HomeMy WebLinkAbout215 West Great Western Road Sewage Disposal System DesignSOIL TEST PIT DATA: 5/17/2001 GENERAL NOTES: SEPTIC TANK DETAIL: 1,500 GALLON CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. NOT TO SCALE1>°F OR TRAVELED WAY SHALL BE SCHEDULE O DATUM: TEST PIT TEST PIT ANY KNOWN WELLS PROPOSED WITHIN INLET \\ �10> CRAIG A. - f y I VERTICAL DATUM: ASSUMED GRD EL. 84.4 -#Z GRD. EL. 84.7 CONFORMING TO THE FOLLOWING 5. AND OUTLET TEES TO BE CAST IRON, NOTES: 1. SEPTIC TANK SHALL BE STEEL SCHED. 40 PVC OR CAST -IN-PLACE CONCRETE. REINFORCED CONCRETE. = :\DA D $ I IN a N Fl 3 <10 % OF No. 4 SIEVE SHALL 76.5 <5 % OF No. 4 SIEVE SHALL PASS No. 200 TEES TO BE CENTERED UNDER MANHOLE COVER. 2. SEPTIC TANK TO WITHSTAND H-10 LOADING :\ CIVIL IN THE DRAWINGS ARE APPROXIMATE. EST. HIGH GW. EST 0 E SAD HIGH GW 0 L 1 SA D COORDINATING THE PROPOSED CON- UNLESS UNDER PAVEMENT, DRIVES OR TRAVELED WAYS, WHEREIN H-20 LOADING 2-24' DIA CONCRETE MANHOLES =\ No.32112BENCH MARK SET: STAKE & NAIL SET FD i}t 9" kM7: . iOYR 6 1 6" HIGH GROUNDWATER COMPUTATION THE STATE OF MASSACHUSETTS SHALL APPLY. W/ METAL HANDLES BROUGHT 3. ALL PIPE CONNECTIONS AND CONCRETE TO 6" OF FINISH GRADE AT TEL. 1-888-344-7233. THE :\ x ;' ,.\ Ma ELEVATION 93.50 LbAMY S ND ., ;I (BASED ON TP#1 LQAMY.S D $ ELEVATIONS OF UNDERGROUND UTILITIES CONSTRUCTION SHALL BE WATERTIGHT. TEE TO BE UNDER 4. FILL ALL UNUSED KNOCKOUTS WITH 36• MAX. - 12" MIN. CONTRACTOR SHALL VERIFY SIZE, _ 03 O AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 1tIYR , DEPTH TO BOT. OF HOLE 11.0s 8. THIS SYSTEM IS NOT DESIGNED FOR M.H. OPENING MORTAR. \ \: ; i :\ 3 7 O 40 EL= 81.1 36 EL=81.7 r/ RECOMMENDED DUE. TO RECOGNIZED \ �� 4 ��`/ ADVERSE IMPACTS TO THE LEACHING INDEX WELL AIW-230 WATER LEVEL RANGE ZONE C 3' I _ \ THE CONTRACTOR PRIOR TO INSTALLATION. Cl MEDIUM SAND Cl CURRENT DEPTHOINDEX WELL(5/07) 23.6 MEDIUM SAND WATER LEVEL ADJUSTMENT 3.1 REQUIRED. RAISE M.H WVAZ4• 10'-6" 657 Main Street, (RT. 28) Unit 6 / = BENCHMARK 02673 2.5Y 7/3 2.5Y 7/2 DEPTH TO ADJUSTED HIGH WATER 7.9 SEWAGE DISPOSAL SEWER BRICK-; MORTAR j \:� :� \ [\= :\ STAKE WEST GREAT WESTERN ROAD 66" Jr� SEEP 15 2003 10•_0• .� WATER LEVEL 12• e: .::. &NORMAL = : \ =� NAIL SET VARIANCES REQUESTED: YARMOUTHPORT, MA 02675 59" COMP. DESIGN: K. HEALY 3. PRECAST SEPTIC TANK'ASSUMED DRAWN: K. HEALY '108" FILE NO. 8452-EXC.DWG DWG N0. 