Loading...
HomeMy WebLinkAbout0 Willow Street - Cape Light Compact - Site Plan 16BLDG 5 6400 SF IST RO 6400 SF 2140 R( SLAB EL. 38.5 JpPo Fs IF REQUIRED FOR FUTURE USE CHANGE: ALTERNATIVE PARKING ARRANGEMENT INDICATES PARKING POSSIBLE ON GROUND LEVEL OF BUILDING 8 OFFICE OR STORAGE USE ON 2ND STORY ONLY SCALE: i " = 60' NOTE: SUBJECT TO MINOR CHANGE DUE TO COLUMN PLACEMENT: ASSUME 10 SPACES LOST TO COLUMNS 133 NEW SPACES - 24 LOST SPACES = NET GAIN 109 SPACES II CI P.NG-k COKR 10 MANHOLES CLEMITL TO GRADE EJ Q�.F Q COVECS LABEL 'SEWER' N-20 CASs IRON DETAIL LIBEL 'SEWER" SEE DETHL MOTAR ALL C _-6UPuPDNENf� (TYR ) .. __ 2 CU FT CONC. ACME OR EQUAL FORMED INVERT TO -FULLPiPE_HEIGHT . 2'-10" 26" MANUF, LeBARON, BROCKTON, MA MODEL: LT 105 WEIGHT: 430 LBS TYPICAL ACCESS COVER SCALE: 3/4" = V-0" 32" 24" 24" N� 1 FRAME TH2 AND GRATE DRAINAGE SYSTEM SOIL EVALUATOR: DAN OJALA P.L.S. SCALE: 3/4" = MINIMUM WEIGHT: l' -O" 388 LBS. PARKING CALCULATIONS: OFFICE USE: 100,800 SF X 1/200 SF = 504 SPACES REQ. 504 SPACES PROVIDED (INCL. 11 ACCESSIBLE SPACES) STORAGE USE: 74,884 SF (1/200)=375 SPACES REQUIRED 36 SPACES PROVIDED (WCL. 1 ACCESSIBLE SPACE) NOTE: IF REQ.'D FUTURE PARKING EXPANSION ON GROUND LEVEL OF BLDG B YIELDS NET GAIN OF 109 SPACES FOR 145 TOTAL. FUTURE STORAGE USE: 40,892/200 = 205 REQ. ZONING RELIEF FOR 60 CARS REQUIRED. (VERSUS 339 SPACES PARKING RELIEF FOR CURRENT LAYOUT) TREE CALC: 540 SPACES -X 1 TREE/8 CARS = 68 REQ. (68+) 3" CALIPER PARKING TREES SHOWN SEE DETA;L +C A7 Q5; Y .- __ - _ SEWER Lr lb`.._ _ 11 SEPTIC 19' TEEL 9' TE STI COMPARTMENT 1 W/ GAS B E COMPARTMENT 2 W/ GAS ---15060 GAL-- - _----__. _-_-._7500 GAL_-_---. 3000 THRUST BLOCK ' AROUND CONNECTION "#R (TYR) VAI 6" TO i TEE 6"#SCH 40 PA: MANIFOLD BIOCLERE UNIT 6'PSCH40 PVC CONCRETE BALLAST /8" TH1 TH2 TH3 TH4 DRAINAGE SYSTEM SOIL EVALUATOR: DAN OJALA P.L.S. SOIL EVALUATOR: DAN OJALA P.L.S. Or DYE_SAS_AND�EPLArr-WIRiLLEANS_ Nn Ii._SPECIFIER SOIL EVALUATOR: DAN OJALA P.L.S., SE SOIL EVALUATOR: DAN OJALA P.L.S., SE SEE PAVEMENT SECTION DOWN CAPE ENGINEERING DOWN CAPE ENGINEERING H-20 RATED DOWN CAPE ENGINEERING DOWN CAPE ENGINEERING as" WITNESS: KELDA WELCH (BOH) WITNESS: KELDA WELCH (BOH) CL