Loading...
HomeMy WebLinkAbout0 Willow Street - Cape Light Compact - Site Plan 14/ IF QUIRED FOR TURE E CHANGE: ALTERNATIVE REPARKING DSARRANGEMENT - INDICATES PARKING POSSIBLE ON GROUND LEVEL OF BUILDING 8 .OFFICE OR STORAGE USE ON 2ND STORY ONLY SCALE: 1" = 60' NOTE: SUBJECT TO MINOR CHANGE DUE TO COLUMN PLACEMENT: ASSUME 10 SPACES LOST TO COLUMNS 133 NEW SPACES - 24 LOST SPACES NET GAIN 109 SPACES LEBARON 1AO910 OR E0. OVER CLEANOUT TO GRADE. IYS0fl:T6Y ;] z'- 10" F_ 26" MANUF. Le BARON, BROCKTON, MA MODEL: LT 105 WEIGHT: 430 LBS TYPICAL ACCESS COVER SCALE: 3/4" 32" 24" N� v. 3" FRAME TH2 AND 19' TEE COMPARTMENT 2 W/ GAS BAF E GRATE -�SDDDT'A�7500 BLDG 5 SCALE: 3/4" = MINIMUM WEIGHT: t'-0" 388 LBS. 8400 SF ISI LL OR LC` SLAB EL 38.5 3" _ _FULL PIPF HFIGHi SOIL EVALUATOR: DAN OJALA P.L.S., SE Q 26C, WITNESS: KELDA WELCH (BOH) EXCV. STEVE VAUGHN(BORTOLOTTI) DOWN CAPE ENGINEERING EXCV. SCOTT (BORTOLOTTI) EXCV. SCOTT (BORTOLOTTI) DATE: 7-2-99 2 PM EXCV. STEVE VAUGHN(BORTOLOTTI) DATE: MAY 22 1999 DATE: MAY 22 1999 - PRELIMINARY SCHEMATIC DATE: 7-2-99 2 PM 0-2" 0 ORGANIC 10YR3/2 0-3" 0 ORGANIC 10YR3/2 0-2" 0 ORGANIC 10YR2/1 0-2" 0 ORGANIC 10YR2 2-5" A LOAMY SAND 10YR4/4 3-8" A LOAMY SAND 10YR4 4 SMH 2-4" A LOAMY SAND Y O 5-38" 8 LOAMY SAND 10YR6/6 38-66" Cl M/C SAND 2.5Y6/6 37.41 4 4-36" B LOAMY SAND 2.8.577/6/6 36-66" Cl M/f SAND / I 30-48" Cl M/C SAND 2.576/6 10% GRAVEL 48-68" C2 MED SAND 2.577/3 60"-84" C2 LOAMY SAND 2.5Y8/4 (REMOVE C2 FOR DRAINAGE, 84"-132" C3 M/C SAND LEv\' 78-144"C3 M/C SAND 10YR5/6 68-168"C3 M/C SAND 2.576/6 LENS OF SILT LOAM FROM 5'-10' / II 78"-138" C3 M/C SAND 2.5Y7/6 GROUNDWATER FOUND AT 10.8' GROUNDWATER FOUND AT 12.0' ON SOUTH SIDE OF HOLE NO GROUNDWATER FOUND NO GROUNDWATER FOUND CL UNSUITABLE; REMOVE EL 37.14 0 0" El. 37.75 0" EL. 37.7 0 0" EL 36.7 0" 2" 0 3„ 2" 0 2" A g" z A 4" 3 � B ZONE E B ZONE E B B EL. 33.97 38- AIW247 4/99 23.9 -ZONE D-5.3 / /xI, �� TWO STORY NIXED USE BUILDING II EL. 34.7 36" EL. 33.7 FIRST FLOOR PARKING II AIW230 4/99 23.5 ZONE E-4.5 C7 2ND FLOOR: 33,992 SF OFFI E I I USE 5.3' ADJ. Ci USE 5.3' ADJ. b / 8 31 9 2 SF F&G Cl El. 33.75 48" SLA L7T8.5 iq! 1 5'IM O V T C2 EL 3212 66" BOTTOM PERC