HomeMy WebLinkAbout327 Whites Path - Parking & Utilities PlanGENERAL NOTES: SOIL TEST LOGS:
A.) NEITHER DRIVEWAYS NOR PARKING AREAS ARE ALLOWED OVER SEPTIC SYSTEM TEST HOLE 1: EL= 42.5±
UNLESS H-20 COMPONENTS ARE USED,
B.) THE DE51GNEP WILL NOT BE RESPONSIBLE FOR THE SYSTEM AS DESIGNED UN-
LESS CONSTRUCTED AS SHOWN. ANY CHANGES SHALL BE APPROVED IN WRITING,
C.) CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION OF ALL
UNDERGROUND AND OVERHEAD UTILITIES PRIOR TO COMMENCEMENT OF WORK.
CONSTRUCTION NOTES:
DEPTH FROM
SURFACE
(INCHES)
501L
HORIZON
SOILSOIL
TEXTURE
(U5DA)
COLOR
(MUN5ELU
SOIL OTHER
MOTTLING
0-7"
0
----
-
NONE
7-20"
B
Loamy Sand
I CYR 78
NONE
20-140"
C1
Fine Sand
10 84
NONE TIGHT
Fme Sand
I OYR 814
NONE
TIGHT
PROPOSED BUILDING
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOP, AT LEAST
ro PROPOSED SIGN
O
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM.. WATER, TEST DISTRIBUTION
PROPOSED DOMESTIC WATER SERVICE
FERC A 50"
TEST HOLE 2: EL= 44.0±
1.) ALL CONSTRUCTION SHALL CONFORM TO THE STATE ENVIRONMENTAL CODE,
TITLE 5, AND THE REQUIREMENTS OF THE LOCAL BOARD OF HEALTH.
2.) SEPTIC TANK(5), GREASE TRAP(S), D051NG CHAMBER(5) AND DISTRIBUTION
BOX(ES) SHALL BE SET ON A LEVEL STABLE BASE WHICH HAS BEEN MECHANICALLY
COMPACTED, OR ON A G INCH CRUSHED STONE BASE,
3.) SEPTIC TANK(5) SHALL MEET ASTM STANDARD C) 127-03 AND SHALL HAVE
AT LEAST THREE 20" DIAMETER MANHOLES. THE MINIMUM DEPTH FROM THE BOT -
DEPTH FROM
SURFACE
(INCHES)
SOIL
HORIZON
501L
TEXTURE
(U5DA)
SOIL
COLOR
(MUN5ELL)
SOIL
MOTTLING
OTHER
0-8"
O
---
----
NONE
CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN G" OF
8-21'
B
Loamy Sand
I CYR 78
NONE
BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN I9/o.
2 1- 120'
C i
Fme Sand
I OYR 814
NONE
TIGHT
PROPOSED BUILDING
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOP, AT LEAST
ro PROPOSED SIGN
O
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM.. WATER, TEST DISTRIBUTION
PROPOSED DOMESTIC WATER SERVICE
FERC A 50"
H
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 0 MEASURED BELOW
PROPOSED FIRE SUPPRESSION
THE OUTLET INVERT..