5388-02 INDICATESET JOB NO.4-8452.00 TEE < 4•_g" ' S 1_-:- 76.5 - 95" v_ OBSERVED GROUND WATER _ - _ _ 5-2• 4-6• •` 4'-0• MIN. �oeoaaN =`• 5-4" : sum C2 - i LIQUID DEPTH c°«+T�u s'-8' I \- MEDIUM SAND INDICATES � ESTIMATED .: { 1 \ ::. / ; ::\ F \ \ NONE NO WATER I NO WATER = SEASONAL HIGH 132" EL = 73.4 120" GROUND WATER EL = 74.7 c BOTTOM ON LEVEL STABLE BASE � DATE: DATE: INDICATES 3• PLAN VIEW 6" MIN. 3/4' To�� 5/17/2001 5/17/2001 PERC. CROSS-SECTION VIEW 1 1/2 STONE m .. \� \ •' - O \\ TEST BY: TEST BY: TEST _\ 9 SWEETSER ENG. SWEETSER ENG. N \ 4v �0 \ • ; :.� WITNESSED BY: WITNESSED BY:INDICATES a UNSUITABLE INVERT ELEVATIONS: �� \ AMY VAN HONE AMY VON HONE o •\ _ � -- \88.0MATE\\ DESIGN CRITERIA: PERC. RATE: 2 PERC. RATE:VE TOP OF FOUNDATION 94.0 A \ A \ I RES 3 �\ 8 MI \ , \ \ , DESIGN FLOW: -MIN./INCH 2 _-MIN./INCH SOIL EVALUATOR SOIL EVALUATOR 4" INVERT AT BUILDING 88.41 B•' 35 TP#1BOX , 4 BEDROOMS AT110G.P.B./D 440 G.P.D. SWEETSER ENG. SWEETSER ENG. NOTE: TEST PITS SHOWN ARE TAKEN FROM 4" INVERT AT SEPTIC TANK (IN) 88.05 C y 29.0' :: I 55 5' R; SOIL CLASS: SOIL CLASS: PLAN PREPARED BY SWEETSER ENGINEERING DATED MAY 17, 2001. TITLED PROPOSED 4" INVERT AT SEPTIC TANK (OUT) 87.80 D P OPOSED N/F REQUIRED SEPTIC 1 1 SEPTIC DESIGN, LOT 2, W. GREAT WESTERN RD. 4 INVERT AT DIST. BOX (IN) 87.73 E i �_ tet= ® 15gQO GALLON TOII��WMMN OV / OUTH TANK: 440 X 200% L.T.A.R. L.T.A.R. 4" INVERT AT DIST. BOX (OUT) 87.56 F .� 9 .0 EFTIC T� ASSIESSpf S = 880 GAL. 0.74 G.P.D./SQ.FT. 0.74 G.P.D./SQ.FT. INVERTS AT LEACHING FACILITY: 4 _ PROPOSED �IMITS OFA ,[� P M P 1bg O EXCAVATION` \ '9'#2 y� F�ARCHL I SEE OTES 3 & 6 381 ':\ 'j` � � SEPTIC TANK PROVIDED: = 1500 AL. PROFILE: NOT TO SCALE � SIZE OF LEACHING FACILITY REQUIRED: �RIVEWAY � I � EL.= A TOP FOUNDATION FIRST PIPE LENGTH 4.9• , .. - \\ � P OPOSw \ Pf�OPOSE� DESIGN PERC. RATE: <2 MIN. INCH EL CONCRETE COVERS TO WITHIN TO BE SET LEVEL FOR MIN. 2' 4 INVERT AT BEGINNING � �' �GA�AGE 4 B DR 00 WALK ' LONG TERM APPL. RATE 0,74 / G.P.D S.F. 6' OF FINISHED GRADE. FINISH GRADE OF LEACHING CHAMBER 87.5 G BREAKOUT 88.0OS. 2 DWLING OUT UI \ a: EL=90'_91 a• PVC scH ao \� ` \OF. 440 GPD + 0.74 GPD/SF = 595 S.F. `�cr Aff4"\PVC ELEVATION AT BOTTOM \ �- CH42 0 SP95-SIZE SCH 40 LEACHING CHAMBER 3 OF LEACHING CHAMBER 85.5 H OF LEACHING FACILITY PROVIDED: - y =B I -o I-crl :•, ESTIMATED HIGH GROUNDWATER 76.5 J I :- + IgE 11. X / \ 1 \ USE HIGH DENSITY POLYETHYLENE I=C SEE GENERAL NOTES 5 do 6 5 OUTLET I=F ) X96 - -- ( .::1 I OF. 94.0 I LEACHING CHAMBERS(4 UNITS) 12'X2'X35' DIST. eox 5 SEPARATION