AT 81" C2 BOTTOM PERC AT 46" 68" 24 GAL POURED EL. 30.70 84" EL 29 70 C2 84" EL.C31.64 - ADJ. WATER 24 GAL POURED IN 4:30 / IF QUIRED FOR TURE E CHANGE: ALTERNATIVE REPARKING DSARRANGEMENT - INDICATES PARKING POSSIBLE ON GROUND LEVEL OF BUILDING 8 .OFFICE OR STORAGE USE ON 2ND STORY ONLY SCALE: 1" = 60' NOTE: SUBJECT TO MINOR CHANGE DUE TO COLUMN PLACEMENT: ASSUME 10 SPACES LOST TO COLUMNS 133 NEW SPACES - 24 LOST SPACES NET GAIN 109 SPACES LEBARON 1AO910 OR E0. OVER CLEANOUT TO GRADE. IYS0fl:T6Y ;] z'- 10" F_ 26" MANUF. Le BARON, BROCKTON, MA MODEL: LT 105 WEIGHT: 430 LBS TYPICAL ACCESS COVER SCALE: 3/4" 32" 24" N� v. 3" FRAME TH2 AND 19' TEE COMPARTMENT 2 W/ GAS BAF E GRATE -�SDDDT'A�7500 AL SCALE: 3/4" = MINIMUM WEIGHT: t'-0" 388 LBS. PARKING CALCULATIONS: OFFICE USE: 100,800 SF X 1/200 SF = 504 SPACES REQ. 504 SPACES PROVIDED (INCL. 11 ACCESSIBLE SPACES). STORAGE USE: 74,884 SF (1/200)=375 SPACES REQUIRED 36 SPACES PROVIDED (INCL. 1 ACCESSIBLE SPACE) NOTE: IF REQ.'D FUTURE PARKING EXPANSION ON GROUND LEVEL OF BLDG 8 YIELDS NET GAIN OF 109 SPACES FOR 145 TOTAL. FUTURE STORAGE USE: 40,892/200 = 205 REQ, ZONING RELIEF FOR 60 CARS REQUIRED. (VERSUS 339 SPACES PARKING RELIEF FOR CURRENT LAYOUT) TREE CALC: 540 SPACES X 1 TREE/8 CARS = 68 REQ. (68+) 3" CALIPER PARKING TREES SHOWN BIOCLERE UNIT 1 STl ASM C-4]8 4'O PRECAST MANHOLES -_-- H_- O RUT TOP--SEGT ACME OR EQUAL TH2 SEPTIC 19' TEE TAN �_ COMPARTMENT 1 W/ GAS BA E 19' TEE COMPARTMENT 2 W/ GAS BAF E SOIL EVALUATOR: DAN OJALA P.L.S. -�SDDDT'A�7500 AL FORMED INVERT TO DOWN CAPE ENGINEERING DOWN CAPE ENGINEERING _ _FULL PIPF HFIGHi SOIL EVALUATOR: DAN OJALA P.L.S., SE -60SCH4O PPC - CONCRETE BALLAST TH1 TH2 TH3 11 s r+rwc-mrn.�:LLnrr_SAN IN 3I0 CMR 15.255 'CONSTRUCTION IN FILL SPiC61E0 I REMOVE TOP & SUBSOIL COMPACT SUBBASE 31.64' REMOVE TO THE 80TTOM OF THE B LAYER AND _ _- ---- __ NY UNSUITABLE SOIL AS SHOWN A VE M E N T CROSS S E C TI 0 NEE SOIL EVALUATOR: DAN OJALA P.L.S. SOIL EVALUATOR: DAN OJALA P.L.S. SOIL EVALUATOR: DAN OJALA P.L.S., SE TH4 DOWN CAPE ENGINEERING DOWN CAPE ENGINEERING DOWN CAPE ENGINEERING SOIL EVALUATOR: DAN OJALA P.L.S., SE WITNESS: KELDA WELCH (BOH) WITNESS: KELDA