TOTAL SQUARE FEET 25,489 5F
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CON515T Of 3/4' TO
SYSTEM DESIGN CALCULATIONS:
SEWAGE DE51GN FLOW: _
FACTORY, INDUSTRIAL PARK. WHAREHOUSE, ETC. I5GPD/PERSON x 15 PERSONS = 225 GPD 12° BERM FOR EDGE OF PAVEMENT
LEACHING CAPACITY REQUIRED:
FACTORY, INDUSTRIAL PARK, WHAREHOUSE, ETC. 15GFD/PERSON x 15 PERSONS = 225 GPD
SEPTIC TANK CAPACITY REQUIRED: -
DAILY rLOW = 420 GPD @ 200% = 840 GAL. REQUIRED
SEPTIC TANK CAPACITY PROVIDED:
:•'
1500 GALLON SEPTIC TANK (MIN. ALLOWED) '+:'�.', . •:. ... + . ,. �•.-„ .-•; '"'
LEACHING CAPACITY PROVIDED: - .:..: •- : - - , ...;
ONE (I) SIX 10.83' X 1 O" LEACHING CHAMBER CAN LEACH: - _ •. •" c ` '
Vt=[(26.75 X 10.83) + (26.75 X 0.83)2 + 00.83 X 0.83)2) X 0.74 GPD/5F=260.55 GPD '
260 GPD>225 GPD REQUIRED
NOTE: A GARBAGE DISPOSAL 15 NOT PERMITTED WITH THI5 DESIGN. I " BITUMINONOU5 TOP COAT
INSTALL:( 12" BITUMINOUS BINDER COARSE
ONEE(I))- 1500 GALLON SEPTIC TANK
ONE (1) - 3 OUTLET DISTRIBUTION BOX (H-20 Rated) G" MINIMUM COMPACTED SUB -BASE MATERIAL
THREE (3) - INFILTRATOR HIGH CAPACITY UNITS 34" x 75" x I G" SET END TO END WITH 4 SQUARE FEET Of STONE ARUND SUB STRATUM
TYPICAL ROADWAY PAVEMENT SECTION
NOT TO SCALE
ROUTE 6 STATE HIGHWAY
BENCHMARK:
Top of Catch Basin
EL=43.1 ± (Assumed daturn)
TOM OF THE SEPTIC TANK TO THE FLOW LINE SHALL BE 48". DATE OF TESTING: 9112107
PATH
4.) SCHEDULE 40 PVC INLET AND OUTLET TEES SHALL EXTEND A MINIMUM OF G" PERCOLATION PATE: LESS THAN 2 MIN/INCH IN "C" LAYER.
MINIMUM FRONTAGE
ABOVE THE FLOW LINE OF THE SEPTIC TANK AND SHALL BE INSTALLED ON THE WITNESSED BY: KEITH E. FERNANDES, EIT, BENNETT t ORE ILLY, INC.
DESCRIPTION
CENTERLINE OF THE TANK DIRECTLY UNDER THE CLEANOUT MANHOLE. PHIL RENAUD, AGENT, YARMOUTH HEALTH DEPARTMENT
OMH-Drainage
NO WATER ENCOUNTERED
5.) RAISE COVERS OF THE SEPTIC TANK AND DISTRIBUTION BOX WITH PRECAST USE A LOADING RATE OF 0.74 GPD/5F FOR 51ZING OF SOIL AB50PFTION SYSTEM.
vx
CONCRETE WATER TIGHT RISERS OVER INLET AND OUTLET TEES TO WITHIN G" OF
Edge Of CleannV:
FINISH GRADE, OR AS APPROVED BY THE LOCAL BOARD OF HEALTH AGENT.
20
G.) PIPING SHALL CONSIST OF 4" SCHEDULE 40 PVC OR EQUIVALENT, PIPE SHALL
Sewage Flow
BE LAID ON A MINIMUM CONTINUOUS GRADE OF NOT LESS THAN I9/o.
.00'
7.) DISTRIBUTION LINES FOR SOIL ABSORPTION SYSTEM (AS REQUIRED) SHALL BE
,W
4" DIAMETER SCHEDULE 40 PVC LAID AT 0.005 FT/FT. LINE SHALL BE CAPPED
Step 2/8.89
AT END OR AS NOTED.
PROPOSED BUILDING
8.) OUTLET PIPES FROM DISTRIBUTION BOX SHALL REMAIN LEVEL FOP, AT LEAST
ro PROPOSED SIGN
O
2' BEFORE PITCHING TO SOIL ABSORPTION SYSTEM.. WATER, TEST DISTRIBUTION
PROPOSED DOMESTIC WATER SERVICE
BOX TO ASSURE EVEN DISTRIBUTION.
H
9.) DISTRIBUTION BOX SHALL HAVE A MINIMUM SUMP OF 0 MEASURED BELOW
PROPOSED FIRE SUPPRESSION
THE OUTLET INVERT..
