Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
36.106.1 - Septic and Parking Requirements
SEPTIC REQUIREMENTS EXISTING DESIGN FLOW: BUILDING 1 REQUIREMENTS BUILDING 1 = 2 BEDROOMS AT110G.P.B. 2 BEDROOMS AT 110 G.P.B. 220 G.P.D. 615 S.F. OF RETAIL@50/1000 31 G.P.D. 1 CANDY MAKER & 1 EMPL,1215 30 G.P.D. KITCHEN AREA 51 G.P.D. 3 ICECREAM WINDOWS@130 390 G.P.D. (2 SOFT SERVE MACHINES) ww(1.5 PER HOLE + 845 1640 S.F. OFFICE @75/1000 123 G.P.D. 845 G.P.D. EXISTING DESIGN FLOW: BUILDING 2 4,962 S.F, OF RETAIL@50/1000 250 G.P.D. FORMER TREASURE ISLAND WALKING TRAILS 1,250 G.P.D. 1,500 G.P.D. EXISTING DESIGN FLOW: BUILDING 3 18 HOLES OF MINATURE GOLF @50GAL / PER HOLE 1.800 G.P.D. 1,800 G.P.D. EXISTING DESIGN FLOW: SYSTEM 1 = 845 G.P.D. SYSTEM 2 = 1,500 G.P.D. SYSTEM 3 = 900 G.P.D. TOTAL FLOW 3,245 G.P.D. PROPOSED DESIGN FLOW: BUILDING 1 REQUIREMENTS BUILDING 1 = 2 BEDROOMS AT110G.P.B. 220 G.P.D. 615 S.F. OF RETAIL@50/1000 31 G.P.D. 1 CANDY MAKER & 1 EMPL.@15 30 G.P.D. KITCHEN AREA 51 G.P.D. 3 ICECREAM WIND❑WS@130 390 G.P.D. (2 SOFT SERVE MACHINES) & 30 FOR WALKING TRAILS) TOTAL REQUIRED 1640 S.F, OFFICE @75/1000 123 G.P.D. ww(1.5 PER HOLE + 845 G.P.D. PROPOSED DESIGN FLOW: BUILDING 2 4,962 S.F. OF RETAIL / OFFICE @75 GAL / 1000 375 G.P.D. 375 G.P.D. PROPOSED DESIGN FLOW. BUILDING 3 18 HOLES OF MINATURE GOLF 250GAL / PER HOLE 1.800 G.P.D. 1,800 G.P.D. PROPOSED DESIGN FLOW: BUILDING 4 6,920 S.F. OF RETAIL / OFFICE @75 GAL / 1000 520 G.P.D. 5 (1) BEDROOM APPARTMENTS @ 110 GPD / BEDROOM 550 G.P.D. PROPOSED DESIGN FLOW: SYSTEM 1 = 845 G.P.D. SYSTEM 2 = 375 G.P.D. SYSTEM 3 = 900 G.P.D. SYSTEM 4 = 1,070 G.P.D. TOTAL FLOW 3,190 G.P.D. 1,070 G.P.D. PARKING REQUIREMENTS EXISTING PARKING REQ.: BUILDING 1 2 BEDROOMS IN 1 APPARTMENT 2 SPACES 615 S.F. OF RETAIL@1/200 S.F. 4 SPACES 1 CANDY MAKER & 1 EMPLOYEE 2 SPACES 3 ICECREAM WIND❑WS @ 3 PER WIND❑W OFFICE 1640 S.F. 1/200 S.F. PROPOSED PARKING REQ.: BUILDING 1 2 BEDROOMS IN 1 APPARTMENT 2 SPACES 615 S.F. OF RETAIL@1/200 S.F. 4 SPACES µ1 CANDY MAKER & 1 EMPLOYEE 2 SPACES tJ3c 3 ICECREAM WINDOWS 9 SPACES @ 3 PER WIND❑W 9 SPACES OFFICE 1640 S.F. 1/200 S.F. 28 SPACES X/a® EXISTING PARKING REQ.: BUILDING 2 4,962 S.F, OF RETAIL/OFFICE@1/200 25 SPACES FORMER TREASURE ISLAND WALKING TRAILS 30 SPA( 55 SPACES EXISTING PARKING REQ.: BUILDING 3 18 HOLES OF MINATURE GOLF @ 1.5 SPACE / PER HOLE 27 SPACES EMPLOYEES _2 SPACES 29 SPACES 9 SPACES 9 SPACES 