_ CURRENT ZONING: Rp40 BUILDING SETBACKS: F: 30' S: 200 R: gO* FLOOD ZONE: C KEY, EXISTING CONTOUR: - - PROPOSED CONTOUR: ............. EXISTING SPOT ELEVATION: 25S PROPOSED SPOT ELEVATION: 25 TEST HOLE. .0- UTILITY POLE: -o- FENCE LINE: - HYDRANT. -6- RETAINING WALL: PROPOSED TREE SCREENING :0 LOCATION MAP SCALE : 1" = 2083' LOT 1 WETLAND : 1,051 t S.F. UPLAND : 9,067 ± S.F. TOTAL : 10,118 ± S.F. (0.23 ± AC.) LOT 2 WETLAND : 420 + S.F. GRAVEL DRIVE UPLAND : 9,248 + S.F. TOTAL :9,668 ± 9-F. (0-22 ± AC.) PROPOSED STOCKADE FENCE LOT 3 9,387 ± S.F. (0.22 ± AC.) 100' FROM WETLAND LOT 4 WETLAND: 5,268 ± S.F. 50' FROM WETLAND UPLAND : 14,739 + S.F. TOTAL : 20,007 ± S.F. (0.46 ± AC.) GROSS AREA : 49,180 ± S.F. (1.13 + AC.) PROPOSED STONE FALL - WORK LIMIT LINE - EDGE OF WETLAND --, 27. 292, - FLAG 12 a 4 - FLAG f f 0 FLAG 4 -r 28- FLAG 8- FLAG 6 LOT 1 26\ ' 26 10' ( 142 I 4\ pflFO pg$pRO� ID'LI ,1RL28D t«r i r\ty ak FLAG 10 35' TO WORK" LIMIT LINE pR TEST ..MOLE LOGS ENGINEER: THOMAS McLELLAN, P.E. FITNESS: AMY VON HONE, R.S. DATE: 3-20-03 & 12-18-03 PERCOLATION RATE: < 2 MIN/IN TH-1 TH-2 TH-3 TH-4 23D 20.0 36 - 24.0 24.0 24.0 'ORIZON ELEV. 0/A HORIZON 2.5Y 7/4 ELEV. HORIZON 66` ELEV. 0/A HORIZON ELEV SAND 78 LOAMY SAND 16.6 CS HORIZON OAMY SANDLOAMY [O�IA - TH-5 22.5 SAND 22.5 /3 21B rY fOYR 3/3 ELEV. 9` YR 4/3 1 21.86 232 ..• lOYR 4/3 ....", 24 2 B HORIZON LOAMY SAND lOYR 5/8 2D Cf HORIZON SILT LOAM 2.5Y 5/4 18.5 C2 HORIZON MED -FINE SAND 1 3D�gLLI = OT 2 FLOC 8- w h top 5 E j 2 g, R1 FLAGT �•\ l- -28- - ,'fI ;89166: � ! I FLAG 9 _ r ht ss - LOT 4 FYI 0 30 � � ! 4 'i / LOT N C1 HORIZON FIN1" SAND WITH SILT LOAM 2.6Y 8/3 40" f9. CZ HORIZON FINIS SAND 2.6Y 8/3 42" lOYR 6/8 1201 Cl HORIZON SILT LOAM 66` 2.5Y 6/4 1 f9S 13x C2 HORIZON FINE SAND 2.5Y 8/3 USCS GROUND WATER ADJUSTMENT WELL AfW-247, ZONE B, ADJUSTMENT 4.1 ADJUSTED GROUND WATER ELEV.= 14.1 22 15 ! EXISTING SCRUBS C i i TO BE EXISTING 26- - - - 20 EO BE REMOVEDXISTING LINC I EXISTING GARAGE a0/ / / f/ ! 22 20 24 BENCHMARK AT CONCRETE BOUND �y° ELEVATION = 23.11 22 40 MIL POLY LINER, (2' DEEP) TOP OF LINER ELEV.= TOP OF LEACHING (TYPICAL OF ALL SYSTEMS) -70C TO BE REMOVED ti _,':� Ff� av PROPOSED STOCKADE FENCE'I r Jt LOAMY SAND NOTES. 36` IOYR 5/8 20.0 36 - Cl HORIZON 28.0 MED --FINE SAND 26.5 72` 2.5Y 7/4 f7D 25.0 66` C2 HORIZON C SILT LOAM 24.0 78 2.5Y 5/4 16.6 CS HORIZON 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. - TH-5 22.5 MED FINE SAND 22.5 156" GROUND WATER f0A 144• 24 2 B HORIZON LOAMY SAND lOYR 5/8 2D Cf HORIZON SILT LOAM 2.5Y 5/4 18.5 C2 HORIZON MED -FINE SAND 1 3D�gLLI = OT 2 FLOC 8- w h top 5 E j 2 g, R1 FLAGT �•\ l- -28- - ,'fI ;89166: � ! I FLAG 9 _ r ht ss - LOT 4 FYI 0 30 � � ! 