TOTAL SQUARE FEET 25,489 5F
10.) BASE AGGREGATE FOR THE LEACHING FACILITY SHALL CON515T Of 3/4' TO
WATER SERVICEm
1- 112" DOUBLE WASHED STONE FREE OF IRON, FINES AND DUST AND SHALL BE
giCF PAVER APRON
INSTALLED BELOW THE CROWN OF THE DISTRIBUTION LINE TO THE BOTTOM OF THE
. z
SOIL ABSORPTION SYSTEM. BASE AGGREGATE SHALL BE COVERED WITH A 2"
1000 SF
LAYER OF 1/8" TO 1/2" DOUBLE WASHED STONE FREE OF IRON, FINES AND DUST
„ _
1 1.) VENT SOIL A55OP,PTION SYSTEM WHEN DISTRIBUTION LINES EXCEED 50 FEET;
to be Removed -
WHEN LOCATED EITHER IN WHOLE OR IN PART UNDER DRIVEWAYS, PARKING AREAS,
0.51
TURNING AREAS OR OTHER IMPERVIOUS MATERIAL; OR WHEN PRESSURE DOSED,
;
12.) SOIL ABSORPTION SYSTEM SHALL BE COVERED WITH A MINIMUM OF 9" OF -
1000 SF
CLEAN MEDIUM SAND (EXCLUDING TOPSOIL).
CB FIND Gate
13.) FINISH GRADE SHALL BE A MAXIMUM OF 30 OVER THE TOP OF ALL SYSTEM
Existing Underground Utilities
COMPONENTS, INCLUDING THE SEPTIC TANK, DISTRIBUTION BOX, DOSING CHAMBER
N
AND SOIL ABSORPTION SYSTEM. SEPTIC TANKS SHALL HAVE A MINIMUM COVER
10
OF 9'L..
I+
14.) FROM THE DATE OF INSTALLATION OF THE SOIL ABSORPTION SYSTEM UNTIL
Edge of Clearing
m
RECEIPT OF A CERTIFICATE OF COMPLIANCE, THE PERIMETER OF THE SOIL AB5ORP-
Nitrogen Load from natural area
TION SYSTEM SHALL BE STAKED AND FLAGGED TO PREVENT THE USE OF SUCH
0.02
AREA FOR ALL ACTIVITIES THAT MIGHT DAMAGE THE SYSTEM.
12
15.) THE BOARD OF HEALTH SHALL REQUIRE INSPECTION OF ALL CONSTRUCTION
Step 3+5+7+9+ 1 1
BY AN AGENT OF THE BOARD OF HEALTH (OR THE DESIGNER IF THIS SYSTEM RE- -
QUIRES A VARIANCE) AND MAY REQUIRE SUCH PERSON TO CERTIFY IN WRITINGTHAT
Recharge from Sewage
ALL WORK HAS BEEN COMPLETED IN ACCORDANCE WITH THE TERMS OF THE Existing Curb Cut
O.OG
PERMIT AND APPROVED PLANS. 48 HOURS ADVANCE NOTICE 15 REQUESTED.
14
INSPECTION NOTE
Step G+8
PRIOR TO FINAL INSPECTION BY THE ENGINEER, SYSTEM
SYSTEM DESIGN CALCULATIONS:
SEWAGE DE51GN FLOW: _
FACTORY, INDUSTRIAL PARK. WHAREHOUSE, ETC. I5GPD/PERSON x 15 PERSONS = 225 GPD 12° BERM FOR EDGE OF PAVEMENT
LEACHING CAPACITY REQUIRED:
FACTORY, INDUSTRIAL PARK, WHAREHOUSE, ETC. 15GFD/PERSON x 15 PERSONS = 225 GPD
SEPTIC TANK CAPACITY REQUIRED: -
DAILY rLOW = 420 GPD @ 200% = 840 GAL. REQUIRED
SEPTIC TANK CAPACITY PROVIDED:
:•'
1500 GALLON SEPTIC TANK (MIN. ALLOWED) '+:'�.', . •:. ... + . ,. �•.-„ .-•; '"'
LEACHING CAPACITY PROVIDED: - .:..: •- : - - , ...;
ONE (I) SIX 10.83' X 1 O" LEACHING CHAMBER CAN LEACH: - _ •. •" c ` '
Vt=[(26.75 X 10.83) + (26.75 X 0.83)2 + 00.83 X 0.83)2) X 0.74 GPD/5F=260.55 GPD '
260 GPD>225 GPD REQUIRED
NOTE: A GARBAGE DISPOSAL 15 NOT PERMITTED WITH THI5 DESIGN. I " BITUMINONOU5 TOP COAT
