HomeMy WebLinkAbout327 Whites Path - Landscape Plan 212" BERMS _
WHITEIS PATI -i
PROPOSED DECIDUOUS TREE
13u CALIPER MINIMUM
Edge of Pavement PROPOSED 15 SHRUBS
@20 FOOT SPACING MINIMUM
- TINA GRAB APPLE " ".
LANDSCAPE BEDS WITH
PROPOSED SIGN LANDSCAPE BED N 84-45-1 0"E LAWN AROUND
PROPOSED LANDSCAPE BEDS (TYP)
BEDS TO INCLUDE PERENIAL �1–
FLOWERS, HYDRANGEA i/41 PROPOSED LAV�
I P
RICK PAVER APRON
G, x g^ IN STONE DUST
4
PROPOSED
INGROUND POOL NNM 5
PROPOSED LELAND CYPRESS O"
4 MINIMUM
NEAR PROPOSED BUILDING I G
4,141;
I ribi�pP�3'E'�p
w
O
5-
Z O
LOT I
o Q a 1Area= 47,87851'± I i a_ fel
_ O n N I
I Ma
` { LT.� ,�_/I w O
�6
I E i3 2� x c � � p �a •..i s ,. 0 i
k'-11441; Llgbbng
N} a
1 ) • �,-.
PROPOSEDON
5 FOOT POLE WITH
—��—�
?P,OJECTION INTO
SUBJECT PROPERTY
i
/ I i
=1 ��?
c i I
Liz, i al
QI
i
N1
i
v
'r
o w
.P - 1 ,I��
010`
ow
100'
200.90
5 t34'48'1 0' W
PLAN
SCALE I "=20'
TH15 AREA IS SERVED
BY TOWN WATER.
PROPERTY 15 LOCATED IN THE ZONE II
OF A PUBLIC WATER SUPPLY
0 20 40 GO
SCALE I "=20'
GNAuto d 20051and Project@ 200512005Drawing5YFanara4743\Land5cape.(no5vrv).dw6j
ZONING CLASSIFICATION
5-3(BU51NE55)
MINIMUM AREA
40,000 SF
MINIMUM FRONTAGE
100 FEET
FRONT YARD SETBACK
30 FEET
SIDE YARD SETBACK
10 FEET
REAR YARD SETBACK
30 FEET
MAXIMUM BUILDING COVERAGE 15%
MAXIMUM BUILDING HEIGHT
35 FEET
MAXIMUM SHAPE FACTOR
22
COVERAGE
MAXIMUM BUILDING COVERAGE
15%
LOT AREA 47,878 5F
EXISTING BUILDING COVERAGE
TOWER FOOTINGS (3)
8G7 51'
MECHANICAL BUILDING
1,020 5F
PROPOSED BUILDING
4,000 SF
PROPOSED DUMP5TER PAD
100 5F
TOTAL 5QUARE FEET
5,987 SF
BUILDING COVERAGE % 5,987
= 1 2.5%
47,878
MAXIMUM LOT COVERAGE'
70%
PROPOSED PARKING
1 7,3GG SF
PROPOSED BUILDING
4,000 5F
EXISTING MECHANICAL BLDG
1,020 5F
EXISTING CELL TOWER
8G7 SF
PROPOSED DUMPSTER PAD
100 5f
PROPOSED POQL t APRON
1, 194 SF
TOTAL SQUARE FEET
24,547 51'
LOT COVERAGE %n 24,547
= 52.3%
47,878
"NUMBER BASED ON OCCUPANT PROVIDING
ARTIFICIAL RECHARGE FOR EXCESS RUN-OFF
Note: Site Locations and Property Unea5
Based on Proposed Site Plan
Prepared by Weller * A5500ate5
Revised 12-G-93
And CPP Prepared by Weller 6 Associates
Updated 8-29-94