WELCH (BOH) EXCV. STEVE VAUGHN(BORTOLOTTI) DOWN CAPE ENGINEERING EXCV. SCOTT (BORTOLOTTI) EXCV. SCOTT (BORTOLOTTI) DATE: 7-2-99 2 PM EXCV. STEVE VAUGHN(BORTOLOTTI) DATE: MAY 22 1999 DATE: MAY 22 1999 - PRELIMINARY SCHEMATIC DATE: 7-2-99 2 PM 0-2" 0 ORGANIC 10YR3/2 0-3" 0 ORGANIC 10YR3/2 0-2" 0 ORGANIC 10YR2/1 0-2" 0 ORGANIC 10YR2 2-5" A LOAMY SAND 10YR4/4 3-8" A LOAMY SAND 10YR4 4 2-4" A LOAMY SAND 10YR5/ 2 4_ 36" 8 LOAMY SAND 2.577/6 2-4" A LOAMY SAND Y O 5-38" 8 LOAMY SAND 10YR6/6 38-66" Cl M/C SAND 2.5Y6/6 8-30" B LOAMY SANG 10YR5 8 36-60" Cl M/F SAND 2.577/4 (LOWER 12" t0YR3/2) 4-36" B LOAMY SAND 2.8.577/6/6 36-66" Cl M/f SAND 66-78- C2 SANDY LOAM 7.5YR6/6 (FIRM, UNSUITABLE) 30-48" Cl M/C SAND 2.576/6 10% GRAVEL 48-68" C2 MED SAND 2.577/3 60"-84" C2 LOAMY SAND 2.5Y8/4 (REMOVE C2 FOR DRAINAGE, 84"-132" C3 M/C SAND 2.577/4 66"-78" C2 SILT LOAM 2.5Y6/4 (UNSUITABLE, REMOVE) 78-144"C3 M/C SAND 10YR5/6 68-168"C3 M/C SAND 2.576/6 LENS OF SILT LOAM FROM 5'-10' 2.5Y7/6 OK FOR SAS) 78"-138" C3 M/C SAND 2.5Y7/6 GROUNDWATER FOUND AT 10.8' GROUNDWATER FOUND AT 12.0' ON SOUTH SIDE OF HOLE NO GROUNDWATER FOUND NO GROUNDWATER FOUND CL UNSUITABLE; REMOVE EL 37.14 0 0" El. 37.75 0" EL. 37.7 0 0" EL 36.7 0" 2" 0 3„ 2" 0 2" A g" A 8., A 4" A 4.. B ZONE E B ZONE E B B EL. 33.97 38- AIW247 4/99 23.9 -ZONE D-5.3 EL. 35.25 30" AIW247 4/99 23.9 -ZONE D-5.3 EL. 34.7 36" EL. 33.7 AIW230 4/99 23.5 ZONE E-4.5 AIW230 4/99 23.5 ZONE E-4.5 C7 36" USE 5.3' ADJ. Ci USE 5.3' ADJ. EL. 32.7 60" Cl El. 33.75 48" C1 1 5'IM O V T C2 EL 3212 66" BOTTOM PERC AT 81" C2 BOTTOM PERC AT 46" 68" 24 GAL POURED EL. 30.70 84" EL 29 70 C2 84" EL.C31.64 - ADJ. WATER 24 GAL POURED IN 4:30 EL. 32.08 6"AT 10:30 <2 MIN/IN C2 IN/IN <2 M EL. 31,05 _ ADJ. WATER EL. 30.64 78" 5.3 5.3' C3 C3 C3 C3 EL. 26.34 _ OBSV. WATER AT 10.8' EL. 25.75 _ OBSV. WATER AT 12.0' �OUR 2 CU::�R. tN _-_-_-_-_-_-_-_-_-_____-___-___-_-_-_ EL. 25.14 144" EL. 23.75 168" EL. 26.7 132" EL. 25.2138" TH5 THS SOIL EVALUATOR: DAN OJALA P.L.S., SE DOWN CAPE ENGINEERING TH6 (AUGER HOLE) SOIL EVALUATOR: DAN OJALA P.L.S., SE DOWN CAPE ENGINEERING SOIL EVALUATOR: DAN OJALA P.L.S., SE EXCV- STEVE VAUGHN(BORTOLOTTI) DATE: SOIL EVALUATOR: DAN OJALA P.L.S. EXCV. STEVE VAUGHN(BORTOLOTTI) ) DOWN CAPE ENGINEERING 7-2-99 2 PM DOWN CAPE ENGINEERING DATE: 7-2-99 2 PM EXCV. STEVE VAUGHN(BORTOLOTTI) 0-2 0 ORGANIC 10YR2/1 DATE: 4-27-99 2 PM 0-3" 0/A LOAMY SAND 10YR3/2 DATE: 7-2-99 2 PM 2-4" A LOAMY SAND 10Y 4-36" B LOAMY SAND 2.577//66 3-5" E LOAMY SAND 10YR7 0-2" O/A LOAMY SAND 10YR4/2 2-4" E LOAMY 36-66" Cl MSAND 2.576/4 (TRACE SILT) 0-1" 0 ORGANIC t0YR2/1 1-3" A LOAMY SAND 10YR3/2 5-34" 8 LOAMY SAND 1077 8/2 34-132" Cl MED SAND 2.5Y7/4 SAND 10YR6/1 4-36" 6 LOAMY SAND 10YR6/6 VARIGATED COLORS AT 84" 66"-72" C2 SILT LOAM 2.577/4 (UNSUITABLE, REMOVE) 3-36' B LOAMY SAND 10YR6/8 10% GRAVEL36-132" Cl M/C SAND 2.5Y7/6 72"-138" C3 M/C SAND 2.576/4 36-126" Cl M/C SAND 2.5Y7/6 10% GRAVEL GROUNDWATER AT 10.5' GROUNDWATER AT 10.6' NO GROUNDWATER FOUND - I ` O O ce 1 4' ORIFICE ALTERNATE TOP & BOTTOM 60' O.C. WITH SHIELDS g EL. 36.9 0" x'•scx-w cl[,Ixwr p� AT ra tr0 EL 38.0 0" 0 1" 0 (13 ORIFICES PER LATERAL) A2- A A 0;; EL 35.44 O/ EL. 36.20 0" 6"eSp1 b PVC u4/IFOLDL_-_-_-_-_-_-_-_-_-_-----_-._-_-_-_- 3" O/A 2" 4" B ZONE E E 5•� E B AIW247 4/99 23.9 -ZONE D-5.3 EL. 33.9 36" 4" EL. 35.0 36" AIW230 4/99 23.5 ZONE E-4.5 B ZONE E B Cl USE 5.3' ADJ. EL. 32.60 34" AIW247 6/99 24.3 -ZONE D-6.0 AIW230 6/99 23.9 EL. 33.20 36• AIW24ZONE 7 6/99 24.3 -ZONE D-6.0 Cl ZONE E-5.1 USE 6.0' ADJ. AIW230 6/99 23.9 ZONE E-5.1 EL. 32.5 66" USE 6.0' ADJ. EL. 32.0 C2 72" EL. 31.8_ ADJ WATER Cl BOTTOM PERC AT 78" Cl 24 GAL IN 8:30 5:3' EL. 30.94 _ ADJ. WATER <2 MIN/IN EL. 31.60 _ ADJ. WATER C3 EL. 26.5 _ OBSV. WATER AT 10.4' 6.0' EL. 26.5 138" EL. 26.4 126" EL. 24.94 - 126" EL. 25.60 127" EL. 23.55 132" _ EL. 25.20 732" NTS DRAINAGE SYSTEM l - 1 SCALE: 1' 200' /' �0 MIRAFI 140N SOLID SECTION 4 4S• FABRIC OVER Y {> OVERLAP 12" mI {� DRILL (2) 1"0 ' HOLES 4" PEASTONE OVER PIPE 12"0 SLOTTED H-20 MORTAR ALL COMPONENTS LENGTH BETWEEN STRUTRENCHCTURES U E) % CORRUGATED HDPE PIPE SNP-) � OF 2{ o ADS N-12 OR EQUAL mom' x`235. 3 .75"-1.5" DOUBLE 150' \ C�/ WASHED STONE 2.0 (TYP.) o a o p o 3 C.B. TRAP �d 01 ALL UNSUITABLE MATERIALS TO BE REMOVED �Q p O Q..0p 12"O HDPE PIPE FOR 5' HORIZONTALLY AND TO REQUIRED DEPTH 8 - O J ELBOW AROUND ALL LEACHING TRENCH. ENGINEER TO INSPECT. 