SYMMETRY EXCV. STEVE VAUGHN(BORTOLOTTI) EXCV. STEVE VAUGHN(BORTOLOTTI) � EXCV. SCOTT (BORTOLOTTI) EXCV, SCOTT BORTOLOTTI) DESIGN DATA DATE: 7-2-99 2 PM DATE: 7-2-99 2 PM DATE: MAY 22 1999 1 DATE: MAY 2� 1999 DUCE 0-2" 0 ORGANIC 10YR2/1 0 -2" 0 ORGANIC 10YR2/1 0-2" O ORGANIC 10YR3/2 A SAND 10YR4 0-3" 0 ORGANIC 10YR3/2 2 CU FT. MIN. 2-4" A LOAMY SAND 10YR5/2 2-4" A LOAMY SAND 10YR3/2 12-5" LOAMY 4 ! 5-38" B LOAMY SAND 10YR6/6 3-8" A LOAMY SAND TOYR4 4 8-30" B 4-36" B LOAMY SAND 2.5Y7/6 4-36" B LOAMY SAND 2.5Y7/6 38-66" Cl M/C SAND 2.5Y6/6 LOAMY SAND 10YR5/8 30-48" Cl M/C SAND 2.5Y6/6 107 GRAVEL LATERAL ON TOP TO VENT 36-60" Cl M/F SAND 2.5Y7/4 (LOWER 12" 10YR3/2) 60"-84" C2 36-66" Cl M/F SAND 2.5Y7/4 66-78' C2 SANDY LOAM 7.5YR6/6 (FIRM, UNSUITABLE) 48-68" C2 MED SAND 2.5Y7/3 LOAMY SAND 2.5Y8/4 (REMOVE C2 FOR DRAINAGE, 84"-132' C3 M/C SAND 2.5Y7/6 66"-78" C2 SILT LOAM 2.5Y6/4 (UNSUITABLE, REMOVE) 78-144"C3 M/C SAND 10YR5/6 68-168"C3 M/C SAND 2.5Y6/6 LENS OF SILT LOAM FROM 5'-10'. OK FOR SAS) 78"-138" C3 M/C SAND 2.5Y7/6 1.5"scH40 weIM GROUNDWATER FOUND AT 10.8' GROUNDWATER FOUND AT 12.0' ON SOUTH SIDE OF HOLE NO GROUNDWATER FOUND NO GROUNDWATER FOUND ,Hvn M smc ,c rIM"FNI #Go (Irv.) UNSUITABLE; REMOVE EL. 37.7 0'" EL 37.14 0" EL. 37.75 0" 0 EL. 36.7 0" 0 0 2- 0 3.. 2" 2,. A 5" A 8.1 A 4" A 4" B ZONE E B - ZONE E B B AIW247 4/99 23.9 -ZONE D-5.3 EL. 33.97 38" EL. 35.25 30" AIW247 4/99 23.9 -ZONE D-5.3 EL. 34.7 36" EL. 33.7 36" AIW230 4/99 23.5 ZONE E-4.5 - AIW230 4/99 23.5 ZONE E-4.5 C1 C1 USE 5.3' ADJ. Cl USE 5.3' ADJ. EL. 32.7 60" EL. 33.75 48" EL. 3212 66"' Cl C2 BOTTOM PERC AT 46" C2 84" C2 EL. 29.70 84" EL. 31.64 _ ADJ. WATER BOTTOM PERC AT 81" 24 GAL POURED IN 4:30 EL32.08 68" 24 GAL POURED . 6"AT 10:30 <2 MIN/IN EL. 30.70 C2 <2 MIN/IN EL. 31.05 _ ADJ. WATER El. 30.64 78" - 5.3' 5.3' C3 C3 C3 I C3SV. EL. 26.34 _ OBWATER AT 10.8' EL. 25.75 OBSV. WATER AT 12.0' 1 EL. 25.14 144" I EL. 23.75 168" EL. 26.7 132" EL. 25.2 138" TH5 SOIL EVALUATOR: DAN OJALA P.L.S., SE I DOWN CAPE ENGINEERING TH7 SOIL EVALUATOR: DAN OJALA P.L.S., SE TH8 SOIL EVALUATOR: DAN OJALA P.L.S., SE I EXCV. STEVE VAUGHN(BORTOLOTTI) TH6 (AUGER HOLE) DOWN CAPE ENGINEERING DOWN CAPE