SEPTIC TANK •- / f ! SIDEWALL = 2(12'+35') X 2 = 188 EST. HIGH GROUNDWATER J � �I' I I I ` ` 01 I TOM _ 41f 608S.F, 608 S.F x 0,74 GPD/SF = 449GPD DISTRIBUTION BOX DETAIL: NOT TO SCALE NO. OF OUTLETS 5 NOTES: 1. DIST. BOX TO WITHSTAND H-10 LOADING I �9e� FINISHED GRADE UNLESS UNDER PAVEMENT, DRIVES OR ` 1 TRAVELED WAYS WHEREIN H-20 LOADING REMOVABLE COVER 2• WALLS _L TSHALL APPLY. / 2" I 30 1/2" rvc SAI 2. PROVIDE INLET TEE OR BAFFLE WHERE 1 \ - / I OCUS INFORMATION O T 15 1/2• SLOPE OF PIPE EXCEEDS 0.08 FT./FT OR IN PUMPED SYSTEM. O / / 1 15" I / i ;' I / /� \'. CURRENT OWNER: WILLIAMS BUILDING 6" •. 5,5 OUTLETS ; T PRECAST DIST. 8• BOX 3. FIRST TWO FEET OF PIPE OUT OF DIST. BOX TO BE LAID LEVEL. v m ' / / / / COMPANY :•v..•.v•. •; 1 4. ALL PIPE CONNECT ONS AND CONCRETE I / / / TITLE REFERENCE: DEED BOOK 15272, PAGE138 �f >D4°� R,, t` J � L f 3 CONSTRUCTION SHALL BE WATERTIGHT. i' 0 J % / -- PLAN REFERENCE: PLAN BOOK 564, PAGE 45 2• 7 1/2 5. FILL ALL UNUSED KNOCKOUTS WITH MORTAR. p '' I BOTTOM ON LEVEL ��� STABLE BASE 6' MIN. 3/4" TO PLAN NEW /� ` ASSESSORS MAP: 108 CROSS-SECTION STONE BASEHED /- PARCEL: 39-2 ZONING S DTBBACKS: FRONT \ N/FSIDE WILLIAMS / \ 30' 20' REAR 20' N NIS / / J BUILDING CO.MINIMUM PE KINS I ASSESSORS \ LOT SIZE: 40,000 S.F. LEACHING DETAIL: NOT TO SCALE AS ESSORS M�P 108 / - / / MAP 108 \ EXIST. TOTAL LOT AREA: 40,380f S.F. PARCEL/ / / I / / l \ P39 CEL \ \ I \ OVERLAY DISTRICT: AQUIFER PROTECTION DISTRICT ""�+�-1 1 \ LOT 2 \ TIVE NITROGEN SENSZO E: ZONE II 42,58 Ot S.F. ! I \\ \ ,380± S.F. \ \ I -\ \ FEMA FLOOD - / ZONE DISTRICT: C, DATED 7/2/92 s PANEL #250015 0002 D \ LOCUS PLAN: NO SCALE LOAM &SEED DISTURBED AREAS \ 157.5 26.25' - ' 3' MAX. COMPACTED FILL 36" MAXIMUM,-12"MINIM M y S 82'3�P" 00 0 0 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00 0000 00 0° 0 0 0° o° 0 00 00 0 00 00 0 oo°o o° o0 0 0 0 0 000 0 0 000 0° 3' LAYER ' 00 °° 00 4 UNITS °o �, T 1 Og DENSITY O p0 O PEASTONE /) ( I \_ `\ \ \ 2In 4" PVC oa HIGH DENSITY ° 50 12' 30" 24" 000 POLYETHYLENE O p �0 0 INFILTRATOR 3050 O O 0 N� `� / \ \ \ ` / / D d Z POLYETHYLENE INFILTRATOR 3050 o t PIPE ° o 0 0 0 0 0 0 0 0 0 0 Co ° 0000 00 00 �EFFEC. DE� �p0 CHAMBER TOWN ¢F \ \ YARMOUTH \ ` \ \ N -4 T�'1 °°00000°° ° ° ° ° ° ° O ° ° O O ° ° ° O ° ° ° 0 ° O p0 ASSE / / �- ` \ '� Z 35' " " „ WAS - 1 1/2' 47 50 47 WASHED STONE ORS \ \ \ MF 108/-C i \ `� \ 70 PLAN VIEW - LEACHING CHAMBERSRCE 12 \ \ \ \ \ 7O r / rVAC7 \ \ \ \ \ d fil CROSS-SECTION OF CHAMBER / / / \ \ \ \ / / J LOCUS ----PLAN VIEW �� \ ZQ SCALE: 1' _= �r FEET \ R❑UTE 6 �� 7 rr 0 10 20 40 FT. / 2 REVISIONS NO. DATE DESCRIPTION GENERAL NOTES: 1. THIS PLAN IS FOR DESIGN AND CONSTRUCTION OF THE SEWAGE DISPOSAL FACILITY ONLY. 2. ALL CONSTRUCTION METHODS AND MATERIALS SHALL CONFORM TO MASS. D.E.P TITLE 5 AND LOCAL BOARD OF HEALTH REGULATIONS. 