786, .o/ UNSUITABLE SUBSOIL AVERAGED 3' DEPTH, TRENCH CROSS SECTION SLOTTED H-20 PROPOSED \ ♦ 2' o� {1000 GALLON PRECAST NTS BOTTOM LEVEL AT EL. 31.9 12"0 HDPE H-20 CATCH BASIN ADJ. G.W. EL. 30.9' LEVEL BETWEEN BASINS 0X6'-8" SHOREY SOLIC v ON SOUTH END OF SITE BASIN H-20 OR EQUAL SE ' SEE ATTACHED DRAINAGE CALCULATIONS DRAINAGE r C R 0 S S SECTION NOT TO SCALE ELEVATION VIEW 8" H-20 FF(G FI 'S I IGTFF) 98-330 1. BLOCKS AS REQ. TOP OF STRUCTURE CL LEACHING _ I FINISH -ALDMINUM-HATCH--__. - ..4"O -TO-VO-EXPANSION-- - -LAWN$ 3 30 XX 0 it 1 PITCH DD5 MIN. PUMP CHAMBER -2000 GAL H-' H-2 _'-3' AIA$-. -- -_ I TYP 12" X 3" 1" TOPCOAT MASS DPW CCBERM TYPE 11 2" BINDER IOQO�O�OopOpo�0p0 12" PROCESSED GRAVEL MDPW M1.03.1 VIB. ROLLER COMPACTED 11 s r+rwc-mrn.�:LLnrr_SAN IN 3I0 CMR 15.255 'CONSTRUCTION IN FILL SPiC61E0 I REMOVE TOP & SUBSOIL COMPACT SUBBASE 31.64' REMOVE TO THE 80TTOM OF THE B LAYER AND _ _- ---- __ NY UNSUITABLE SOIL AS SHOWN A VE M E N T CROSS S E C TI 0 NEE UAL SEWAGE PUMPS NTH -RAIL -MOUNT -SYS - - . _ SEPTIC SYSTEM_ SECDON _NST�NEYVD UNSUITABLE ALMAY VARY, TO NOT TO SCALE INSPECT REMOVAL SCALE: 1" - 5' HORR. & VERTICAL - PRELIMINARY SCHEMATIC OF DESIGN TO DEP REQ.'S LeBARON CAST IRON SEE PAVEMENT SECTION H-20 RATED VALVE BOX TO FEMALE ADAPTOR & THREADED PLUG CL SYMMETRY GRADE. (20J REO. SLEEVE TO ALLOW MOVEMENT c� drro tr cpm L!&tJH iAoulo OR tw POURED CONCRETE DONUT REDUCE? 2 CU f. MIN. DRILL LAST HOLE IN EACH 1 5'IM O V T iwlOntD quG 4 05CH 40 PVC 90' TEE LATERAL ON TO VENT SCH 40 PJC LATOP AIR WHILE LLS �OUR 2 CU::�R. tN _-_-_-_-_-_-_-_-_-_____-___-___-_-_-_ _-_-_---_-_-_-_-_- -_ -_ 1.5"OSCH40 PJC 1tt Ntn . 3000 CONC. T THRUST BLOCK' 1.5'eSCH40 UTERAI oC�o 90 ELECTIC& CONDUIT SWEEP "w oR ar AROUND CONNECTION '6RISER (TIP.) VARIES O f4 M' O INVERT LEVEL AT fi vu�2rrt ewo (rvn 6' TO 4' TEE .' T- - I ` O O ce 1 4' ORIFICE ALTERNATE TOP & BOTTOM 60' O.C. WITH SHIELDS g x'•scx-w cl[,Ixwr p� AT ra tr0 08 � 0 (13 ORIFICES PER LATERAL) O ` a 00 or c.a. uuutaDs or rr¢ 6"eSp1 b PVC u4/IFOLDL_-_-_-_-_-_-_-_-_-_-----_-._-_-_-_- _ � °8 J T� '------------------ \ SEP nQ PIPING DETAILS V. 7 