ENGINEERING I DATE: 7-2-99 2 PM SOIL EVALUATOR: DAN OJALA P.L.S. EXCV. STEVE VAUGHN(BORTOLOTTI) EXCV. STEVE VAUGHN(BORTOLOTTI) (BORTOLOTTQ DOWN CAPE ENGINEERING DATE: 7-2-99 2 PM DATE: 7-2-99 2 PM 0-2" 0 ORGANIC 10YR2/1 2-4" A LOAMY SAND 10YR5/2 DATE: 4-27-99 2 PM 0-3" 0/A. LOAMY SAND IOYR3/2 0-2" 0/A LOAMY SAND 10YR4/2 4-36" B LOAMY SAND 2.5Y7/6 0-1" 0 ORGANIC IOYR2/1 3-5" E LOAMY SAND 10YR7/2 5-34" B LOAMY SAND lOY7 S 2-4" E LOAMY SAND I0YR6/1 36-66" Cl M/F SAND 2.5Y6/4 (TRACE SILT) 1-3" A LOAMY SAND 10YR3/2 5 34-132" Cl MED SAND 2.ATER 4-36" B LOAMY SAND t0YR6/6 VARIGATED COLORS AT 84" 66"-72" C2 SILT LOAM 2.5Y7/4 (UNSUITABLE, REMOVE 3-36'" B LOAMY SAND 10YR6 8 107 GRAVEL / 36-132" Cl M/C SAND 2.5Y7/6 72"-138" C3 M/C SAND 2.576 4 / 36-126" Cl M/C SAND 2.5Y7/6 107 GRAVEL GROUNDWATER AT 10.5' GROUNDWATER AT 10.6' NO GROUNDWATER FOUND EL. 36.9 O" EL. 38.0 0" Q 2" 0 1" A EL. 35.44 O/A EL. 36.20 O" 3 3" O/A 4" B ZONE E E 5" E B EL. 33.9AIW247 4/99 23.9 -ZONE 36" D-5.3 - 4" B AIW230 4/99 23.5 ZONE E-4.5 B ZONE E ZONE E EL. 35.0 36" USE 5.3' ADJ. EL. 32.60 34" AIW247 6/99 24.3 -ZONE D-6.0 EL. 33.20 36" AIW247 6/99 24.3 -ZONE D-6.0 C7 AIW230 6/99 23.9 ZONE E-5.1 AIW230 6/99 23.9 ZONE E-5.1 EL. 32.5 66" C1 USE 6.0' ADJ. USE 6.0' ADJ. C2 72" EL. 32.0 EL. 31.8 - ADJ. WATER Ci C1 BOTTOM PERC AT 78" 24 GAL IN 8:30 5.3' EL. 30.94 _ ADJ. WATER <2 MIN/IN EL. 31.60 ADJ. WATER C3 6.0' 6.0' EL. 26.5 _ OBSV. WATER AT 10.4' EL. 26.5 EL. 26.4 126" - EL. 24.94 _ 126" EL. 25.60 127" 138" I EL. 23.55 132" _ EL. 25.20 132" 0 5 lflINVERT LEVEL AT I CB o f/i CRFK:E ALTERwTE TOP &BOTTOM , 4'vxx-4o vt O 60 0C_ WRN SHIFLOs o�g I C �1M r (13 ORIFICES PER LATERAL) ce "8 o00 08 a O0. c uN«Faos. SEEM PIPING DETAILS SIDE ELEVATION VIEW NTS SEPTIC SYSTEM SEUDN SCALE: 1" - 5' HORIZ. & VERTICAL -SOILS-AND-MN THER- UNSUITABLE SOILS ENCOUTERED BELOW AND WITHIN 5' DRAINAGE SYSTEM .