Loading...
HomeMy WebLinkAbout38 Winter Street - Site PlanTOP HOUSE FNDN, AT EL 33.8' SYSTEM PROFILE TOP GARAGE SLAB FNDN. AT EL 32.5' (Norr To SCALE) ACCESS COVERS TO WITHIN 6' OF FIN. GRADE ACCESS COVER (WATERTIGHT) TO ACCESS COVER TO WITHIN 3' OF FIN. � GRADE MINIMUM .75' OF COVER OVER PRECAST FWITHIN 6' OF FIN. GRADE 2% SLOPE REQUIRED OVER SYSTEM 'A-29.75' =29.52' 29.27' 29.1' 1000 GAL.. ( 2.5x SLOPE) DEPTH OF FLOW = 4' TEE SIZES: INLET DEPTH = �_ OUTLET DEPTH 14" A=19' FOUNDATION— B=10' — SEPTIC TANK LEGEND PROPOSED 1500 Iff/LL.LON SEPTIC TANK (DUAL COMPARTMENT) H-10 C CRUSHED STONE OR MECHANICAL COMPACTION. (15.221 [211 H-20 DBOX (j—x SLOPE) RUN PIPE LEVEL FOR FIRST 2' 2' DOUBLE WASHED PEASTONE OR GEOTEXTILE FABRIC 3/4" TO 1 1/2" DOUBLE WASHED STONE (3) H-20 500 GAL CHAMBERS (� X SLOPE) 20' D' BOX 21' 'THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM 100.0 PROPOSED SPOT ELEVATION +100.00 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 100 EXISTING CONTOUR TEST HOLE LOGS ENGINEER: DAVID FLAHERTY, R.S., SE2755 WITNESS: AMY VON HONE, R.S., C.H.O. DATE: NOVEMBER 20, 2007 PERC. RATE _ < 2 MIN/INCH CLASS 1 SOILS P# 12" Q A LS 1OYR 4/2 ELEV. 31.5' B LS 36"1 OYR 6/6 128.5' C MS 2.5Y 7/4 0" 12" 32" Q A LS 1OYR 4/2 B LS 1OYR 6/6 C 2.5Y 7/4 120"1 121.5' 120" NO GROUNDWATER ENCOUNTERED DCE #07-303 ELEV. 32.0' HIGH ON S1 LEACHING FACILITY ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. NOTES (SEE VENT NOTE ON PUN) 1. DATUM IS APPROXIMATE NGVD 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 3' MAX. I m COMPARTMENT TANK TO BE AASHO H-10, DBOX & 500 ' 29:2�65' GALLON CHAMBERS TO BE H-20. 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO 3/4" TO 1 1/2" DOUBLE WASHED STONE (3) H-20 500 GAL CHAMBERS (� X SLOPE) 20' D' BOX 21' 'THE INSTALLER SHALL VERIFY THE LOCATIONS OF ALL UTILITIES AND ALL BUILDING SEWER OUTLETS AND ELEVATIONS PRIOR TO INSTALLING ANY PORTION OF SEPTIC SYSTEM 100.0 PROPOSED SPOT ELEVATION +100.00 EXISTING SPOT ELEVATION 100 PROPOSED CONTOUR 100 EXISTING CONTOUR TEST HOLE LOGS ENGINEER: DAVID FLAHERTY, R.S., SE2755 WITNESS: AMY VON HONE, R.S., C.H.O. DATE: NOVEMBER 20, 2007 PERC. RATE _ < 2 MIN/INCH CLASS 1 SOILS P# 12" Q A LS 1OYR 4/2 ELEV. 31.5' B LS 36"1 OYR 6/6 128.5' C MS 2.5Y 7/4 0" 12" 32" Q A LS 1OYR 4/2 B LS 1OYR 6/6 C 2.5Y 7/4 120"1 121.5' 120" NO GROUNDWATER ENCOUNTERED DCE #07-303 ELEV. 32.0' HIGH ON S1 LEACHING FACILITY ALL SYSTEM COMPONENTS SHALL BE MARKED WITH MAGNETIC TAPE OR COMPARABLE MEANS FOR FUTURE LOCATION. 