Loading...
HomeMy WebLinkAbout0 Willow Street - Cape Light Compact - Site Plan 12BLDG 5 6400 SF IST FLOOR 8400 SF 2ND R SLAB EL. 38.5 IF REQUIRED FOR FUTURE USE CHANGE: NTIVE PARKING ARRANGEN INDICATES PARKING POSSIBLE ON GROUND LEVEL OF BUILDING 8 OFFICE OR STORAGE USE ON 2ND STORY ONLY SCALE: I " - 60' 178 NEW SPACES - 14 LOST SPACES = NET GAIN 164 SPACES C.I. RING & COVER ---'-' MANHOLES LEBARON LA0910 OR EQ. OVER - CLEANOUT TO GRADE. 8"bS N40 PVC AT TANKS �f0 STI 9" TEE Q6 4'b ---5T2 ---' -- MANHOLES w/ GAS E AT -TOP --SECTION--_-_.. , EQUAL INVERT TO 6"OSCH40 PJC 2'-10" 26" ------/ MANUF. Le BARON, BROCKTON, MA MODEL: LT 105 WEIGHT: 430 LBS TYPICAL ACCESS COVER SCALE: 3/4" = 1'-0" PARKING CALCULATIONS: OFFICE USE: 100,800 SF X 1/200 SF = 504 SPACES REQ. 504 SPACES PROVIDED (INCL. 11 ACCESSIBLE SPACES) STORAGE USE: 74,884 SF (1/200)=375 SPACES REQUIRED 36 SPACES PROVIDED (INCL. 1 ACCESSIBLE SPACE) NOTE: IF REO.'D FUTURE PARKING EXPANSION ON GROUND LEVEL OF BLDG 8 YIELDS NET GAIN OF 164 SPACES FOR 200 TOTAL. FUTURE STORAGE USE: 40,892/200 = 205 REO. TREE CALL: 540 SPACES X i TREE/8 CARS =68 REQ. (68+) 3" CALIPER PARKING TREES SHOWN CAST BIOCLERE UNIT /8" THi SOIL EVALUATOR: DAN OJALA P.L.S. DOWN CAPE ENGINEERING WITNESS: KELDA WELCH (BOH) EXCV. SCOTT (BORTOLOTTI) DATE: MAY 22 1999 0-2" 0 ORGANIC 10YR3/2 2-5" A LOAMY SAND 10YR4 4 5-38" B LOAMY SAND 10YR6/6 38-66" Cl M/C SAND 2.5Y6/6 66-78" C2 SANDY LOAM 7.5YR6/6 (FIRM, UNSUITABLE) 78-144"C3 M/C SAND 10YR5/6 GROUNDWATER FOUND AT 10.8' EL. 37.14 0" 0 2- A 5" g ZONE E EL. 33.97 38" AIW247 4/99 23.9 -ZONE D-5.3 AIW230 4/99 23.5 ZONE E-4.5 USE 5.3' ADJ. Cl EL. 31.64ADJ. WATER C2 EL. 30.64 78" 5.3' C3 EL. 26.34 _ OBSV. WATER AT 10.8' EL. 25.14 144" NOTE: ADDITIONAL INFORMATION ACCOMPANYING PLAN: SEE ATTACHMENT FOR ADDITIONAL SOIL INFORMATION. SEE NITROGEN CALCULATIONS FOR SITE ATTACHED DRAINAGE CALCULATIONS FOR SITE TH6 (AUGER HOLE) SOIL EVALUATOR: DAN OJALA P.L.S. DOWN CAPE ENGINEERING DATE: 4-27-99 2 PM 0-1" 0 ORGANIC 10YR2/1 1-3" A LOAMY SAND IDYR3/2 3-36" B LOAMY SAND 10YR6 8 109 GRAVEL 36-126" C1 M/C SAND 2.5Y7/6 109 GRAVEL EL. 36.9 0 0" 1" A 3., B ZONE E EL. 33.9 36., AIW247 4/99 23.9 -ZONE D-5.3 AIW230 4/99 23.5 ZONE E-4.5 USE 5.3' ADJ. Cl EL. 31.8 ADJ. WATER 5.3' EL. 26.5 _ OBSV. WATER AT 10.4' EL. 26.4 126" 12" X 3" 1 TOPCOAT MASS DPW CCBERM TYPE 11 BINDER ° o o°o o°o°oo 