INSTALL:( 12" BITUMINOUS BINDER COARSE
ONEE(I))- 1500 GALLON SEPTIC TANK
ONE (1) - 3 OUTLET DISTRIBUTION BOX (H-20 Rated) G" MINIMUM COMPACTED SUB -BASE MATERIAL
THREE (3) - INFILTRATOR HIGH CAPACITY UNITS 34" x 75" x I G" SET END TO END WITH 4 SQUARE FEET Of STONE ARUND SUB STRATUM
TYPICAL ROADWAY PAVEMENT SECTION
NOT TO SCALE
ROUTE 6 STATE HIGHWAY
BENCHMARK:
Top of Catch Basin
EL=43.1 ± (Assumed daturn)
\
NEEDS TO 8E COMPLETE INCLUDING BVILDUP.FOR COVERS. Per KEF Field Visit 9- 1 2-07
Map 109, Parcel 94
WHITE'S
PATH
40,000 5F
MINIMUM FRONTAGE
312s' 6O' Wlde, PUbllc Way
DESCRIPTION
EQUATION
OMH-Drainage
10 FEET
vx
Existing Utility Pole 2 5-1
"
Edge Of CleannV:
W
20
WITH PROPOSED LIGHT
Sewage Flow
a5 defined in 3 10 CMR 15.000
.00'
,W
Nitrogen Load/re5taurant Sewage
Step 2/8.89
N/A
PROPOSED BUILDING
s W U1
O W
11 3
ro PROPOSED SIGN
O
o eserv�
PROPOSED DOMESTIC WATER SERVICE
/+/ 3 +
�i
H
®SAI
PROPOSED FIRE SUPPRESSION
20.23
TOTAL SQUARE FEET 25,489 5F
5
WATER SERVICEm
Step 4 x 1 .80
giCF PAVER APRON
"NUMBER BASED ON OCCUPANT PROVIDING
. z
Exi5tl ng Foundation
1000 SF
a , s• iN sroNE wsr ,��,
„ _
r:
to be Removed -
'
0.51
DB
;
Roof Area
1000 SF
5.00
CB FIND Gate
RJ
Existing Underground Utilities
24. 4'+ 3 3 INf:RCL' DPWL
N
10
0' in
I+
4.34
\
NEEDS TO 8E COMPLETE INCLUDING BVILDUP.FOR COVERS. Per KEF Field Visit 9- 1 2-07
Map 109, Parcel 94
I bUU (iALLUN DB -3
SEPTIC TANK D -BOX
H-20
PLUMBER TO CONFIRM EXIT BUILDING ELEVATION PRIOR TO CONSTRUCTION OF SEWAGE DISPOSAL SYSTEM
PROPOSED (10' x 10) CONTAINMENT
AREA: 2' HIGH BLOCK WALL FOR
FERTILIZER STORAGE
EXISTING UNDERGROUND
UTILITIES ELECTRIC,
i TELEPHONE; � OTHER TO BE
CONFIRMED PRIOR TO START
OF CONSTRUCTION
EXISTING UTILITY TO
MECHANICAL BUILDING TO BE
RELOCATED TO EASEMENT
PRIOR TO START OF BUILDING
CONSTRUCTION
Proposed EL= 44.00±
\V
30" Proposed
(9" Min - 30 Max)
2" LAYER OF 1/8" - 1/2" STONE
/ 3/4" - 1- 112" STONE
0
T_
-2.83' 4'
USE 3 INFILTPCTOR HIGH CAPACITY UNIT5
34" x 75"( 19" WITH I O" INVERT 9.8'
5URROUPDED BY 4' OF STONE
(END VIEW) -
LEACHING CHAMBER 12- BOTTOM OFTE5T PIT#1 EL=30.3±
26.75' x 10.83'x 10" WITH STONE
132.7'±
��qW
LOT I
24.0'± Area= 47,878 SF±
MHB
Existing Curb Cut
Map 109, Parcel 92
Approximate Water Main Location
Based on Hydrant and Shut-off
s 21
1 g min. �,`� z43 'B tz 4 L r
I O' mm ' 1 20
ew k t� 2
1 9
Ir ,"g ,, ,,s<,�,.,�•r i``,- 18 -Q PROF05FD 12' LIGHT POST
"Y• �' O�'} WITH LIGHT (YF)
N=I /^
7
N VFJ FC)SEDp�"a1Ph $
8Df ozs§6) (�J N Q G
I V 6 W (p
03
Q
e r4��'c" ¥ a 1 5 N C
j4 �
3� � a: 'i �v-•ooi $xl2 l')p s bgFew
I�
aa. iz 13 �
N � isu"d
61 de Q•
I+
B-3 (BUS I N E55)
NITROGEN LOADING CALCULATIONS
40,000 5F
MINIMUM FRONTAGE
STEP
DESCRIPTION