Lttn. ii 11 SIDE ELEVATION VIEW --- - - NTS DRAINAGE SYSTEM l - 1 SCALE: 1' 200' /' �0 MIRAFI 140N SOLID SECTION 4 4S• FABRIC OVER Y {> OVERLAP 12" mI {� DRILL (2) 1"0 ' HOLES 4" PEASTONE OVER PIPE 12"0 SLOTTED H-20 MORTAR ALL COMPONENTS LENGTH BETWEEN STRUTRENCHCTURES U E) % CORRUGATED HDPE PIPE SNP-) � OF 2{ o ADS N-12 OR EQUAL mom' x`235. 3 .75"-1.5" DOUBLE 150' \ C�/ WASHED STONE 2.0 (TYP.) o a o p o 3 C.B. TRAP �d 01 ALL UNSUITABLE MATERIALS TO BE REMOVED �Q p O Q..0p 12"O HDPE PIPE FOR 5' HORIZONTALLY AND TO REQUIRED DEPTH 8 - O J ELBOW AROUND ALL LEACHING TRENCH. ENGINEER TO INSPECT. 786, .o/ UNSUITABLE SUBSOIL AVERAGED 3' DEPTH, TRENCH CROSS SECTION SLOTTED H-20 PROPOSED \ ♦ 2' o� {1000 GALLON PRECAST NTS BOTTOM LEVEL AT EL. 31.9 12"0 HDPE H-20 CATCH BASIN ADJ. G.W. EL. 30.9' LEVEL BETWEEN BASINS 0X6'-8" SHOREY SOLIC v ON SOUTH END OF SITE BASIN H-20 OR EQUAL SE ' SEE ATTACHED DRAINAGE CALCULATIONS DRAINAGE r C R 0 S S SECTION NOT TO SCALE ELEVATION VIEW 8" H-20 FF(G FI 'S I IGTFF) 98-330 1. BLOCKS AS REQ. TOP OF STRUCTURE CL LEACHING _ I FINISH -ALDMINUM-HATCH--__. - ..4"O -TO-VO-EXPANSION-- - -LAWN$ 3 30 XX 0 it 1 PITCH DD5 MIN. PUMP CHAMBER -2000 GAL H-' H-2 _'-3' AIA$-. -- -_ I TYP 12" X 3" 1" TOPCOAT MASS DPW CCBERM TYPE 11 2" BINDER IOQO�O�OopOpo�0p0 12" PROCESSED GRAVEL MDPW M1.03.1 VIB. ROLLER COMPACTED SEPTIC SYSTEM DESIGN DATA OFFICE USE: 100,800SF (75 GPD/1000 SF)= 7560 GPD SYSTEM TECHNOLOGY & COMPONENTS TO BE SIZED TO DISCHARGE STORAGE USE: NO FLOW GENERATED: (400 SF OFFICE =30 GPD) EFFLUENT WHICH MEETS CCCOMMISSION GROUNDWATER STANDARDS PRELIMINARY DESIGN ILLUSTRATED: TO BE REFINED DURING PERMITTING PROCCESS. NO GARBAGE DISPOSALS ALLOWED TOTAL DESIGN FLOW = 7590 GPD. PRESSURE DOSING UTILIZED. FIX USE 12,000 GAL PUMP CHAMBER LEACHING: USE (2) 71'X100' LEACHING FIELDS = 14,200 SF (NOTE: TO BE REDUCED TO 7600 GPD CAPACITY) SYSTEM TO UTILIZE AWT BIOCLERE OR EQUAL SECONDARY TREATMENT UNITS UNDER 440 GPD/40000SF MAX. (692,168 SF)= 7613 GPD ALLOWED UNDER TITLE 5. A NERAL USE STATUS FOR DENITRIFICATION AND ENHANCED TREATMENT OF EFFLUENT. FINAL NITROGEN CONCENTRATIONS WILL BE APPROXIMATELY 19 PPM TO MEET THE CCCOMM. MASS BALANCE