- "7oo' PRELIMINARY SCHEMATIC OF DESIGN TO DEP REQ.'S Or DYE_SAS_AND�EPLArr-WIRiLLEANS_ Nn Ii._SPECIFIER L#BARON CAST IRON SEE PAVEMENT SECTION 56 1 H-20 RATED REMOVE TO THE BOTTOM OF THE 8 LAYER AND as" VALVE BOX TOFEMALE ADAPTOR & THREADED PLUG cl. Rw A CL SYMMETRY GRADE. (20) RED. � SLEEVE TO ALLOW MOVEMENT Ll: L 10MEar C) DESIGN DATA Al m POURED CONCRETE DONUT DUCE 2 CU FT. MIN. pQ TAp GRILL LAST HOLE IN EACH 1.5"0 V NT nHIKAotn lid EE LATERAL ON TOP TO VENT SCH b wC AWHILE LITERAL FILLS ------------------------------------ ---- --------- - -- -- -- -- -- 1.5"scH40 weIM 1LY L'CNC. JET- L5"PSCH40 LITERAL "80 90 ELECTICAL CONDUIT SWEEP ,Hvn M smc ,c rIM"FNI #Go (Irv.) 0 5 lflINVERT LEVEL AT I CB o f/i CRFK:E ALTERwTE TOP &BOTTOM , 4'vxx-4o vt O 60 0C_ WRN SHIFLOs o�g I C �1M r (13 ORIFICES PER LATERAL) ce "8 o00 08 a O0. c uN«Faos. SEEM PIPING DETAILS SIDE ELEVATION VIEW NTS DRILL (2) 1 "0 HOLES 1 4" PEASTONE OVER PIPE12'"4 SLOTTED H-20 MORTAR ALL COMPONENTS LENGTH BETWEEN STRUCTURES N ar ( '` CORRUGATED HDPE PIPE (NP') OF 2'X4' LEACHING TRENCH (TYP.) ^�. n' �6) ADS N-12 OR EQUAL Ho°' ♦`?3S o �763'_ J� .... ....o..;.0 .75"-1.5" DOUBLE . 150'_ ` °% �p �o `'O WASHED STONE 2' ,. 0 "�1 ALL UNSUITABLE MATERIALS TO BE REMOVED I I FOR 5' HORIZONTALLY AND TO REQUIRED DEPTH /<9 4 AROUND ALL LEACHING TRENCH. ENGINEER TO INSPECT. UNSUITABLE SUBSOIL AVERAGED 3' DEPTH. TRENCH CROSS SECTION ♦ ? NSI NTS ROTTOM I FVFI AT FI . 31 N-., 01 SEE ATTACHED DRAINAGE CALCULATIONS 98-330 1 12.0' (TYP.) 3 �LC .B. TRAP 12A EBIP Epa g 000 LLOWo SLOTTED H-20 PROPOSED 12"o HDPE 1000 GALLON PRECAST LEVEL BETWEEN BASINSH-20 CATCH BASIN ADJ. G.W. EL. 30.9" 'OX6'-8" SHOREY SOLID ON SOUTH END OF SITE BASIN H-20 OR EQUAL SECTI ONAI DRAINAGE `CROSS SECTION NOT TO SCALE 2 W".. L.x. Owl) ELEVATION VIEW J. BLOCKS AS REQ. TOP OF STRUCTURE 30" X 30" PUMP CHAMBER --_-- 12,000 GAL H-, DUAL SEWAGE PUMPS WITH 'RAIL MOUNT -SYS SEE DETAIL SHEET CL ,LEACHING. F#:KN GARDE -4"# -TO -r#-VX-A _ION _ - 3 MAX. ttR. L - - L __ PITCH .005 MIN. 5 0 -SOILS-AND-MN THER- UNSUITABLE SOILS ENCOUTERED BELOW AND WITHIN 5' DRAINAGE SYSTEM .- "7oo' i Or DYE_SAS_AND�EPLArr-WIRiLLEANS_ Nn Ii._SPECIFIER SCALE: 1" = 200' SOLID SECTION 56 1 MIRAFI 140N REMOVE TO THE BOTTOM OF THE 8 LAYER AND as" ANY UNSUITABLE SOIL AS SHOWN FABRIC OVER - --ON' TEST --HOLE-LOGS-THE-DEPTH-OF-FIE-'ANO'-- J � OVERLAP 12" C) DESIGN DATA Al m DRILL (2) 1 "0 HOLES 1 4" PEASTONE OVER PIPE12'"4 SLOTTED H-20 MORTAR ALL COMPONENTS LENGTH BETWEEN STRUCTURES N ar ( '` CORRUGATED HDPE PIPE (NP') OF 2'X4' LEACHING TRENCH (TYP.) ^�. n' �6) ADS N-12 OR EQUAL Ho°' ♦`?3S o �763'_ J� .... ....o..;.0 .75"-1.5" DOUBLE . 