EQUATION
RESULTS
10 FEET
I
Total Land Area
1 000 5F
47.88
�I
2
Sewage Flow
a5 defined in 3 10 CMR 15.000
260.55
3a
Nitrogen Load/re5taurant Sewage
Step 2/8.89
N/A
PROPOSED BUILDING
3b
Nitrogen Load/other sewage
Step 211 G.00
I G.28
867 5F
4
Fertilized Lawn * Garden Area
1000 SF
20.23
TOTAL SQUARE FEET 25,489 5F
5
Nitrogen Load from fertilizer
Step 4 x 1 .80
3G.4 I
"NUMBER BASED ON OCCUPANT PROVIDING
G
Pavement Area
1000 SF
16.31
'•
7
Nitrogen Load from pavement
Step G/3.2 1
0.51
8
Roof Area
1000 SF
5.00
CB FIND Gate
9
Nitrogen Load form roof area
Step 8/G.4 1
0.78
10
Natural Area
Step 1-(5tep5 4+G+8)
4.34
Edge of Clearing
m
1 1
Nitrogen Load from natural area
Step 1012 14
0.02
12
Total Nitrogen Load
Step 3+5+7+9+ 1 1
54.01
13
Recharge from Sewage
Step 2/4380
O.OG
00' Gommumcapon
14
Total Impervious Area
Step G+8
23.31
15
Recharge from imperviou5a area
Step 14/40. 10
0.58
1 G
Total Pervious Area
Step 4+ 10
24.57
17
Recharge from pervious area
Step I G/8e. 10
0,28
18
Total Recharge
Step 13+15+17
0.92
10
Recharged Nitrogen Concentration (ppm)
(Step 12/Step 18)/3.34
7.07
FLOW PROFILE:
NOT TO SCALE
CONCRETE SLAB
TOP OF FOUNDATION
-
.; y y.;. EL= 45.00
.,
I bUU (iALLUN DB -3
SEPTIC TANK D -BOX
H-20
PLUMBER TO CONFIRM EXIT BUILDING ELEVATION PRIOR TO CONSTRUCTION OF SEWAGE DISPOSAL SYSTEM
PROPOSED (10' x 10) CONTAINMENT
AREA: 2' HIGH BLOCK WALL FOR
FERTILIZER STORAGE
EXISTING UNDERGROUND
UTILITIES ELECTRIC,
i TELEPHONE; � OTHER TO BE
CONFIRMED PRIOR TO START
OF CONSTRUCTION
EXISTING UTILITY TO
MECHANICAL BUILDING TO BE
RELOCATED TO EASEMENT
PRIOR TO START OF BUILDING
CONSTRUCTION
Proposed EL= 44.00±
\V
30" Proposed
(9" Min - 30 Max)
2" LAYER OF 1/8" - 1/2" STONE
/ 3/4" - 1- 112" STONE
0
T_
-2.83' 4'
USE 3 INFILTPCTOR HIGH CAPACITY UNIT5
34" x 75"( 19" WITH I O" INVERT 9.8'
5URROUPDED BY 4' OF STONE
(END VIEW) -
LEACHING CHAMBER 12- BOTTOM OFTE5T PIT#1 EL=30.3±
26.75' x 10.83'x 10" WITH STONE
132.7'±
��qW
LOT I
24.0'± Area= 47,878 SF±
MHB
Existing Curb Cut
Map 109, Parcel 92
Approximate Water Main Location
Based on Hydrant and Shut-off
s 21
1 g min. �,`� z43 'B tz 4 L r
I O' mm ' 1 20
ew k t� 2
1 9
Ir ,"g ,, ,,s<,�,.,�•r i``,- 18 -Q PROF05FD 12' LIGHT POST
"Y• �' O�'} WITH LIGHT (YF)
N=I /^
7
N VFJ FC)SEDp�"a1Ph $
8Df ozs§6) (�J N Q G
I V 6 W (p
03
Q
e r4��'c" ¥ a 1 5 N C
j4 �
3� � a: 'i �v-•ooi $xl2 l')p s bgFew
I�
aa. iz 13 �
N � isu"d
61 de Q•
I+
B-3 (BUS I N E55)
MINIMUM AREA
40,000 5F
MINIMUM FRONTAGE
100 FEET
000llYvi
30 FEET
51DE YARD SETBACK
10 FEET
Gate
30 FEET
MAXIMUM BUILDING COVERAGE 1507P
MAXIMUM BUILDING HEIGHT
�I
MAXIMUM SHAPE FACTOR
22
5` i
37.0'± I
R i
70%
PROPOSED PARKING
10
PROPOSED BUILDING
ate.