4 'i / LOT N C1 HORIZON FIN1" SAND WITH SILT LOAM 2.6Y 8/3 40" f9. CZ HORIZON FINIS SAND 2.6Y 8/3 42" lOYR 6/8 1201 Cl HORIZON SILT LOAM 66` 2.5Y 6/4 1 f9S 13x C2 HORIZON FINE SAND 2.5Y 8/3 USCS GROUND WATER ADJUSTMENT WELL AfW-247, ZONE B, ADJUSTMENT 4.1 ADJUSTED GROUND WATER ELEV.= 14.1 22 15 ! EXISTING SCRUBS C i i TO BE EXISTING 26- - - - 20 EO BE REMOVEDXISTING LINC I EXISTING GARAGE a0/ / / f/ ! 22 20 24 BENCHMARK AT CONCRETE BOUND �y° ELEVATION = 23.11 22 40 MIL POLY LINER, (2' DEEP) TOP OF LINER ELEV.= TOP OF LEACHING (TYPICAL OF ALL SYSTEMS) -70C TO BE REMOVED ti _,':� Ff� av PROPOSED STOCKADE FENCE'I r Jt �S EPT I C SYSTEM DESIGN (TYPICAL OF 4) FLOW ESTIMATE: (3 BEDROOM DESIGN MINIMUM) --3 BEDROOMS AT-ItQ-_GAL1DAI'/BEDROOM = 330 GAL/DAY SEPTIC TANK: 330 GAL/DAY x 2 DAYS = 660 GAL USE 1540 GALLON SEPTIC TANK LEACHING AREA: USE 2 500 GALLON CHAMBERS WITH X OF STONE T)rmu-F'TAT SIDE AREA- (28 + 10812 2 = 155 (74) - GAL/DAY PROPOSED SEPTIC SYSTEM ELEVATIONS x I 115 NOTES. LOT 2 LOT 3 f. VERTICAL DATUM: ASSUMED FROM QUAD (NCVD +/-) A 28.0 _ 2. MVNICAPAL WATER IS AVAILABLE. 26.5 26.0 3. SCHEDULE 40 - 4" PVC PIPE TO BE USED THROUGHOUT SEPTIC SYSTEM. 25.0 25.0 4, ALL PRECAST UNITS TO CONFORM WITH AASHTO H-10 & H-20 23.0 C LOADING ,SPECIFICATIONS. 24.0 23.25 5 PIPE PITCH = 1/4` PER FOOT, (UNLESS NOTED OTHERWISE). D 23.75 6. FIRST 2' OF PIPE OUT OF D -BOX TO BE SET LEVEL. - TH-5 22.5 7. THE SEPTIC SYSTEM HAS NOT BEEN DESIGNED TO ACCOMODATE THE 22.5 24.0 USE OF A GARBAGE DISPOSAL. 0/A HORIZON ELEV. E ALL CONSTRUCTION DETAILS ARE TO BE IN CONFORMANCE WITH THE LOAMY SAND 1 21.86 STATE OF MASS. ENVIRONMENTAL CODE (TITLE FIVE) AND LOCAL lOYR 4/3 1 HEALTH REGULATIONS. B HORIZON 21.1 J 9. CONTRACTOR TO VERIFY LOCATIONS OF ALL UTILITIES PRIOR LOAMY SAND TO CONSTRUCTION. lOYR 6/8 21.5 10. GROUND COVER OVER ALL SEPTIC SYSTEM COMPONENTS NOT TO 22.0 22.0 EXCEED 3D'. Cf HORIZON SILT LOAM It. EXISTING SEPTIC SYSTEM IS TO BE PUMPED AND REMOVED. 2.5Y 6/4 205 12. ALL UNSUITABLE SOIL (A -B HORIZON AND SILT LOAM) WITHIN 5' OF PROPOSED LEACH AREA IS TO BE REMOVED AND REPLACED WITH C2 HORIZON CLEAN MEDIUM SAND. FINE SAND 18.5 IS. D -BOXES TO BE WATER TESTED TO ENSURE LEVELNESS AND EQUAL FLOW CS HORIZON SILT LOAM 17.5 C4 HORIZON FINE SAND 1115 �S EPT I C SYSTEM DESIGN (TYPICAL OF 4) FLOW ESTIMATE: (3 BEDROOM DESIGN MINIMUM) --3 BEDROOMS AT-ItQ-_GAL1DAI'/BEDROOM = 330 GAL/DAY SEPTIC TANK: 330 GAL/DAY x 2 DAYS = 660 GAL USE 1540 GALLON SEPTIC