3. ALL PIPES LOCATED UNDER PAVEMENT OR TRAVELED WAY SHALL BE SCHEDULE 40 OR EQUAL. 4. THERE ARE NO KNOWN PRIVATE WELLS LOCATED WITHIN 150 FT. OF THE PROPOSED LEACHING FACILITY NOR ANY KNOWN WELLS PROPOSED WITHIN 150' OF ANY KNOWN LEACHING FACILITY. 5. WITHIN LIMIT OF EXCAVATION REMOVE ALL TOPSOIL, SUBSOIL AND OTHER IMPERVIOUS MATERIAL 6. REPLACE WITH CLEAN WASHED SAND OR OTHER CLEAN GRANULAR SOILS CONFORMING TO THE FOLLOWING SIEVE ANALYSIS: 10% (MAX) BY WT. SHALL PASS No. 50 SIEVE <10 % OF No. 4 SIEVE SHALL PASS No. 100 <5 % OF No. 4 SIEVE SHALL PASS No. 200 UNIFORMITY COEFFICIENT O No. 4 SIEVE </=6.0 7. EXISTING UTILITIES WHERE SHOWN IN THE DRAWINGS ARE APPROXIMATE. THE CONTRACTOR SHALL BE RESPON- SIBLE FOR PROPERLY LOCATING AND COORDINATING THE PROPOSED CON- STRUCTION ACTIVITY WITH DIG -SAFE AND THE APPLICABLE UTILITY COMPANY AND MAINTAINING THE EXISTING UTILITY SYSTEM IN SERVICE. DIG -SAFE SHALL BE NOTIFIED PER THE STATE OF MASSACHUSETTS STATUTE CHAPTER 82, SECTION 409 AT TEL. 1-888-344-7233. THE ENGINEER DOES NOT GUARANTEE THEIR ACCURACY OR THAT ALL UTILITIES AND SUBSURFACE STRUCTURES ARE SHOWN. LOCATIONS AND ELEVATIONS OF UNDERGROUND UTILITIES TAKEN FROM RECORD PLANS. THE CONTRACTOR SHALL VERIFY SIZE, LOCATION AND INVERTS OF UTILITIES AND STRUCTURES AS REQUIRED PRIOR TO THE START OF CONSTRUCTION. 8. THIS SYSTEM IS NOT DESIGNED FOR THE USE OF A GARBAGE GRINDER. A GARBAGE GRINDER IS NOT RECOMMENDED DUE. TO RECOGNIZED ADVERSE IMPACTS TO THE LEACHING I FACILITY. I 9. ALL INVERTS ARE TO BE CHECKED BY THE CONTRACTOR PRIOR TO INSTALLATION. THE ENGINEER IS TO BE NOTIFIED OF ANY FIELD CHANGES THAT MAY BE REQUIRED. BSC GROUP 657 Main Street, (RT. 28) Unit 6 W. Yarmouth Massachusetts 02673 508 778 8919 PROJECT TITLE: SEWAGE DISPOSAL SYSTEM DESIGN LOT 2 #215 WEST GREAT WESTERN ROAD YARMOUTHPORT Jr� SEEP 15 2003 PREPARED FOR: Bv /fes TIM WILLIAMS WILLIAMS BUILDING COMPANY P.O. BOX 272 YARMOUTHPORT, MA 02675 DATE: JUNE 26, 2003 COMP. DESIGN: K. HEALY CHECK: D. CRISPIN DRAWN: K. HEALY FIELD: D. GAZZOLO / J. McCARTIN FILE NO. 8452-EXC.DWG DWG N0. 5388-02 SHEET 1 OF 1 JOB NO.4-8452.00