12" PROCESSED GRAVEL MDPW M1.03.1 VIB, ROLLER COMPACTED REMOVE TOP &SUBSOIL COMPACT SUBBASE JT CROSS SECTION NOT TO SCALE SEPTIC SYSTEM DESIGN DATA OFFICE USE: 3 BLDGS 0 16,800SF (75 GPD/1000 SF) = 3780 GPD SEPTIC TANKS AND SYSTEM TECHNOLOGY & COMPONENTS TO BE SIZED TO DISCHARGE DOCTORS OFFICES: 2 BLDGS 0 9 DOCTORS/BLDG (250 GPD/DOCTOR) = 4500 GPD EFFLUENT WHICH MEETS CLASS I GROUNDWATER STANDARDS PURSUANT TO 314 CMR 6.00 DENTIST OFFICES: 1 BLDGS 0 10 CHAIRS/BLDG (200 GPD/CHAIR) = 2000 GPD PRELIMINARY DESIGN ILLUSTRATED: TO BE REFINED THROUGH THE DEP PERMITTING PROCCESS. STORAGE USE: NO FLOW REQ. (1000 SF OFFICE =75 GPD) PRESSURE DOSING UTILIZED. TOTAL DESIGN FLOW = 10,355 GPD. P/C: USE 12,000 GAL PUMP CHAMBER NO GARBAGE DISPOSALS ALLOWED GROUNDWATER DISCHARGE PERMIT REQUIRED LEACHING: USE (2) 71'X100' LEACHING FIELDS = 14,200 SF PER 310 CMR 15.004(2) CAPACITY: 14,200(.74 GPD/SF) = 10508 GPD> 10355 GPD. O.K. SYSTEM TO UTILIZE AWT BIOCLERE TERTIARY TREATMENT UNITS UNDER D.E.P. SUPERVISION (GROUNDWATER DISCHARGE PERMITTING) FOR DENITRIFICATION AND ENHANCED TREATMENT OF EFFLUENT. FINAL NITROGEN CONCENTRATIONS WILL BE LESS THAN 10 PPM SEE ATTACHED NITROGEN CALCULATIONS FOR SITE. CL BIOCLERE UNIT - PITCH --- --- __- _ ._. _. .005 MIN. 6'OSCH40 PVC _ ---- 4"0SCHaO PVC -_-_.______ .005 MIN. ---.__-_ _- _ _ FINAL CLARIFIER - 5.0' ---- --REMOVE--ALL-,tAND$HOR120N-$OILS-0 D-AN'f-OTHER- -- --- ____SQO AL - PUMP CHAMBER UNSUITABLE SOILS ENCOUTERED BELOW ANO WITHIN 5' LATERALLY IN ALL DIRECTIONS FROM THE OUTER PERIUETER OF--➢iE3AS�fID.BEP1ACt-WITH..CLEMISAN0.AS._ PERIMETER IN 310 CMR 15.255 CONSTRUCTION IN FILL" :RETE BALLAST - - 31.84 W/ GAS BAF REQUIRE -- _ - - --_- _ DUAL SEWAGE PUMPS REMOVE TO THE BOTTOM OF THE B LAYER AND WITH -RAI- ANY UNSUITABLE SOIL AS SHOWN -- SEE DETAIL SHEET -- ----' -_--___.___.___-LN-TESTfiOLETOGS.�COEPTFrOF-FILL AND -____- -_.__- --- ----- UNSUITABLE MATERIAL MAY VARY, ENGINEER TO INSPECT REMOVAL. FABRIC OVER OVERLAP 12" DRILL (2) 1"0 HOLES �L ADJ. BLOCK: 4" PFASTONF nvF'R PIPE 12"0 SLOTTED H-20 MORTAR ALL COMPONENTS TOP OF STRUCTURE ELEVATION VIEW R" N -9n E -R.0 CI 'c I ICTrn CORRUGATED HDPE PIPE (TYP•) or -r I mo J TJ I M 5tGjjl Op 08 75"-1.5" DOUBLE SCALE: 1" - 5' HORIZ. & VERTICAL 2 p OO o! WASHED STONE PRELIMINARY SCHEMATIC OF DESIGN TO DEP REQ.'S ��J ALL UNSUITABLE MATERIALS TO BE REMOVED.06 0 0 68 0.,0 0 - LeBARON CAST IRON SEE PAVEMENT SECTION 4' FOR 5' HORIZONTALLY AND TO REQUIRED DEPTH AROUND. ALL LEACHING 00 0.. 