Loading...
HomeMy WebLinkAbout9 Wasque Road - Septic Design 2TOP OF FOUNDATION ELEV. 20 FT. MINIMUM FROM CELLAR 10 FT. MINIMUM 10 FT. MINIMUM FROM SLAB OR CRAWL SPACE CONCRETE COVERS/7 4" SCHEDULE 40 PVC PIPE // 7 MIN. PITCH 1/8" PER FT. 4" CAST IRON PIPE (OR EQUAL MINIMUM PITCH 1/4 PER FT. • ELEV. _ a ELEV. Q` / JTMIN. J I V. _ � yTl Z 0" e T GAS v ELEV 7 f 6" SU LEVEL= Gji 3 0 BAFFLE DISTRIBUTION REV. _ (TO BE PLACED ON FIRMBASE) BOX TO BE WATER TESTED 1500 GALLON IF MORE THAN ONE OUTLET SEPTIC TANK (TO BE PLACED ON FIRM BASE) 3/4" TO 1 1/2- j1 WASHED STONE SEWAGE DISPOSAL SYSTEM PROFILE NOT TO SCALE \ r n SOIL TEST DATE OF SOIL TEST SEPT. 19, 1996 CLEAN SAND SOIL TEST DONE BY SW R ENGINEERING WITNESSED BY P. BRYANTON LOAM AND SEED OBSERVATION HOLE 1 =v.= 1,9 OBSERVATION HOLE 2 ELEV.= Y 1 AYFR OF PERCOLATION RATE G 3— MIN./INCH AT w (1 INCHES PERCOLATION RATE e- 2— MIN./INCH AT 616 INCHES 1/8- TO i/2 D re WASHED STONE NOTREQUIRED z 1 CU. FT. OF CONCRETE S m ANCHOR 10* ELEV. _ 4 INFILTRATORS WITH STONE IN AN z DEPTH HORIZ TEXTURE COLOR MOTT. OTHER 0-3 01A L to Yc PROJECT LOCATION LO T 181 9 WASQUE ROAD, S.Y. ZONE S'ri.a T% SYSTEM (SAS) 8-zs T Logwly 10 Y`'r; ADJUST LEGEND: DESIGN CALCULATIONS ,:5A,)2, b EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS 3 OBSERVED WATER TABLE ( / / ) ELEV. = /yirDr✓,�1 ZSyA BOTTOM OF TEST HOLE ELEV. = �� "iZ C sq^11; 3 FINAL CONTOUR SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY 660 GAL DEPTH HORIZ TEXTURE COLOR MOTT. OTHER y to0-17,0/ Yv- PROJECT LOCATION LO T 181 9 WASQUE ROAD, S.Y. ZONE SREETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SYSTEM (SAS) 12 Z3 Loom Y loyrGS ADJUST LEGEND: DESIGN CALCULATIONS ,:5A,)2, b EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS 3 OBSERVED WATER TABLE ( / / ) ELEV. = /yirDr✓,�1 ZSyA BOTTOM OF TEST HOLE ELEV. = �� "iZ C [SHEET SHEET 1 OF 1� FINAL CONTOUR SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY 660 GAL UTILITY POLE ACTUAL SIZE OF SEPTIC TANK 1500 GAL 11 X 34 X 10 TRENCH FORMATION 2 " A // I A 6 WATER ENCOUNTERED AT Z ELEV. = tJ�i Z6,, /�J WATER ENCOUNTERED AT /ELEV. _ SOIL ABSORPTION WELL—A PROJECT LOCATION LO T 181 9 WASQUE ROAD, S.Y. ZONE SREETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SYSTEM (SAS) INDEX DATEr EG EN/ .?, 1498 ADJUST LEGEND: DESIGN CALCULATIONS USGS PROBABLE WATER TABLE ELEV. — JOB N0.i:576 0 p EXISTING SPOT