150'_ ` °% �p �o `'O WASHED STONE 2' ,. 0 "�1 ALL UNSUITABLE MATERIALS TO BE REMOVED I I FOR 5' HORIZONTALLY AND TO REQUIRED DEPTH /<9 4 AROUND ALL LEACHING TRENCH. ENGINEER TO INSPECT. UNSUITABLE SUBSOIL AVERAGED 3' DEPTH. TRENCH CROSS SECTION ♦ ? NSI NTS ROTTOM I FVFI AT FI . 31 N-., 01 SEE ATTACHED DRAINAGE CALCULATIONS 98-330 1 12.0' (TYP.) 3 �LC .B. TRAP 12A EBIP Epa g 000 LLOWo SLOTTED H-20 PROPOSED 12"o HDPE 1000 GALLON PRECAST LEVEL BETWEEN BASINSH-20 CATCH BASIN ADJ. G.W. EL. 30.9" 'OX6'-8" SHOREY SOLID ON SOUTH END OF SITE BASIN H-20 OR EQUAL SECTI ONAI DRAINAGE `CROSS SECTION NOT TO SCALE 2 W".. L.x. Owl) ELEVATION VIEW J. BLOCKS AS REQ. TOP OF STRUCTURE 30" X 30" PUMP CHAMBER --_-- 12,000 GAL H-, DUAL SEWAGE PUMPS WITH 'RAIL MOUNT -SYS SEE DETAIL SHEET CL ,LEACHING. F#:KN GARDE -4"# -TO -r#-VX-A _ION _ - 3 MAX. ttR. L - - L __ PITCH .005 MIN. 12" X 3" 1" TOPCOAT MASS DPW CCBERM /_ TYPE 11 12" PROCESSED GRAVEL MDPW M1.03.1 VIB. ROLLER COMPACTED REMOVE TOP &,SUBSOIL COMPACT SUBBASE NOT TO SCALE OFFICE USE: 100,800SF (75 GPD/1000 SF) = 75,60 Gn SYSTEM TECHNOLOGY & COMPONENTS TO BE SIZED TO DISCHARGE STORAGE USE: NO FLOW GENERATED: (400 SF OFFICE =30 GPD) EFFLUENT WHICH MEETS CCCOMMISSION GROUNDWATER STANDARDS PRELIV'!�!JRY DESIGN ILLUSTRATED: TO BE REFINED DURING PERMITTING PROCCESS. NO GARBAGE DISPOSALS ALLOWED TOTAL DESIGN FLOW = 7590 GPD. PRESS'JFE DOSING UTILIZED. P/C: USE 12,000 GAL PUMP CHAMBER LEACH!.: USE (2) 71'X100' LEACHING FIELDS = 14,200 SF (NOTE: TO BE REDUCED TO 7600 GPD CAPACITY) SYSTEM TO UTILIZE AWT BIOCLERE OR EQUAL SECONDARY TREATMENT U!:TS UNDER 440 GPD/40000SF MAX. (692,168 SF)= 7613 GPD ALLOWED UNDER TITLE 5. GENERAL USE STATUS FOR DENITRIFICATION AND ENHANCED TREATMENT CF EFFLUENT. FINAL NITROGEN CONCENTRATIONS WILL BE APPROXIMATELY 19 PPV TO MEET THE CCCOMM. MASS BALANCE CALCULATION OF 5PPM AT THE PROPERTY LNE. SEE A_TAC=ED NITROGEN CALCULATIONS FOR SITE. DETAIL SHEET ACCOMPANYING SITE PLAN OF LAND IN WEST YARMOUTH, MA CAPE LIGHT COMMONS OFFICE PARK AND STORAGE CENTER ?A�t_ SCALE AS NOTED DATE: 7-19-99 DATE REVISED: 9-20-99 (DESIGN .FLOW, FIRE LANES, MISC.) PREPARED FOR: BORNSTEIN COMPANIES 297 NORTH STREET HYANNIS, MA off 508-362-9581 lax 508 362-9880 d SHEET 2 OF 2 own cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouthport, ma 02675 5 0 -SOILS-AND-MN THER- UNSUITABLE SOILS ENCOUTERED BELOW AND WITHIN 5' LATERALLY IN ALL DIRECTIONS FROM THE OUTER PERIMETER i Or DYE_SAS_AND�EPLArr-WIRiLLEANS_ Nn Ii._SPECIFIER IN 310 CMR 15.255 'CONSTRUCTION IN RLL" } 1 64' _----ADJ'NICH-Cn' REMOVE TO THE BOTTOM OF THE 8 LAYER AND ANY UNSUITABLE SOIL AS SHOWN - --ON' TEST --HOLE-LOGS-THE-DEPTH-OF-FIE-'ANO'-- UNSUITABLE MATERIAL MAY VARY, ENGINEER TO INSPECT REMOVAL. SEPTIC SYSTEM DESIGN DATA 12" X 3" 1" TOPCOAT MASS DPW CCBERM /_ TYPE 11 12" PROCESSED GRAVEL MDPW M1.03.1 VIB. ROLLER COMPACTED REMOVE TOP &,SUBSOIL COMPACT SUBBASE NOT TO SCALE OFFICE USE: 100,800SF (75 GPD/1000 SF) = 75,60 Gn SYSTEM TECHNOLOGY & COMPONENTS TO BE SIZED TO DISCHARGE STORAGE USE: NO FLOW GENERATED: (400 SF OFFICE =30 GPD) EFFLUENT WHICH MEETS CCCOMMISSION GROUNDWATER STANDARDS PRELIV'!�!JRY DESIGN ILLUSTRATED: TO BE REFINED DURING PERMITTING PROCCESS. NO GARBAGE DISPOSALS ALLOWED TOTAL DESIGN FLOW = 7590 GPD. PRESS'JFE DOSING UTILIZED. P/C: USE 12,000 GAL PUMP CHAMBER LEACH!.: USE (2) 71'X100' LEACHING FIELDS = 14,200 SF (NOTE: TO BE REDUCED TO 7600 GPD CAPACITY) SYSTEM TO UTILIZE AWT BIOCLERE OR EQUAL SECONDARY TREATMENT U!:TS UNDER 440 GPD/40000SF MAX. (692,168 SF)= 7613 GPD ALLOWED UNDER TITLE 5. GENERAL USE STATUS FOR DENITRIFICATION AND ENHANCED TREATMENT CF EFFLUENT. FINAL NITROGEN CONCENTRATIONS WILL BE APPROXIMATELY 19 PPV TO MEET THE CCCOMM. MASS BALANCE CALCULATION OF 5PPM AT THE PROPERTY LNE. SEE A_TAC=ED NITROGEN CALCULATIONS FOR SITE. DETAIL SHEET ACCOMPANYING SITE PLAN OF LAND IN WEST YARMOUTH, MA CAPE LIGHT COMMONS OFFICE PARK AND STORAGE CENTER ?A�t_ SCALE AS NOTED DATE: 7-19-99 DATE REVISED: 9-20-99 (DESIGN .FLOW, FIRE LANES, MISC.) PREPARED FOR: BORNSTEIN COMPANIES 297 NORTH STREET HYANNIS, MA off 508-362-9581 lax 508 362-9880 d SHEET 2 OF 2 own cape engineering, inc. CIVIL ENGINEERS LAND SURVEYORS 939 main st. yarmouthport, ma 02675