CALCULATION OF 5PPM AT THE PROPERTY LINE. SEE ATTACHED NITROGEN CALCULATIONS FOR SITE. DETAIL SHEET ACCOMPANYING SITE PLANT OF LAND IN WEST YARMOUTH, MA CAPE LIGHT COMMONS OFFICE PARK AND STORAGE CENTER yh�t_ SCALE AS NOTED DATE DATE: 7-19-99 REVISED: 9-20-99 (DESIGN FLOW, FIRE LANES, MISC.) PREPARED FOR: BORNSTEIN COMPANIES 297 NORTH STREET HYANNIS, MA Off 508-362- 8W lax 508 362-9680 down cape engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouthport, ma 02675 SHEET 2 OF 2 11 s r+rwc-mrn.�:LLnrr_SAN IN 3I0 CMR 15.255 'CONSTRUCTION IN FILL SPiC61E0 I REMOVE TOP & SUBSOIL COMPACT SUBBASE 31.64' REMOVE TO THE 80TTOM OF THE B LAYER AND _ _- ---- __ NY UNSUITABLE SOIL AS SHOWN A VE M E N T CROSS S E C TI 0 NEE UAL SEWAGE PUMPS NTH -RAIL -MOUNT -SYS - - . _ DETAIL SHEET _NST�NEYVD UNSUITABLE ALMAY VARY, TO NOT TO SCALE INSPECT REMOVAL SEPTIC SYSTEM DESIGN DATA OFFICE USE: 100,800SF (75 GPD/1000 SF)= 7560 GPD SYSTEM TECHNOLOGY & COMPONENTS TO BE SIZED TO DISCHARGE STORAGE USE: NO FLOW GENERATED: (400 SF OFFICE =30 GPD) EFFLUENT WHICH MEETS CCCOMMISSION GROUNDWATER STANDARDS PRELIMINARY DESIGN ILLUSTRATED: TO BE REFINED DURING PERMITTING PROCCESS. NO GARBAGE DISPOSALS ALLOWED TOTAL DESIGN FLOW = 7590 GPD. PRESSURE DOSING UTILIZED. FIX USE 12,000 GAL PUMP CHAMBER LEACHING: USE (2) 71'X100' LEACHING FIELDS = 14,200 SF (NOTE: TO BE REDUCED TO 7600 GPD CAPACITY) SYSTEM TO UTILIZE AWT BIOCLERE OR EQUAL SECONDARY TREATMENT UNITS UNDER 440 GPD/40000SF MAX. (692,168 SF)= 7613 GPD ALLOWED UNDER TITLE 5. A NERAL USE STATUS FOR DENITRIFICATION AND ENHANCED TREATMENT OF EFFLUENT. FINAL NITROGEN CONCENTRATIONS WILL BE APPROXIMATELY 19 PPM TO MEET THE CCCOMM. MASS BALANCE CALCULATION OF 5PPM AT THE PROPERTY LINE. SEE ATTACHED NITROGEN CALCULATIONS FOR SITE. DETAIL SHEET ACCOMPANYING SITE PLANT OF LAND IN WEST YARMOUTH, MA CAPE LIGHT COMMONS OFFICE PARK AND STORAGE CENTER yh�t_ SCALE AS NOTED DATE DATE: 7-19-99 REVISED: 9-20-99 (DESIGN FLOW, FIRE LANES, MISC.) PREPARED FOR: BORNSTEIN COMPANIES 297 NORTH STREET HYANNIS, MA Off 508-362- 8W lax 508 362-9680 down cape engineering, Inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouthport, ma 02675 SHEET 2 OF 2