HomeMy WebLinkAbout19 Wadsworth Lane Plot PlanAdO3 3112
I
0
#9
Gil
off 608-362-4541
fax 508-562-9880
down cape engineering, inc.
CIVIL ENGINEERS
LAND SURVEYORS
939 main St. yarmouthport, ma 02675
07-037
Fboe
0,1 j
O
LOT 9
39,8401 SF
#5
12_
#4
1 #3
RESERVOIR POND
_62' ��
62 t —
AL LOCUS MAP
AL SCALE 1'=2000'±
ASSESSORS MAP -406 -PARCEL
LOCUS IS THIN FEMA FLOOD ZONE C
!� o
ZONING SUMMARY
\ . -�
� n ZONING DISTRICT: R-40
e
?-MIN.RONT SETBACK 30'
� c 1MW SIDE SETBACK 20'
a. MIN.,REAR SETBACK 20'
r
av
REFERENCES
DEED BOOK 21681 PAGE 228
PLAN BOOK 331 PAGE 40
NOTES
1. ALL ROOF RUN—OFF SHALL BE
DIRECTED TO DRYWELLS, OR TO DRIP
TRENCHES
2. WORK LIMIT LINE TO CONSIST OF
STAKED SILT FENCE
3. 3 BR SEPTIC SYSTEM SHOWN AS PER
AS—BUILT ON FILE WITH THE HEALTH
w DEPT.
1 4. SITE IS WITHIN AN APD
ILE COPS'
17
PROP. STEPS 2 \
0
F111 EXIST. PROP. DECK
DECK
#2
11
PROP. SHWR PR
GA
EXISTING DWELLING
#19
TF = 23.8 PROP.
s� \ f
/ BV OG
• 2�6 FRIO"�. /COV'D PORCH 22
c
EMM1_o ST GAL ST f
1 EXIST. D'BOX
PROPOSED PORCH TO
BE ON POSTS APPROX. AREA OF -
LEACHING FACILITY
JO 7 6"7
DATE ARNE H. OJALA, P.L.S.
#1
iY
DR91912DYED
DEC 2 S 2007
HEALTH DEPT.
CB FND
Scale:1"= 20' CB FND ds`North Lane
Wa
0 10 20 30 40 50 FEET PLOT PLAN
IN
YARMOUTH PORT ii I
PREPARED FOR
JOHN FORDE &
NOELLE MANNING
APRIL 10, 2007
REV. OCTOBER 22, 2007 DECK07-037MANNING (SBO
poo
VI6j1
Psi
�. Lo cyPof
J•� PSfP
of
P �o
00 0
o•
DO 8
Route 6
Pow
�d
s�
or.
07
P
0/d k"ha Rd
17
PROP. STEPS 2 \
0
F111 EXIST. PROP. DECK
DECK
#2
11
PROP. SHWR PR
GA
EXISTING DWELLING
#19
TF = 23.8 PROP.
s� \ f
/ BV OG
• 2�6 FRIO"�. /COV'D PORCH 22
c
EMM1_o ST GAL ST f
1 EXIST. D'BOX
PROPOSED PORCH TO
BE ON POSTS APPROX. AREA OF -
LEACHING FACILITY
JO 7 6"7
DATE ARNE H. OJALA, P.L.S.
#1
iY
DR91912DYED
DEC 2 S 2007
HEALTH DEPT.
CB FND
Scale:1"= 20' CB FND ds`North Lane
Wa
0 10 20 30 40 50 FEET PLOT PLAN
IN
YARMOUTH PORT ii I
PREPARED FOR
JOHN FORDE &
NOELLE MANNING
APRIL 10, 2007
REV. OCTOBER 22, 2007 DECK07-037MANNING (SBO