ELEVATION 00„0 NUMBER OF BEDROOMS 3 OBSERVED WATER TABLE ( / / ) ELEV. = EXISTING CONTOUR ----00---- GARBAGE DISPOSAL UNIT NO BOTTOM OF TEST HOLE ELEV. = �� FINAL SPOT ELEVATION 00.0 TOTAL ESTIMATED FLOW (—ILO—GAL/BR./DAY X 3 BR.) 330 GAL/DAY [SHEET SHEET 1 OF 1� FINAL CONTOUR SOIL TEST LOCATION REQUIRED SEPTIC TANK CAPACITY 660 GAL UTILITY POLE ACTUAL SIZE OF SEPTIC TANK 1500 GAL TOWN WATER —WSW SOIL CLASSIFICATION I CATCH BASIN(�� DESIGN PERCOLATION RATE < 5 MIN./W. GAS LINE G — EFFLUENT LOADING RATE 0.74 GAL/DAY/S.F. LEACHING AREA 444,0 SQ. FT. (11X34)+(45X2X10/12) LEACHING CAPACITY (AREA X RATE) 332.26 GAL./DAY 449.0 X 0.74 RESERVE LEACHING CAPACITY 332.26 GAL./DAY NOTES: 1. ALL WORKMANSHIP AND MATERIALS SHALL CONFORM TO D.E.P. j TITLE 5 AND THE TOWN OF YARMOUTH RULES AND REGULATIONS FOR THE SUBSURFACE DISPOSAL OF SEWAGE. 2. ALL COVERS TO SANITARY UNITS SHALL BE BROUGHT TO WITHIN 6" OF FINISHED GRADE 3. ALL COMPONENTS OF THE SANITARY SYSTEM SHALL BE CAPABLE OF WITHSTANDING H-10 LOADING UNLESS THEY ARE UNDER OR WITHIN ? \ 10 FT. OF DRIVES OR PARKING AREAS. H-20 LOADING SHALL BE \ USED UNDER OR WITHIN 10 FT. OF DRIVES OR PARKING AREAS 4. ANY MASONARY UNITS USED TO BRING COVERS TO GRADE SHALL ,w '. \_ ! _ \ ' • BE MORTARED IN PLACE. 5. NO DETERMINATION HAS BEEN MADE AS TO COMPLIANCE WITH P, ECEr OR ZOxY ,— OBTAIN SUCH DETERMINATION FROM A^PROPRIATE AUTHORITY. 6. UTILITIES SHOWN PRE Ar FR A,,—A ^_"ILY EXCAVATION CONTRACTOR IS TO CALL "DIG—SAFE" AT 1-800-322-4844 AT LEAST 72 HOURS h \ A * \ PRIOR TO COMMENCING WORK ON SITE. X' 0 7. CONTRACTOR IS TO VERIFY GRADES AND ELEVATIONS AS WELL AS SITE CONDITIONS PRIOR TO COMMENCING WORK ON SITE. /} 1 ^ 8. PARCEL IS IN FLOOD ZONE C. 7 "chl 9. LOT IS SHOWN ON ASSESSORS MAP 77 AS PARCEL �J 81 10. SEPTIC TANK AND DISTRIBUTION BOX ARE TO BE SET ON A 6" BED 1ti o- OF 3/4" TO 1 1/2" STONE OR ON MECHANICALLY COMPACTED { \ NATURALLY OCCURRING SAND. too APPROVED: BOARD OF HEALTH No. 1714 b'ax ,tx / / /Q l /1 DATE AGENT t. erg 00 q I To ` 1 \ r j I ENGINEERINC EACON s� POLLOCK RIP ROAD Locus y�T sr a 9� 9 Z - GF REGIONAL o m "� PROPOSED SEPTIC DESIGN FOR �J GI /�1E5 SH /3E,t/ PROJECT LOCATION LO T 181 9 WASQUE ROAD, S.Y. SREETSER ENGINEERING 235 GREAT WESTERN ROAD P. 0. BOX 713 398-3922 SOUTH DENNIS, MASS. 02660 SCALE = 2O DATEr EG EN/ .?, 1498 REVISED /Ly u JOB N0.i:576 0 p LOCATION MAP REVISED [SHEET SHEET 1 OF 1� ENGINEERINC