28 SPACES f PROPOSED PARKING REQ.: BUILDING 2 4,962 S.F. OF R TAIL/OFFICE@1/200 25 SPACES PROPOSED PARKING REQ.: BUILDING 3 18 HOLES OF MINATURE GOLF @ 1.5 SPACE / PER HOLE 27 SPACES EMPLOYEES 2 SPACES 29 SPACES r/ E6,920 ROPOSED PARKING REQ.: BUILDING 4 S.F. OF RETAIL/OFFICE@1/200 35SPACESJ,7 APPARTMENTS l / 10 SPACES 45 SPACES EXISTING PARKING REQUIR IPROPOSED PARKING REQUIREMENTS BUILDING 1 = 28 SPACES BUILDING 1 = 28 SPACES BUILDING 2 = 55 SPACESw BUILDING 2 = 25 SPACES BUILDING 3 = 29 SPACESww BUILDING 3 = 29 SPACESww TOTAL REQUIRED 112 SPACES BUILDING 4 = _ 45 SPACES )K(25 FOR BUILDING & 30 FOR WALKING TRAILS) TOTAL REQUIRED 127 SPACES ` ww(1,5 PER HOLE + 2 EMPLOYEES) ww(1.5 PER HOLE + 2 EMPLOYEES) EXISTING PARKING: TOTAL PROVIDED 105 SPACES PROPOSED PARKING: TOTAL PROVIDED 121 SPACES hh � ft� NOTE: WHEN BUILDING 1 (ICE CREAM STORE) AND 2 BUILDING 3 (MINIATURE GOLF) IS AT ITS PEAK /1/° TIME — WEEKEND TIME — THE OFFICE BUILDINGS � � Z WILL BE AT ITS LOWEST AND VISA—VERSA, AS A RESULT SOME OVERLAP OF PARKING SPACES �7 WILL BE POSSIBLE. — WEEKDAY PARKING REQUIREMENTS BUILDING 1 = 22 SPACES BUILDING 2 = 25 SPACES BUILDING 3 = 19 SPACES BUILDING 4 = 45 SPACES TOTAL REQUIRED 111 SPACES AVAILABLE WEEKDAY PARKING: TOTAL PROVIDED 121 SPACES 0 AVAILABLE WEEKEND PARKING: TOTAL PROVIDED 121 SPACES REVISIONS: NO. DATE DES( SN A4 wR DIBB CML No. 15937 dik- NAL ENGINI PROP CONDI PLAN 0 #44, #489 ROUTE 28-� WEST YA MASSACI (BARNSTABI. MAY 11 SEF PARI REQUIRI PREPARI CODE REi 52 SHIPS E OSTEF MA 0 BSC 349 Main Street, U W. Yarmouth Mas: 02673 © 2007 The BSC Group, SCALE: 1" = 3 0 3.75 7.5 0 ,._. 15 30 PROJ. MGR.: C. FIELD FIELD: D. GAZZOLO / CALC./DESIGN: K. HE DRAWN: K. HEALY CHECK: C. FIELD FILE: 9178SITE.DWG DWG. NO: 5766-04 JOB. NO: 4-9178.00 WEEKEND PARKING REQUIREMENTS BUILDING 1 = 19 SPACES BUILDING 2 = 25 SPACES BUILDING 3 = 29 SPACES BUILDING 4 = 10 SPACES TOTAL REQUIRED 83 SPACES AVAILABLE WEEKEND PARKING: TOTAL PROVIDED 121 SPACES REVISIONS: NO. DATE DES( SN A4 wR DIBB CML No. 15937 dik- NAL ENGINI PROP CONDI PLAN 0 #44, #489 ROUTE 28-� WEST YA MASSACI (BARNSTABI. MAY 11 SEF PARI REQUIRI PREPARI CODE REi 52 SHIPS E OSTEF MA 0 BSC 349 Main Street, U W. Yarmouth Mas: 02673 © 2007 The BSC Group, SCALE: 1" = 3 0 3.75 7.5 0 ,._. 15 30 PROJ. MGR.: C. FIELD FIELD: D. GAZZOLO / CALC./DESIGN: K. HE DRAWN: K. HEALY CHECK: C. FIELD FILE: 9178SITE.DWG DWG. NO: 5766-04 JOB. NO: 4-9178.00