TANK LEACHING AREA: USE 2 500 GALLON CHAMBERS WITH X OF STONE T)rmu-F'TAT SIDE AREA- (28 + 10812 2 = 155 (74) - GAL/DAY PROPOSED SEPTIC SYSTEM ELEVATIONS x I 115 LOT 1 i LOT 2 LOT 3 LOT 4 A 28.0 28.0 26.5 26.0 B 25.0 25.0 23.5 23.0 C 24.0 24.0 23.25 22.75 D 23.75 23.75 23.0 22.5 E 22.5 22.03 22.03 21.63 F 22.38 21.86 1 21.86 21.46 G 21.5 21.5 21.5 21.1 J I 22.0 22.0 22.0 21.6 Iuf1u1 DEC 2 0 2004 Dll� BUILDING DEPT. DEMAREST-McLELLAN ENGINEERIXG By 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 0x'670 PHONE & FAX :(608) 398-7710 -- \ 77 T7 T7 1-7 ELEV. ,, J / //!!!J500 GAL ELEV. SEPTIC TANK (6" OF STONE UNDER OR MECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN 1' MIN. COVER D r -t ELEV. D -BOX F _E (6" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE G AT OUTLET TEE ELEV. 2" PEASTONE 314" - 1 112" WASHED STONE ELEV.= I /&, l � h.l A H 3 3 ELEV. 4E 28' -- D 2- 500 CALLON CHAMBERS WITH 3' OF STONE ALL AROUND AND 5' BETWEEN (28' x 10.8' x 2' DEEP) (H-20) ADJUSTED GROUND WATER ELEV.= 14.1 �- SITE AND SEWAGE PLAN APPROVED BY: DATE: L OCA TION. - 43 UNION STREET YARMOUTHPORT MA. PREPARED FOR - MARK & BARBARA GUST AFSON `lR SCALE: 1" = 30' DATE: 1013010 REVISED: 3119104 (NEW LOT CONFIGURATION) THOMAS McLELLAN, P.E. JOH Z. DEMAREST JR., P.L.S. REVISED.- 4121/04 REVISED: 7128104 REVISED: 12114/04 e� x I 115 BOTTOM AREA: 28' x 10.8' =302 SF (74) = 223 CAL/DAY AT ?OUNo CAPACITY = 338 GAL/DAY = 21.76 r.> 7 r� EPT I C SYSTEM EM (TYPICAL OF 4, SEE KEY FOR ELEVATIONS) COVERS WITHIN fZ" OF A FINISHED GRADE TOP OF FOUNDATION (ONE INSPECTION COVER TO BE WITHIN 6' OF GRADE) 3' MAX. COVER Iuf1u1 DEC 2 0 2004 Dll� BUILDING DEPT. DEMAREST-McLELLAN ENGINEERIXG By 24 SCHOOL STREET P.O. BOX 463 WEST DENNIS, MASSACHUSETTS 0x'670 PHONE & FAX :(608) 398-7710 -- \ 77 T7 T7 1-7 ELEV. ,, J / //!!!J500 GAL ELEV. SEPTIC TANK (6" OF STONE UNDER OR MECHANICALLY COMPACTED) TEE SIZES: INLET: 6" UP, 13" DOWN OUTLET: 6" UP, 14" DOWN 1' MIN. COVER D r -t ELEV. D -BOX F _E (6" OF ELEV. ELEV. STONE UNDER) GAS BAFFLE G AT OUTLET TEE ELEV. 2" PEASTONE 314" - 1 112" WASHED STONE ELEV.= I /&, l � h.l A H 3 3 ELEV. 4E 28' -- D 2- 500 CALLON CHAMBERS WITH 3' OF STONE ALL AROUND AND 5' BETWEEN (28' x 10.8' x 2' DEEP) (H-20) ADJUSTED GROUND WATER ELEV.= 14.1 �- SITE AND SEWAGE PLAN APPROVED BY: DATE: L OCA TION. - 43 UNION STREET YARMOUTHPORT MA. PREPARED FOR - MARK & BARBARA GUST AFSON `lR SCALE: 1" = 30' DATE: 1013010 REVISED: 3119104 (NEW LOT CONFIGURATION) THOMAS McLELLAN, P.E. JOH Z. DEMAREST JR., P.L.S. REVISED.- 4121/04 REVISED: 7128104 REVISED: 12114/04 e