5' 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED LOCUS MAP WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. SCALE: 1" = 2,000'± 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING ASSESSORS MAP 107 PARCEL 43 BOTTOM TH-1 EL. 21.5' DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO LOCUS IS NOT WITHIN APD (ZONE II) COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. >YSTEM DESIGN: IRBAGE DISPOSER IS NOT ALLOWED :SIGN FLOW. 4 BEDROOMS ® 110 GPD = 440 GPD iE A 440 GPD DESIGN FLOW :PTIC TANK: 440 GPD (2) = 880 ;E A 15GO GAL SEPTIC TANK (OLIA.L COMPARTMENT) :ACHING: DES: 2 (33.5 + 12.83) 2 (.74) = 137 GPD )TTOM 33.5 x 12.83 (.74) = 318 GPD )TAL: 615 S.F. 455 GPD iE (3) 500 GAL LEACHING CHAMBERS (ACME OR EQUAL) TH 4' STONE ALL AROUND , MA PROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF 38 WINTER ST. ARMOUTH (PORT), MA PREPARED FOR . JAMES MILANO DATE: NOVEMBER 20, 2007 off 508-362-4541 fax 508 362-9880 down cape engineering, inc. C/V IL ENGINEERS LAND SURVEYORS 939 Main Street — YARAAOUTh/PORT, MASS. 07-303 HISTORIC -15 ft setbacks.DWG (DDF) NOTES (SEE VENT NOTE ON PUN) 1. DATUM IS APPROXIMATE NGVD 2. MUNICIPAL WATER IS AVAILABLE 3. MINIMUM PIPE PITCH TO BE 1/8" PER FOOT. 3' MAX. 4. DESIGN LOADING FOR PROPOSED PRECAST DUAL COMPARTMENT TANK TO BE AASHO H-10, DBOX & 500 ' 29:2�65' GALLON CHAMBERS TO BE H-20. 5. PIPE JOINTS TO BE MADE WATERTIGHT. 6. CONSTRUCTION DETAILS TO BE IN ACCORDANCE WITH MASS. ENVIRONMENTAL CODE TITLE V. 7. THIS PLAN IS FOR PROPOSED WORK ONLY AND NOT TO BE USED FOR LOT UNE STAKING OR ANY OTHER PURPOSE. 8 PIPE FOR SEPTIC SYSTEM TO SCH. 40-4" PVC. 5' 9. COMPONENTS NOT TO BE BACKFILLED OR CONCEALED LOCUS MAP WITHOUT INSPECTION BY BOARD OF HEALTH AND PERMISSION OBTAINED FROM BOARD OF HEALTH. SCALE: 1" = 2,000'± 10. CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING ASSESSORS MAP 107 PARCEL 43 BOTTOM TH-1 EL. 21.5' DIGSAFE (1-888-344-7233) AND VERIFYING THE LOCATION OF ALL UNDERGROUND & OVERHEAD UTILITIES PRIOR TO LOCUS IS NOT WITHIN APD (ZONE II) COMMENCEMENT OF WORK. 11. ANY UNSUITABLE MATERIAL ENCOUNTERED SHALL BE REMOVED 5' BENEATH AND AROUND THE PROPOSED LEACHING FACILITY. >YSTEM DESIGN: IRBAGE DISPOSER IS NOT ALLOWED :SIGN FLOW. 4 BEDROOMS ® 110 GPD = 440 GPD iE A 440 GPD DESIGN FLOW :PTIC TANK: 440 GPD (2) = 880 ;E A 15GO GAL SEPTIC TANK (OLIA.L COMPARTMENT) :ACHING: DES: 2 (33.5 + 12.83) 2 (.74) = 137 GPD )TTOM 33.5 x 12.83 (.74) = 318 GPD )TAL: 615 S.F. 455 GPD iE (3) 500 GAL LEACHING CHAMBERS (ACME OR EQUAL) TH 4' STONE ALL AROUND , MA PROVED DATE BOARD OF HEALTH TITLE 5 SITE PLAN OF 38 WINTER ST. ARMOUTH (PORT), MA PREPARED FOR . JAMES MILANO DATE: NOVEMBER 20, 2007 off 508-362-4541 fax 508 362-9880 down cape engineering, inc. C/V IL ENGINEERS LAND SURVEYORS 939 Main Street — YARAAOUTh/PORT, MASS. 07-303 HISTORIC -15 ft setbacks.DWG (DDF)