I G
1,020 Sr
EXISTING CELL TOWER
867 5F
PROPOSED DUMPSTER PAD
100 SF
1
9
TOTAL SQUARE FEET 25,489 5F
,mi
's
Ir
47,878
"NUMBER BASED ON OCCUPANT PROVIDING
ARTIFICIAL RECHARGE FOR EXCE55 RUN-OFF
B
20. 0'_+ Buffer
'•
%
Lights "
Bottom of pe
CB FIND Gate
- �
Edge of Clearing
m
10 Buffer
00' Gommumcapon
Tower Easement
-"
200.90'
PLAN
SCALE 1 "=30'
THIS AREA 15 SERVED
BY TOWN WATER.
TWO (2) PROPOSED 5TORAGE BIN5
"BARK MULCH
'STONE -
Map 109, Parcel 93.2
Vacant Land
-PROPOSED ISLAND
W WIDE
I
-PROPOSED 20'x 10'
PARKING SPACE (TYP)
PROPOSED 10'x 10'
CONCRETE DUMPSTER PAD
-TWO (2) PROPOSED STORAGE BI145
'STONE DUST
"LOAM
Curb Cut
PARKING DETAIL
SCALE 1 "=30'
PROPERTY 15 LOCATED IN THE ZONE II
OF A PUBLIC WATER SUPPLY
0 30 GO 90
SCALE 1"=30'
G:\4utocad 2005\Land Projects 2005\2005Dra.ong5\Fanara4743\4743PROP05ED.parking.dwg
MAXIMUM BUILDING COVERAGE
B-3 (BUS I N E55)
MINIMUM AREA
40,000 5F
MINIMUM FRONTAGE
100 FEET
FRONT YARD SETBACK
30 FEET
51DE YARD SETBACK
10 FEET
REAR YARD SETBACK
30 FEET
MAXIMUM BUILDING COVERAGE 1507P
MAXIMUM BUILDING HEIGHT
35 FEET
MAXIMUM SHAPE FACTOR
22
MAXIMUM BUILDING COVERAGE
15%
LOT AREA
47,878 5F
EXISTING BUILDING COVERAGE
TOWER FOOTINGS (3)
8G7 SF
MECHANICAL BUILDING
1,020 5F
FROP05ED BUILDING
4,000 5F
PROPOSED DUMPSTER PAD
100 5F
TOTAL SQUARE FEET
5,987 SF
BUILDING COVERAGE % 5,987
-12.5%
47,878
MAXIMUM LOT COVERAGE"
70%
PROPOSED PARKING
18,308 5F
PROPOSED BUILDING
4,000 5F
EXISTING MECHANICAL BLDG
1,020 Sr
EXISTING CELL TOWER
867 5F
PROPOSED DUMPSTER PAD
100 SF
PROPOSED POOL t APRON
1, 194 5F
TOTAL SQUARE FEET 25,489 5F
LOT COVERAGE % 25,489
= 53.2%
47,878
"NUMBER BASED ON OCCUPANT PROVIDING
ARTIFICIAL RECHARGE FOR EXCE55 RUN-OFF
NUMBER OF OCCUPANTS IN 4,000 S.F.
BUILDING PER MASS. STATE BUILDING
CODE TABLE 1008. 1.2: INDUSTRIAL AREAS
100 S.F. FLOOR AREA/ OCCUPANT (OC)
4,000 S.F./ 100 S.F./ OC- 40 OC
YARMOUTH REGULATION I SPACE/ 2 OC
40 OC"(I SPACE/ 2 OC)= 20 SPACES
SPACES PROVIDED= 21
1 SPACE PROVIDED FOR ACCESS
TO MECHANICAL BUILDING