Loading...
HomeMy WebLinkAbout4 Whale Road - DetailsE t 2000 Ib/ft. vertical load capacity. F01 and 20" depth ire web stiffeners at bearings points. Load bearing wall above (stacked over wall below). 2x block �11_� Squash Blocks @ Mid -Span F09 , N.T.S. 11�� Multiple Member Beams Nonuniform Load Side Loaded Connection (lbs.pil fl ) 1 3/4" Versa -Lam 2/ aci 12'ocl 6'o to Nail Pattern 4509, 450 16d common nails. 2 rows I Od nails C! 12" a., staggered & clinched See chart Max Uniform Load 1000 1 2000 (lbs perin.ft.) 375 750 1500 4(e) mberof Members Me provers 11 _row s In in. 650 11 718-4.14" 1 2 x B turn bar + 518" wood panel 2 rows 10d nails ® 12 o.c., staggered & clinched 9 z s2D vBo — 900s, 90XL 11 718",14' Double 2 x B lumbar 2 rows 10d nai'.s C 12" a,c., C � 'Cn0 J t 3 ( a..- 1 390-__565 (a) Nail pattern for 3 -piece member must occur on both sides. Nail values may be increased by 15% for snow - load roofs and by 25% for non - snow roofs where building code allows. Ml,ltinle Member Connection F49 2000 Wit. vertical load capacity. BCI rim joist 7 Note: Minimum 2x6 bearing plate required with 500 and larger series joists. BCI Rim Joist F02 N.T.S. Joist hanger Backer block. Nail with 10- 1 Old nails. Install tight to bottom of top flange Filler block. Nail with 10-10d nails. Backer block required where hanger load exceeds 250 lbs. BCI Joist Header Opening F10 N.T.S. Multiple Member Beams Side Loaded Connection 112" dia. Bolt (b) L! LJ L1L1J .�J BaI1SDeein9 –. 12'dia. ( I BCI Joist Blockino 2 c Illlamof v aeu I I v Load bearing wall above (stacked over wall below). BCI Joist with Mid -Span Blocking l r�0 Joist hanger VVI -11 LVL beam F19 LVL Header O ening N.T.S. (e) T wide members allsf be bated from bath ehee. lDl vaWas p* i Sitcommon s tlEnilli"(grade Qy mherj Staggered — (c)Ahvabnhertroe above may beincuoedl5% faronow leaned roofs in 25% fortiori of, w here code allow e. Multiple Member Connection Bolt F50 N.T.S. 1/411 = 1 1 -011 a.4vJv 4250 lb/ft pounds per foot vertical load capacity. 1 1 m to BCI joist with fid nail to each flange F07 BCI Joist Versa -Rim N.T.S. One 8d each side at bearing Isi 13/4" minimum j bearing lenght Nails placed 1 1/2" minimum from end of BCI Joist to avoid splitting F52 Attachment End Bearing N.T.S. ll -- Solid block all posts from above to bearing below. F08 Post Load Transfer N.T.S. BCINersa-Rim Total Vertical Load Capacity.= 4250 IbIl. F07C BCI Joist with Parallel Versa -Rim N.T.S. • FILLER BLOCK Series Nonuniform Load Nailing Pattern (lbs.pil fl ) Nimener ofhlerrberm 2/ aci 12'ocl 6'o to H 7rB", 14' 2 x Slumber (3) 4509, 450 1314"woe-Lem 2 rows I Od nails C! 12" a., staggered & clinched 21 $00 1000 1 2000 III 3 375 750 1500 4(e) 330 - 870 7330 ' Joist hanger VVI -11 LVL beam F19 LVL Header O ening N.T.S. (e) T wide members allsf be bated from bath ehee. lDl vaWas p* i Sitcommon s tlEnilli"(grade Qy mherj Staggered — (c)Ahvabnhertroe above may beincuoedl5% faronow leaned roofs in 25% fortiori of, w here code allow e. Multiple Member Connection Bolt F50 N.T.S. 1/411 = 1 1 -011 a.4vJv 4250 lb/ft pounds per foot vertical load capacity. 1 1 m to BCI joist with fid nail to each flange F07 BCI Joist Versa -Rim N.T.S. One 8d each side at bearing Isi 13/4" minimum j bearing lenght Nails placed 1 1/2" minimum from end of BCI Joist to avoid splitting F52 Attachment End Bearing N.T.S. ll -- Solid block all posts from above to bearing below. F08 Post Load Transfer N.T.S. BCINersa-Rim Total Vertical Load Capacity.= 4250 IbIl. F07C BCI Joist with Parallel Versa -Rim N.T.S. • FILLER BLOCK Series Depth Filler Bloc ) Nailing Pattern g x um er 1 rows na.e o.a, staggered & clinched H 7rB", 14' 2 x Slumber (3) 4509, 450 9 12" 2 .6 lumber 2 rows I Od nails C! 12" a., staggered & clinched Ti 718", 14" 2 x B lumber 1s" x10 lumber 500S,500 9112" 2 x 6lumber 2 rows IDo nails ® 12" o.o., staggered &clinched 11 716", 14' 2 x a lumber 16" 2:x101umber 500s 11 718" 14" 2 x B turn bar 1/2' wood panel 2 rows Ind naile @ 12 o c., staggered & clinched - 16' 2 x 10 turn bar + 12" wootl barrel 650 11 718-4.14" 1 2 x B turn bar + 518" wood panel 2 rows 10d nails ® 12 o.c., staggered & clinched 16" 2 x 10 lumber+ 518" wood panel 0 NnS CL O r8 & 20' 2 x 12 lumber+ 5'e" wood panel 3 rows 1-- -,ells C 12 o. c., staggered & clinched 900s, 90XL 11 718",14' Double 2 x B lumbar 2 rows 10d nai'.s C 12" a,c., C � 'Cn0 J t 18" Doubly2x i u lumber staggered, nailed from both sides 9oXL 18" & 20" Double 2 x 12 lumber 3 rows rod nails ®12" ac., staggered, nailed from both sitles nor,.: 1) Filler block is required between BCPs for the full length of span. 2) Leave 116' gap between top of fllk, dock and bodorn of top flange. 3) 1 1re' plywood/OSB may be used as Mier block N double 4o0514DD joists am supported by hangs For top Waded conditions only. For abe loaded conditions, consul the Boise Cascade Installation Guidr Joist with Filler REVISIONS: BY: r (n 17— Z W Q J W Wpj F -JW Lu LL 0 g< W Z CO W � M wOZ C V) C "- O U � — U 'V O � C Z -S2 -a 4) M L N �QQ E N C'0 0 L 0 NnS CL O L O Y i rQQ (� CD s a� �= L) WM C V =N N W C tS t/1 O >_ (n +� si 'N 0 C � 'Cn0 J t Q E (q r`"- •— C O b(— O — O _ ?r fn N M 3 O .N c Q ~ O m Z U /(D rn 0 M o rnV 2 Mco Q- O N W (D (A L'Q W O f+ 0 N J N N J N o C N U �O M E Q BC FRAMER@ 2002 SCALE: N.T.S. DATE: 8/4/2003 BY: Rick Lowe FILE: American Rest DWG: 3 of 3 SHEET: 3 / 3