12"0 ELDBOW IPE H-20 RATED CL SYMMETRY VALVE BOX TO GRADE. (20) REO. FEMALE ADAPTOR & THREADED PLUG TRENCH CROSS SECTION SLEEVE TO ALLOW MOVEMENT Eq�y �°, REDUCE NTS BOTTOM LEVEL AT EL. 31.9 12"0 HDPE POURED CONCRETE DONUT ADJ. G.W. EL. 30.9' DRILL LAST HOLE IN EACH H-20 CATCH BASIN 'OX6'-8" 2 CU FT. MIN. 4'OSCH 40 PVC 90' TEE ON SOUTH END OF SITE LATERAL ON TOP TO VENT 1.5"b V T Lw un TNMAEAR A R Fi.l ___-_-_-_-_-_-_-_-_-_- _ -_-- _--- - -- - _- ------------------ AIR WHILE LATERAL FILLS SCH 40 PVC 3000 PSI CONC. ' SECTIONAL PLATE ---- 1.5'OSCH40 PVC 2 oC@+C. THRUST BLOCK AROUND CONNECTION "bRISER L.5'b5CH40 LATERAL o4- O�O 90' ELECTICAL CONDUIT SWEEP I+eA" 0x SL (TYP.) VARIES .. T- CE o 1 4' ORIFICE ALTERNATE TOP & BOTTOM INVERT LEVEL AT RmvPn L 6' TO 4' TEE O o 60' O.C. WITH SHIELDS I O 1 I N'KCOUT P,T cLFiHauT AT *nc fw 6"65CH 40 PVC MANIFOLD cB o (13 ORIFICES PER LATERAL) I � o « IF « Tnc u.wlram L_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-_-___ - _ - _ - _ - _ - 08 o 7/ _ -o _J SEPTIC PIPING LX;~ R,4 SIDE ELEVATION VIEW DETAILS NTS c.l FABRIC OVER OVERLAP 12" DRILL (2) 1"0 HOLES �L ADJ. BLOCK: 4" PFASTONF nvF'R PIPE 12"0 SLOTTED H-20 MORTAR ALL COMPONENTS TOP OF STRUCTURE ELEVATION VIEW R" N -9n E -R.0 CI 'c I ICTrn CORRUGATED HDPE PIPE (TYP•) ADS N-12 OR EQUAL Op 08 75"-1.5" DOUBLE - ~�~ 2 p OO o! WASHED STONE 2.0' (TYP.) ��J ALL UNSUITABLE MATERIALS TO BE REMOVED.06 0 0 68 0.,0 0 - 3 C.B. TRAP f 4' FOR 5' HORIZONTALLY AND TO REQUIRED DEPTH AROUND. ALL LEACHING 00 0.. 12"0 ELDBOW IPE TRENCH. ENGINEER TO INSPECT. UNSUITABLE SUBSOIL AVERAGED 3' DEPTH. TRENCH CROSS SECTION SLOTTED H-20 PROPOSED NTS BOTTOM LEVEL AT EL. 31.9 12"0 HDPE 1000 GALLON PRECAST ADJ. G.W. EL. 30.9' LEVEL BETWEEN BASINS H-20 CATCH BASIN 'OX6'-8" ON SOUTH END OF SITE SHOREY SOLID BASIN H-20 OR EQUAL SECTIONAL PLATE DRA-IN49tE' CROSS SECTIONS -. - L_N07 TO SCALE 98-330 uvAl rLa, FL - - DATE DETAIL SHEET ACCOMPANYING SITE PLAN OF LAND IN WEST YARMOUTH, MA CAPE LIGHT COMMONS OFFICE PARK AND STORAGE CENTER SCALE AS NOTED DATE: 7-19-99 PREPARED FOR: BORNSTEIN COMPANIES 297 NORTH STREET HYANNIS MA off 506-362-45.1 1 fox 508 362 98 SHEET 2 OF 2 80 I own cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main St. yarmouthport, ma 02675